Case Studies from Municipalities in Westchester County Mount Kisco  Mamaroneck  Ossining

Case Studies from Municipalities in Westchester County Mount Kisco  Mamaroneck  Ossining. December 14, 2018. Town of Mamaroneck Case Study. Stephen Altieri , Town Administrator. Hommocks Park Ice Rink Community Solar. Town Goals/Priorities RFP Process Project Status

sandra_john
Download Presentation

Case Studies from Municipalities in Westchester County Mount Kisco  Mamaroneck  Ossining

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Case Studies from Municipalities in Westchester County • Mount Kisco Mamaroneck  Ossining • December 14, 2018

  2. Town of Mamaroneck Case Study Stephen Altieri, Town Administrator

  3. Hommocks Park Ice Rink Community Solar • Town Goals/Priorities • RFP Process • Project Status • Subscription Plans • Estimated Completion: Q1 / Q2 2019 • System Size: Approx. 500 kW DC

  4. Village of Mount Kisco Case Study Gina Picinich, Mayor Edward Brancati, Village Administrator

  5. Mount Kisco Landfill Community Solar • Village Goals/Priorities • RFP Process • Issues specific to landfills • Project Status • Subscription Plans • Estimated Completion • System Size • Considerations for other municipalities

  6. Mt. Kisco Solar Law: Objectives and Challenges Objectives Provide opportunity for private property owners More community solar Challenges Small geographic area (3.2 square miles) Green space vs. solar

  7. Mt. Kisco: Modified NYSERDA Solar Law Tier 1 - Building Permit Roof Mounted Building Mounted Structure Mounted less than 750 square feet Tier 2 - Reserved for future use Tier 3 - Planning Board - Special Permit Ground Mounted & Open Air Carports Specified districts Follow underlying zoning regulations

  8. Town of Ossining Case Study Dana Levenberg, Town Supervisor

  9. Solar in Ossining • Town Goals/Priorities • Local Law #6: Solar Law Reform • Solarize Ossining-Briarcliff • Community Solar available to Ossining residents

  10. Ossining Solar Law: Local Law #6 Objectives Standardize solar permitting, installation, establish lot size requirements, establish decommissioning procedures, etc. Create tiers of classification for solar PV systems.

  11. Q&A and Next Steps • December 14, 2018