Next generation of Trigger/DAQ

Next generation of Trigger/DAQ. Patrick Le Dû -. Where are we today? Evolution 2005-2010 On/off line boundaries What next ? 2010-2020 LC’s Triggers Technologies What about standards? Technology transfer to others fields. General comments about Trigger/DAQ.

sarah
Download Presentation

Next generation of Trigger/DAQ

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Next generation of Trigger/DAQ Patrick Le Dû - • Where are we today? • Evolution 2005-2010 • On/off line boundaries • What next ? 2010-2020 • LC’s Triggers • Technologies • What about standards? • Technology transfer to others fields Snowmass2001 - P. Le Dû

  2. General comments about Trigger/DAQ • From the Physics: NO loss • From the Detector : Deadtimeless • From the Machine : use 100% • from T/DAQ people: maximum efficiency and minimum maintenance Can we achieve the ultimate T/DAQ system ? Snowmass2001 - P. Le Dû

  3. Production rate Tevatron selection scheme QCD 7MHz Coarse , dedicated data 6 Hardwired processors ( FPGA) Level 1 10 10-50 KHz RISC Processors and DSPs optimized code 4 Level 2 10 1 KHz Level 3 2 Standard PC’s Farm 10 50Hz “Off-line” code 0 10 W,Z Recorded Events - 2 10 Top 396/132ns > Sec Higgs? 4 µsec 20-100 msec - 8 - 6 - 4 - 2 0 2 10 10 10 10 10 10 Available time (sec) Snowmass2001 - P. Le Dû

  4. 7.6 MHz Xing rate D0 Detector L1 Buffer Pipeline) L1 Trigger 4.2 µs Accept 10 KHz L2 Buffer & digitization Preprocessing Farm L2 L2 Global 100 µs latency Acce/rej < 1KHz 48 Input nodes 50 ms latency L3 Farm <50 Hz Mass Storage Snowmass2001 - P. Le Dû

  5. LHC Multilevels Selection scheme Production rate # / sec 8 10 QCD Hardwired processors (ASIC , FPGA) 6 10 Level 1 HLT 4 Level 2 10 Standard processor farms & Networks Level 3 2 10 W,Z 0 Top 10 Recorded Events Z’ - 2 10 Higgs > Sec 25ns few µsec ~ms - 8 - 6 - 4 - 2 0 2 10 10 10 10 10 10 Available time (sec) Snowmass2001 - P. Le Dû

  6. Evolution  2005-2010 • LHC (ATLAS & CMS)  Two levels trigger • L1 = physics objects ( e/g,jet,m ..) using dedicated data • L2 + L3 = High Levels « software » Triggers using « digitized data » • Complex algorithms like displaced vertices are moving downstream • CDF/DO : L2 vertex trigger • LHCb/Btev : L0/L1 b trigger • Use as much as possible comodity products (HLT) • No more « Physic » busses  VME,PCI .. • Off the shelf technology • Processor farms • Networks switches (ATM, GbE ) • Commonly OS and high level languages Snowmass2001 - P. Le Dû

  7. L1 collision rate MHz “Logical Strategy” for event selection Logical steps • Local identification of • Energy cluster • Track segment • Missing energy Prompt Trigger “Identification of objects” Coarse dedicated data Few µsec > KHz Objects High Level Trigger Selection “L 1 objects “ confirm Particle signature Global Topology Trigger Menu • Refine Et and Pt cut • Detector matching • Mass calculation • VTX & Impact parameters ... Final Digitized data optimised code L2 Classification of Physics/calibration Process Few msec > Hz Event Filter On-line processing • Full or partial reconstruction • Calibration & monitoring • “Hot stream” physics • “Gold platted ”events • Final formatting etc ... Partial to full event “Off-line” code type L3 Data streams Few sec “off-line” Storage& analysis S1 S2 S3 S4 Sn Snowmass2001 - P. Le Dû

  8. On-off line boundaries become flexible • Detectors are becoming more stable and less faulty • On-line processing power is increasing and use similar hw/sw components (PC farms..) • On-line calibration and correction of data possible • More complex analysis is moving on-line • Filter event • Sort data streams… Snowmass2001 - P. Le Dû

  9. Trigger strategy & Event Analysis Menu • Simple signatures : • e/g , µ, taus ,Jet • Refine Et and Pt cut • Detector matching Simple signatures 5-10KHz HLT Algorithms Select « Physics tools » Complex signatures • Complex signatures : • Missing Et, scalar Et • Invariant and transverse mass • separation … • vertices, primary and displaced Others signatures 1-2 KHz HLT Reject ms Topology Select objects and compare to Menus • Selection: • Thresholding • Prescaling • “Intelligent formatting “ Event Candidate & classification 100Hz Fast Analysis Stream Partial/Full Event Building Physics streams • Monitoring • Calibration • Alignements • Physics monitoring • “Gold Platted“ events • Physics samples On-Line Processing Sec. Sec. Temporary storage Sn S1 S2 Calibration Constant Sub-Detector performance Event Background Infos to the LHC Database “Analysis” farm hours days hours days Sample Prescale Compress Candidates Storage “Garbage” Final storage Snowmass2001 - P. Le Dû

