230 likes | 405 Views
CERN Trip Report: April 4-8, 2011. LAFS Work Elliott McCrory April 20, 2011. Outline. People Jones and the BI folks Sigerud & Deghaye Hatziangeli Lamont And, of course, Lahey. Projects Existing work Potential Future Work. USD/CHF. $100 = 111.17 CHF (!). Beam Instrumentation Folks.
E N D
CERN Trip Report: April 4-8, 2011 LAFS Work Elliott McCrory April 20, 2011
Outline • People • Jones and the BI folks • Sigerud & Deghaye • Hatziangeli • Lamont • And, of course, Lahey. • Projects • Existing work • Potential Future Work LAFS
USD/CHF $100 = 111.17 CHF (!) LAFS
Beam Instrumentation Folks • Rhodri Jones & Lars Jensen • Satisfied with Schottky work • Proposed a new Daemon/GUI project for bunch-by-bunch measurement and display • Details coming… LAFS
BE/CO/Applications Folks • Katarina and Stephane • They strongly acknowledge the good work that the LAFS team has provided and can provide • RBAC • Daemon Infrastructure • Operations Applications • Propose a new project to help with InCA (Injector Controls Architecture) and LSA database configurations. • Details coming… LAFS
Department Heads • Eugenia (BE/CO) • Will initiate the creation of a new M.O.U. for our bosses (Paul Collier and Roger Dixon) • Mike (BE/OP) • Described the week’s work, and the status of LAFS • They said • Words of encouragement • Would like to see more contributions LAFS
Status of Existing Work Supertable Wire Scanner App Schottky Suite BSRT (Synchrotron Light) App
Supertable • Taken over by BE/CO (Mario) • Prototype is working • Cern.ch/test-supertable • Not online: Need work from DM LAFS
Wire Scanner • Bunch-by-bunch capabilities fully integrated • Listened to lots of criticism/suggestions for improvement. New LAFS
Schottky Suite • Daemon and GUI • Only bunch-by-bunch device active! • Well, there’s the Fast BCT, too. • BSRT is almost there. • Used extensively • Favier, Pieloni, Mounet • Just implemented: • Play List • Save/Restore LAFS
Schottky Emittances LAFS
Slot Selection GUI LAFS
Schottky Play List LAFS
Synchrotron Light • Unclear future for LAFS • They proposed that we write a Daemon • Started in early February • Was not accepted (late February) • Talk of having a new GUI created • Not good • Terri and I are paying attention! LAFS
Proposals BI: Bunch data display CO/AP: LSA Config GUIs
Project Proposal: BI Bunch GUI • A new BI GUI • Imagined by Rhodri, Lars and Jean-Jacques Gras • Basics: • Gather bunch-by-bunch info from all BI devices that do bunch-by-bunch • Schottky (Daemon) • Fast BCT • BSRT (soon) • Concentrated in one place • a Daemon • Republish in coherent manner • Create a GUI • Configure the Daemon • Allow easy access to all bunch-by-bunch data • Proposal letter (pre-requirements) coming • Audience: LAFS team, BI group, P. Collier and R. Dixon. LAFS
Proposal: LSA DB Config GUIs • Katarina and Stephane • Need a simpler way to configure the LSA device database • LSA Database being pushed into injector • Have existing tools, but must be replaced • Configure front ends directly, through a non-standard interface • But easy for PS-Complex operators to use • LHC/SPS Situation? • Only Extreme experts can configure • Requires raw SQL (through Benthic) LAFS
LSA DB Config GUIs, cont’d • A limited number of GUIs are required • Less than ten? • But we would develop the pattern for making more • Stephane will write a proposal letter • Target: LAFS team, E. Hatziangeli, M. Lamont, P. Collier and R. Dixon. • Proposed team: • Deghaye would be the liaison • Katarina and Mike would designate a “customer” • LAFS team will decide on a work group LAFS
Proposals: Next steps? • Awaiting these documents • Jones (Bunch data concentrator and GUI) • Stephane (LSA Configuration GUIs) • Eugenia (M.O.U. proposal) • Analyze LAFS work force • Now: 1.x FTE (Jerry and me), plus Terri. • Can we increase that number? • Are *YOU* interested in these new projects??? • The End LAFS