1 / 6

INTERCONNECT WORKING GROUP 4 April 2005 Interconnect Billing Issues – EBC Proposals

INTERCONNECT WORKING GROUP 4 April 2005 Interconnect Billing Issues – EBC Proposals. COLIN ROCHESTER Interconnect Billing.

Download Presentation

INTERCONNECT WORKING GROUP 4 April 2005 Interconnect Billing Issues – EBC Proposals

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. INTERCONNECT WORKING GROUP4 April 2005Interconnect Billing Issues – EBC Proposals COLIN ROCHESTERInterconnect Billing The information in this presentation relates to plans currently under development and subject to consultation, and may be subject to change. Detailed implementation depends upon a number of factors including the capabilities of suppliers and the final 21CN network design.

  2. Scope • This presentation covers: • Definition of EBC charge bands for interconnect at NGS • Retention of LES rate (one option under consideration) • This presentation does not cover: • Charging for entitlement to LES rate (“Virtual IECs” etc.) • Interconnect direct to 21CN

  3. Current EBC structure (internal)

  4. “Frozen” EBC • At the start of the 21CN rollout, BT geographic number ranges will be retarded by PP (DLE) to a length no shorter than the national numbering group. This is to ensure that live ranges will map to a logical DLE area, even when hosted on 21CN • Before the 21CN rollout, the last BT-terminating POC-PP matrix will be frozen (stored as static data). The PPs will match to the frozen number range / PP data above.

  5. Frozen EBC #2 • Live BT number ranges will be used as a look-up into the frozen EBC matrix • BT re-parenting is thus ignored (PSTN-PSTN or PSTN-21CN) • If a new national number group is introduced then this and its hosting exchange will be added to the frozen data. If hosted on the 21CN then the 21CN switch will be treated as a DLE, using 21CN / NGS connectivity to define the EBC charge

  6. Continued LES rate via EBC matrix • This proposed mechanism represents current thinking and is subject to change • Additional data will be held in BT’s billing system such that for traffic delivered to (and received from) an NGS, depending on the traffic type / direction and CP concerned, charging will “jump” to a DLE POC in the EBC matrix • This “override” data will be available to CPs via the TAMs • CPs need only change their systems to verify BT bills; for billing BT (INCA/CLI) this will have been built into the NTS EBC charging data

More Related