  10. Summary of T/DAQ architecture evolution L1 L1 hardware • Today • Tree structure and partitions • Processing farms at very highest levels • Trigger and DAQ dataflow are merging • Near future • Data and control networks centered • Processing farm already at L2 • More complex are moving on line • Boundaries between on-line and off-line are flexible • Comodity components more towards L1 L2 HLT L3 On-line Analysis farm Off-line Pass1 Pass2 Pass2 Snowmass2001 - P. Le Dû

  11. What next ? 2010-2020 • Next generation of machines • LC (Tesla,NLC,JLC) • Concept of « software trigger » • VLHC : like LHC • CLIC : < ns sec collision time! • Mu collider : Not invetigated yet! • Next generation of detectors : • Pixels trackers : ex 800 M Ch (Tesla) • Si-W calorimeters: 32 M Ch. (Tesla) • Very high luminosity > 10**34 • High or continuous collision rate (< ns) • multimillion Si read-out channels Challenges Snowmass2001 - P. Le Dû

  12. LC beam structure TESLA JLC (NLC) 5 Hz 150 Hz 2820 bunches 85 bunches / // / / // / 199 ms 6.6 ms • Relatively long time between bunch trains 199 ms • Rather long time between bunches: 337 ns • Rather long bunch trains ( same order as detector rerad-out time: 1ms 1ms 238 ns • Relatively long time between bunch trains (same order as read-out time): 6.6 ms • Very short time between bunches: 2.8 ns • Rather short pulses : 238 ns Snowmass2001 - P. Le Dû

  13. LC basic trigger concept : NO hardware trigger • Read-out and store front end digitized data of a complete bunch train into buffers • Deadtime free -- no data loss • DAQ triggered by every train crossing • build the event and perform zero suppression and/or data compression • full event data information of complete bunch train available • Software selection between train : software trigger • using « off-line » algorithms • Classify events according • physics, calibration and machine needs • Store events : • partial or everything! Snowmass2001 - P. Le Dû

  14. Advantages • Flexible • fully programmable • unforeseen backgrounds and physics rates easily accomodated • Machine people can adjust the beam using background events • Easy maintenance and cost effective • Commodity products : Off the shelf technology (memory,switches, procsessors) • Commonly OS and high level languages • on-line computing ressources usable for « off-line » • Scalable : • modular system Snowmass2001 - P. Le Dû

  15. Consequences on detector concept • Constraints on detector read-out technology • TESLA: Read 1ms continuously • VTX: digitizing during pulse to keep VTX occupancy small • TPC : no active gating • JLC/NLC : • 7 ms pulse separation • detector read out in 5 ms • veto trains • 3 ns bunch separation • off line bunch tagging • Efficient/cheap read-out of million of front end channels should be developped • silicon detectors ( VTX and SiWcalorimeters) Snowmass2001 - P. Le Dû

  16. Conclusion about LC triggers • Software trigger concept remains the ‘ baseline ’ • T/DAQ for the LC is NOT an issue ! • Looks like the ‘ ultimate trigger ’ • satisfy everybody : no loss and fully programmable • Feasible - (almost) today and affordable • Less demanding than LHC • Consequence on the detector design • constraint on detectors read-out electronics (trackers) • Consequence on the sofware environment: • on and off-line are merging : need to develop a complete integrated computing model with common ressources from calibration, selection (algorithms and filter) and analysis /processing paths…. Snowmass2001 - P. Le Dû

  17. Technology forecast (2005-2015)Fast logic & hardware triggering (L1) • Move to digital & programmable • ASICS not anymore developped • FPGA’s is growing and can embed complex algorithms Snowmass2001 - P. Le Dû

  18. Technology forecast (2005-2015)(Software trigger) Systematic use of : Off the Shelves comodity products • Processors and memories • Continuous increasing of the computing power • More’s law still true until 2010!  x 64 • Then double every 3years  • Memory size quasi illimited ! • Today: 64 Mbytes • 2004 : 256 MB • 2010 : > 1 GB • Networks:Commercial telecom/computer standards • Multi (10-100) GBEthernet • But : Software overhead will limit the performance… x 256 by 2016 Snowmass2001 - P. Le Dû

  19. About standards • Evolution of standards : no more HEP! • HEP : NIM (60s) CAMAC (70s), FASTBUS (80s), • Commercial OTS : VME (90s), PCI (2000)  CPCI? • Looking ahead: today commercial technologies • No wide parallel data buses in crates • Backplanes used for power distribution,serial I/O, special functions • High speeGb/s fiber & copper serial data links • Wireless data link emerging • Higher densities for micros,memories standards commercial part • Hundred of pin packages Snowmass2001 - P. Le Dû

  20. Transfer to other fields • Last year IEEE NSS-MIC Conference shows a great interest and a common interest • Medical Imaging as similar requirement as us for diagnostic TEP • Large data movment and on-line treatment • Fast selection and reconstruction Snowmass2001 - P. Le Dû

  21. Final Conclusions • Trigger/should not be an issue for the next generation of machines like LCs • Fully commercial OTS comodity components • Programmable & software triggers • On-line and Off-line boundaries become very flexible: need a new « computing model » • Challenges for 2020 • Very high luminosity > 10**34 • High or continuous collision rate (< ns) Snowmass2001 - P. Le Dû