50 likes | 285 Views
Expansion of Build Program. Expansion of Build Program in:MobilityE
E N D
1. Mike Burghardt -
The Future of the OTV/SAV Program 1
2. Expansion of Build Program Expansion of Build Program in:
Mobility
E&I work
BBs/DRs
HI, GU, JM, PR, VI
Assistant SAV 2
3. E&I Drawings on WoodDuck ATT-CO National
Primary source (all entities)
Standardized format
CO 13-State (legacy SBC)
CO 9-State (legacy BellSouth)
Legacy-T (legacy AT&T)
Consolidation of Transport E&I Drawings to WoodDuck from InfoSWAP
Inactive
Provide historic information; not maintained (all entities)
Job-Aid
Incomplete due to not-completely standard deployment 3
4. Technical Publications AT&T Standards for NP&E work
All RCNs published
TP content updated with RCN publication
Review to merge TP76300/76301 and TP76400/76401
4
5. Building Blocks FPQ policy/process review
Standard Build Program Guidelines (FPQ DRIVERS)
FPQ DR description should answer What, Where, and Why the effort was required.
Guidelines document provides many examples for BB utilization (words and pictorial)
Need for new BBs/DRs (mb3192@att.com)
Use of BB Review Template
Concerned about BB/DR pricing
Do not negotiate pricing with MEIs
Future BB Release cycles (more often) 5