An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ggonzale: ggonzale: Herschel HIFI Instrument Qualification ReviewReview ObjectivesandOrganisation G.Crone/G.Pilbratt Herschel/Planck Project HIFI IQR - SCI-PT/33376

  2. Instruments Review Cycles in Perspective Spacecraft ITT SRR PDR CDR … Phase B Phase C/D Launch Instruments: ISVR IIDR IBDR IHDR IQR … IFAR 1999 2000 2001 2002 2003 2004 2005 2006 2007 HIFI IQR - SCI-PT/33376

  3. From Qualification to Flight Acceptance • CQM at module (EQM) level : Delivery (DRB)  Test readiness (TRR)  Test review (PTR) 2005 After CQM System Campaign hold a Instrument Status Review • FM at instrument level: ILT TRR  ILTs  ILT Test review prior to warm-up (PTR) 2005 To decide on need for further tests or to terminate & deliver • FM at module (PLM) and system level: Delivery (DRB)  Test readiness (TRR)  Test review (PTR) 2006 In preparation of FAR Instrument Status Review HIFI IQR - SCI-PT/33376

  4. Herschel Status • Herschel Payload Module CDR completed in July and Space Segment CDR completed in October with official close-out end 2004 • All Herschel Instruments: HIFI, PACS and SPIRE have successfully completed CQM Instrument Level Tests. • All FPU’s delivered and integrated on EQM cryostat at OTN. • Instrument testing to commence April 2005 • Instrument FM program underway – Baseline delivery Nov 2005 HIFI IQR - SCI-PT/33376

  5. Herschel EQM HIFI IQR - SCI-PT/33376

  6. Herschel PFM status • All units passed CDR, manufacturing well underway • Optical bench delivered • HTT delivered, most cryo-components, instrumentation, MLI integrated • HOT delivered instrumentation, cryo-components and MLI mounted. Tank integrated on framework. Both fully integrated • Cylinder thermal shields delivered-Others completed • CVV cylinder delivered-Upper and lower bulk head imminent. • Integration to be completed by May 2005; first cool-down with MTD instrument prior to shipment to ESTEC for STM campaign HIFI IQR - SCI-PT/33376

  7. Instrument Qualification Review - Objectives Ref: IQR Proceedings - v2 Aug 26, 2004 - SCI-PT/27108 • Confirmation of instrument CQM hardware/software qualification • Completion of instrument design verification • Assessment of performance and compliance with sci. reqs • Identification and confirmation of improvements for FM • Completion of OBSW design and demonstration of functionality • Confirmation of EGSE design and demonstration of functionality • Confirmation of instrument operability - User Manual HIFI IQR - SCI-PT/33376

  8. IQR - Proceedings Data Package – complete delivery at K.O. [HIFI] • Documents as identified in SCI-PT/27108 • Presentations as given during the K.O. meeting Review of Data Package [Board] • Discrepancies and open issues raised as RIDs • RIDs issued up to one week before co-location Answersto RIDs [HIFI] • Provided, discussed and resolved at co-location Board Report = Result of the three items above [Board] HIFI IQR - SCI-PT/33376

  9. IQR Timeline K.O. Meeting and Data Pack today Board Meeting / Telecon 31 Jan 2005; 1400; room: Aa107 8 Feb 2005; 1400; room: Aa107 15 Feb 2005; 1400; room: Aa107 Issue of RIDs 16 Feb 2005 Co-location 23-24 Feb 2005 at SRON-G Issue of Board Report 18 Mar 2005 HIFI IQR - SCI-PT/33376

  10. Review Board Composition Gerald Crone (Chairman), ESA Goeran Pilbratt (Co-Chair), ESA Carsten Scharmberg (Secretary), ESA Norbert Nikolaizig, ESA Jan Rautakoski, ESA Thijs van der Laan, ESA Graham Coe, ESA Anthony Marston, ESA Bernard Collaudin, ASP Micha Schmidt, ESOC + Observers from ESA, industry, funding agencies HIFI IQR - SCI-PT/33376

