1 / 88

S ubstitutable MPR Reconciliation

S ubstitutable MPR Reconciliation. Three Different Types of Reporting on Substitutable MPR:. Three Different Types of Reporting on Substitutable MPR:. Any commodity subject to 100% Yield requirement. Three Different Types of Reporting on Substitutable MPR:.

sanura
Download Presentation

S ubstitutable MPR Reconciliation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Substitutable MPRReconciliation

  2. Three Different Types of Reporting on Substitutable MPR:

  3. Three Different Types of Reporting on Substitutable MPR: Any commodity subject to 100% Yield requirement

  4. Three Different Types of Reporting on Substitutable MPR: Any commodity subject to 100% Yield requirement Standard Yield fruits and vegetables

  5. Three Different Types of Reporting on Substitutable MPR Any commodity subject to 100% Yield requirement Standard Yield fruits and vegetables Substitutable commodity, but processor elects not to substitute

  6. We will begin reconciling an MPR for substitutable commodities that are subject to the 100% yield requirement

  7. Documents needed to reconcile an August MPR:

  8. Documents needed to reconcile an August MPR: • July MPR

  9. Documents needed to reconcile an August MPR: • July MPR • August MPR and attachments

  10. Documents needed to reconcile an August MPR: • July MPR • August MPR and attachments • Most Recently approved SEPDS A

  11. Documents needed to reconcile an August MPR: • July MPR • August MPR and attachments • Most Recently approved SEPDS A • Any Shipment Notification Emails or Reports

  12. Compare previous month’s ending inventory with current month’s beginning inventory

  13. Differences in the ending inventory from the prior month and the beginning inventory in the next month must be explained by processor!

  14. Check Shipments Check notification email

  15. Check Shipments Check notification email

  16. STD Weight: 40,320 LBS Processor has overage = 1,095 LBS

  17. Do the math! Are all numbers added and subtracted correctly?

  18. Do the math! Are all numbers added and subtracted correctly?

  19. Do the math! Are all numbers added and subtracted correctly?

  20. Do the math! Are all numbers added and subtracted correctly?

  21. Do the math! Are all numbers added and subtracted correctly?

  22. Check Sales

  23. Verify State Approval

  24. Processor cannot reduce inventory for end products that have not been approved by State agency

  25. Reconcile by item code first, then by commodity

  26. Do the math! 505 cases sold

  27. Do the math! 505 cases sold x 6.25 lbs of cheese = 3,156.25 lbs draw down

  28. Do the math! 505 cases sold x 6.59 lbs of flour = 3,327.95 lbs draw down

  29. Do the math! 505 cases sold x 0.93 lbs of tomato paste = 469.65 lbs draw down

More Related