CATS EHV Update . January 13, 2009. CATS EHV Status Update. CATS EHV met on 1/6/09 New Chairman 2009 study work has been revised Mega-project analysis delayed until 2010 Biennial Transmission Assessment (BTA) work will be performed in 2009. 2009 Mega-Project Study Update.
E N D
CATS EHV Update January 13, 2009
CATS EHV Status Update • CATS EHV met on 1/6/09 • New Chairman • 2009 study work has been revised • Mega-project analysis delayed until 2010 • Biennial Transmission Assessment (BTA) work will be performed in 2009
2009 Mega-Project Study Update • Determine impact of large generation injections at Arizona 500 kV busses • Determine transmission to support injections of 1000-3000MW • Mega-Project study coincides with • Statutory requirements of BTA • ACC-required Arizona Renewables report • NERC compliance study work • Total Transfer Capability (TTC) study work • Mega-Project Study delayed. Review study plan late 2009 to prepare for 2010 work
2009 BTA Study • CATS EHV will perform the following analyses • Ten Year Snapshot Study • N-1-1 Study • Extreme Contingency Study • RMR Studies for the Phoenix Metro area
Contact Information LeeAnn Torkelson Salt River Project 602.236.0973 leeann.torkelson@srpnet.com