An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. Environmental Energy Technologies Division • Energy Analysis Department Renewables Portfolio Standards: An Opportunity for Expanding State Solar Markets Ryan Wiser and Mark Bolinger Lawrence Berkeley National Laboratory November 2007

    2. Environmental Energy Technologies Division • Energy Analysis Department

    3. Environmental Energy Technologies Division • Energy Analysis Department What Is a Renewables Portfolio Standard?

    4. Environmental Energy Technologies Division • Energy Analysis Department State RPS Policies: 25 States and D.C.

    5. Environmental Energy Technologies Division • Energy Analysis Department Actual and Expected Impacts of State RPS Policies Are Sizable

    6. Environmental Energy Technologies Division • Energy Analysis Department Presentation Overview 1. Overview of State RPS Policies 2. The “Problem” for Solar Electricity 3. Supporting Solar within State RPS Policies 4. Conclusions

    7. Environmental Energy Technologies Division • Energy Analysis Department The Problem for Solar Electricity Under Traditional RPS Policies Traditional RPS, whereby all eligible resources compete, can be effective in supporting least-cost projects But is not likely to provide adequate support for emerging technologies, and smaller projects: Cost and solicitation barriers 13 of 26 RPS policies provide no differential support for solar/distributed energy; experience shows that: These policies are unlikely to provide meaningful support to customer-sited or even utility-scale PV in the near term With the exception of the Southwest, these policies are unlikely to greatly benefit solar thermal electricity

    8. Environmental Energy Technologies Division • Energy Analysis Department California: An Exception to the Rule

    9. Environmental Energy Technologies Division • Energy Analysis Department Presentation Overview 1. Overview of State RPS Policies 2. The “Problem” for Solar Electricity 3. Supporting Solar within State RPS Policies 4. Conclusions

    10. Environmental Energy Technologies Division • Energy Analysis Department For Solar to Succeed Within an RPS, the Following Factors Must Be Considered Eligibility Are all forms of solar electricity eligible? Are customer-sited generators eligible? Are metering/tracking systems in place? REC Ownership Do owners of solar systems “own” their RECs? Do mechanisms exist to trade small quantities of RECs? Differential Support for Solar Does the RPS contain a solar share or credit-multipliers? How are these mechanisms implemented?

    11. Environmental Energy Technologies Division • Energy Analysis Department States that Provide Differential Support for Solar within an RPS Do So in Two Ways Solar Share/Set-Aside A requirement that some portion of the RPS come from solar specifically, or DG more broadly Solar Multiplier Provides solar electricity more credit than other forms of generation towards meeting the RPS Recent move towards set-asides (away from multipliers) due to greater success with these instruments

    12. Environmental Energy Technologies Division • Energy Analysis Department Solar Incentives: Set-Asides in 11 States (and D.C.), Credit Multiplier in 1 Additional State

    13. Environmental Energy Technologies Division • Energy Analysis Department State RPS Set-Asides Can Be and Are Designed in Multiple Ways Percentage targets and timeframes Solar-specific or broader DG eligibility Solar technology eligibility Photovoltaics Photovoltaics and solar thermal electric Inclusion of solar heating and cooling In-state vs. out-of-state eligibility Requirements for customer-sited capacity Use of multipliers in addition to set-asides Cost caps, alternative compliance payments, etc. Oversight on contracting and incentives

    14. Environmental Energy Technologies Division • Energy Analysis Department Select Design Elements of State Solar and DG Set-Asides

    15. Environmental Energy Technologies Division • Energy Analysis Department Development of State RPS Set-Asides: Experience Remains Limited

    16. Environmental Energy Technologies Division • Energy Analysis Department Impact of State RPS Set-Asides on PV Has Already Been Substantial

    17. Environmental Energy Technologies Division • Energy Analysis Department State RPS Set-Asides Have Kick-Started Solar Thermal Electric Development Arizona: 1 MW Saguaro Solar Station came online in 2006; nation's first parabolic trough power plant built since 1990 Nevada: 64 MW Nevada Solar 1 was commissioned in 2007 to help meet the Nevada RPS

    18. Environmental Energy Technologies Division • Energy Analysis Department Status of Utility-Scale Solar-Thermal Electric Facilities Proposed in the U.S.

    19. Environmental Energy Technologies Division • Energy Analysis Department The Future Impact of Existing State RPS Set-Asides on Solar Could Be Sizable

    20. Environmental Energy Technologies Division • Energy Analysis Department Largest RPS Markets for Solar in Near-Term Include NJ, AZ, NM, NV, NC, CO

    21. Environmental Energy Technologies Division • Energy Analysis Department Most Aggressive States, in Required Solar as a % of Sales, Include NM, AZ, NJ, MD

    22. Environmental Energy Technologies Division • Energy Analysis Department Without Careful Design of Set-Asides, this Solar Growth May Not Occur Major design considerations that impact the effectiveness and cost of solar under a set-aside include…

    23. Environmental Energy Technologies Division • Energy Analysis Department Contracting and Incentive Policies Are Critical to the Success of a Set-Aside Long-term REC contracting Implicit Encouragement: NJ (8 year ACP schedule; investigate securitization) Strict Requirements: MD (>15 yrs), NC (as long as needed by generator), CO (>20 yrs), NV (>10 yrs) Up-front payments for smaller PV systems CO, NV, AZ, NJ, NY, MD

    24. Environmental Energy Technologies Division • Energy Analysis Department Presentation Overview 1. Overview of State RPS Policies 2. The “Problem” for Solar Electricity Supporting Solar within State RPS Policies 4. Conclusions

    25. Environmental Energy Technologies Division • Energy Analysis Department Conclusions Traditional RPS designs will do little to support customer-sited PV in the near term State RPS policies that include solar or DG set-asides are becoming more popular, and are increasingly driving solar development RPS policies that only have credit multipliers for solar have not yet seen significant solar additions Importance of RPS for the solar industry suggests need for greater focus on design details