  11. HIFI IQR K.O. – Agenda / Morning HIFI IQR - SCI-PT/33376

  12. HIFI IQR K.O. – Agenda / Afternoon HIFI IQR - SCI-PT/33376

  13. First Impressions 1 • Qualification status of the complete instrument-missing elements, ICU, LSU… • Limited CQM. FM 1A and B built and in spec. Band 2a and b ready for cold test and cover band. 3a and 3 b QM 30ghz hole.High roll off. Updated design: Simulation results show that good recovery. Warm tests planned soon. • 4a and 4b 1 simulation OK. • JPL 5a and 5b delivered but not accepted. Band 6 beginning of May. Extra Spare wafer run for Band 6-Risk. • Proof of pudding in the eating at instrument level • Replacing diplexers for beam splitters, higher power for 6,5,3. HIFI IQR - SCI-PT/33376

  14. First Impression 2 • Mixer performances. MU-1 QM achieved sensitivity. MU-2 FM good performance Noise temp v I/F excellent. Band 3 and Band 4 top 0.5Ghz unusable. Coupling between substrate and horn block, EMC gasket. Maybe cannot be fixed, modifications being tried . • MU-5 no FM performance yet. • All delivery of FM mixers by end April.Any further iterations on FS to keep delivery. • Improvement in CTH mixers-baseline now. • IF-1 OK, IF-2 QM’s OK. Low better. • Noise and gain budget OK. Frequency resolution all bands compliant. • Power stability, spectrometers OK. ILT QM on short scales compliant. Spectroscopy Allen variance needs to be assessed no numbers yet calculated. • HRS linearity marginally compliant and WBS worse and non-compliant. Software correction can be applied. HIFI IQR - SCI-PT/33376

  15. First Impression 3 • ILT QM missing tests:Beam pattern, frequency response test, no LSU, Gas cell no time. • Standing wave test LO-FPU performed. Stability times. Standing wave at telescope level. • ILT’s Full analysis not yet fully available. • ICU/OBS problematic in ILT, ICU unstable.Existing functionality not yet tested and functionality not yet implemented. • ICU not used for LO command/manual command worked OK. ICU cannot be used to control LO until ICU SW/HW fixed. • Mixer magnet short detected • Changes QM to FM. Change diplexers to beam splitter 3,5,6. HIFI IQR - SCI-PT/33376

  16. First Impression 4 • Budgets IID-B 3.2 is valid one- Few CR’s in Place • Mass within spec/ with new allocation. • OBSW-No presentation and chain effect on instrument operation. • Make list of items that are not at qualification status. • PA Parts stress/Worse Case Analysis • FPGA NCR’s/NRB on HRS • FPGA New procurement spec sent out to all HIFI sub-systems. 10 nanosecond rise/fall time introduced in issue B. • HSIA not yet included in the data package. • FDIR/FMECA- Dedicated error detection mechanism implemented. No HIFI error requires CDMU support. • User manual needs some update/when will it be updated ? HIFI IQR - SCI-PT/33376

  17. First Impression 5 • VCD updated since DRB, now issue 2. • Good approach to verification. • FCU/LSU are PFM level units • FCU software in data package. • List of items qualified or not- Qualification status. LSU PFM+DM, B/B shown good result. FU has DM 2. • ICU still unknown to HIFI • LOU/LCU qualification to be completed • FPU QM but IF2, choppers and diplexers need deltas. Cryo-vibration. IF2 vibration completed by end of Feb. • Internal QR already started 17th January 2005. • Minutes updated with document numbers eventually, first issue to be immediately included. HIFI IQR - SCI-PT/33376

  18. First Impression 6 • Major NCR’s HIFI bit flip. FPGA breakdown, HRS temperature NCR?. Wrap up-on FPGA issue February. • Materials and Processes in good situation. • Parts Approval backlog, however new personnel. • Documentation/Data package organized as IQR procedure. • IHDR RIDS and status. Scientific performance documentation . Nick will put this into a document. • IHDR LO qualification approach end February KW. • HSIA 2nd April 2005. • Co-location 8th, 9th March. HIFI IQR - SCI-PT/33376

  19. First Impression 7 • ICU moving on critical path, LSU delivery dates 1st April to SRON. 1st November FM. • 90 days HIFI Testing FPU (47 w/o LO). Delivery 1st April 2006 to ESTEC. • Detailed schedule of MPI needs to be studied/Overall planning needs to be reviewed again. HIFI IQR - SCI-PT/33376