90 likes | 515 Views
2 Parallel 250 bbl Mud Systems. w/ separate HT-400 Pumps. LSU WELL FACILITY. LSU Well
E N D
3. 2787’ deep Well #1 simulating subsea well allowing gas injection and lost returns
5884’ deep Well #2 simulating surface well allowing gas injection and logs in annulus
3 - 2000’ deep gas storage wells
1200’ deep diverter demonstration well
45’, 0 - 90 degree, inclinable flow tube
9600’, 4.5” o.d. horizontal flow loop Well and Flow System Capabilities
5. 2 - HT400 cementing pumps
Two high capacity mud-gas separators
Two mud de-gassers
3 - 200 bbl mud tanks + special tanks
Choke manifold for up to 5 chokes
Multiple charge and transfer pumps
Shale shaker
Mud hopper
Inlet and outlet meters for gas and liquids Circulation System Capabilities
7. Support Utilities 480 vac, 3-phase, circuits up to 100 amps
120 vac, 1-phase, circuits up to 30 amps
100 psig air supply (30 hp)
City water
Well Water
Natural gas (600 psig continuous, up to 3500 psig intermittent)
Instrumentation for measuring pressure, temperature, and liquid and gas flow rates
9. Facilities to Support Training, Research, and Testing 2 - 20 person classrooms (1 with audio visual support, 1 adaptable as lunch room or demo room, includes 3 Restrooms)
Computer lab with 7 PC’s
Labview data collection system
Mobile crane and fork lift
Indoor and outdoor shop areas
Guttered areas with drain to sump for catching spill and leaks