30 likes | 174 Views
BES III Software: Short-term Plan (2005.6 - 2005.10). Weidong Li 14 th June 2005. To-do List (1). Analysis software development Particle identification Vertex finding Calibration algorithms and detector alignment services Trigger simulation Event filter software and testbed
E N D
BES III Software:Short-term Plan (2005.6 - 2005.10) Weidong Li 14th June 2005
To-do List (1) • Analysis software development • Particle identification • Vertex finding • Calibration algorithms and detector alignment services • Trigger simulation • Event filter software and testbed • Geometry services migrate to new detector description • More realistic detector simulation • Backgrounds • Digitization • Raw data production Weidong LI
To-do List (2) • Event display • Root event input • MDC TOF EMC MUC hits • Reconstructed tracks or clusters • Reconstruction algorithms • Move to latest release 4.2 • performance tuning • Performance studies • Efficiency and resolution • Algorithms’ benchmarking and profiling • Any memory leakage • Another design iteration for EDM • Documents Weidong LI