Mike Burghardt - The Future of the OTV/SAV Program. Expansion of Build Program. Expansion of Build Program in: Mobility E&I work BBs/DRs HI, GU, JM, PR, VI Assistant SAV. E&I Drawings on WoodDuck. ATT-CO National Primary source (all entities) Standardized format
E N D
Mike Burghardt - • The Future of the OTV/SAV Program
Expansion of Build Program • Expansion of Build Program in: • Mobility • E&I work • BBs/DRs • HI, GU, JM, PR, VI • Assistant SAV
E&I Drawings on WoodDuck • ATT-CO National • Primary source (all entities) • Standardized format • CO 13-State (legacy SBC) • CO 9-State (legacy BellSouth) • Legacy-T (legacy AT&T) • Consolidation of Transport E&I Drawings to WoodDuck from InfoSWAP • Inactive • Provide historic information; not maintained (all entities) • Job-Aid • Incomplete due to not-completely standard deployment
Technical Publications • AT&T Standards for NP&E work • All RCNs published • TP content updated with RCN publication • Review to merge TP76300/76301 and TP76400/76401
Building Blocks • FPQ policy/process review • Standard Build Program Guidelines (FPQ DRIVERS) • FPQ DR description should answer What, Where, and Why the effort was required. • Guidelines document provides many examples for BB utilization (words and pictorial) • Need for new BBs/DRs (mb3192@att.com) • Use of BB Review Template • Concerned about BB/DR pricing • Do not negotiate pricing with MEIs • Future BB Release cycles (more often)