An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Wind turbine participation onControl Reserve Markets • EWEA Conference • Vienna, 6thFebruary 2013 • Malte Jansen (M.Eng.) • Fraunhofer IWES, Kassel • malte.jansen@iwes.fraunhofer.de

  2. Regulator TSO Player Manufacturer Supplier Research Institutions European countries

  3. Project: „Regelenergie durch Windkraftanlagen“ 0.9 Actual Feed-In Project Partners: • Fraunhofer IWES (Project Leader) • ENERCON GmbH (WT Manufacturer) • Energiequelle GmbH (WF Operator) • Amprion GmbH (TSO) • TenneT GmbH (TSO) Project Period: • 05/2012 – 04/2014 Aims: • ProofProcedure • Placement ofoffers • Unit control 0.8 Forecast: 95% Forecast: 99% 0.7 Forecast: 99.9% Forecast: 99.99% 0.6 Forecast: 99.999% 0.5 Power (normalized) 0.4 0.3 0.2 0.1 0 09-Nov 16:45 11-Nov 15:15 13-Nov 13:45 15-Nov 12:15 17-Nov 10:45 19-Nov 09:15 Time

  4. OfferingControl Reserve

  5. Offer (I) - Security level Reliability of 100% required Not possible for wind farms Reliability level of 99.994% used in the project (TSO recommendation) Use of probabilistic wind power forecasts Probability Power

  6. Offer(II)- German poolofwind farmsat 99.994% reliability

  7. Offer (III) - Pooling ofwind farmswithconventionalgeneration • Use of probabilistic forecast • Probabilistic forecast error is convoluted • Wind farms • Conventional generation • Offer = Power at a security level of 99.994% Pool offering control reserve @ 99.994%

  8. Offer (IV) - Effectsof Pooling Pool Wind Farms Pool Gasturbines 700 Sum of both Pools Joint offering (convoluted) 600 500 Maximum Offer [MW] 400 300 200 100 0 0 20 40 60 80 100 120 140 160 180 200 Time [1/4 hours]

  9. ProofMechanism

  10. Proof Method (I) – Balance control mechanism Available active power • Currently applied • TWENTIES Project Demo#1 (Spain) • Regulation in Great Britain and Denmark Forecast Forecast Power output [MW] • Prob. Forecast @ x% • Prob. Forecast @ x% • delivery of negative control reserve Feed-In Feed-In 0 15 30 Time [min]

  11. Proof Method (II) – Available active power mechanism Available active power Forecast • delivery of negative control reserve Forecast Power output [MW] • Prob. Forecast @ x% • Prob. Forecast @ x% Feed-In • Field test in the project „RegelenergiedurchWindkraftanlagen“ • Regulation in the Irish and Danish Grid Code • Considered as proof method in Great Britain 0 15 30 Time [min]

  12. Why available active power? Balancing effects between balancing groups Shortterm forecast error of wind farms is balanced by control reserve Planned power production = available active power Not opinion of all project partners!

  13. EnergyLosseswiththebalancecontrolmechanism – German poolof wind farms Lost energy with offers under schedule proof mechanism (German Pool) 1200 1000 800 24 Hours 600 4 Hours Lost energy per hour offered [MWh\h_offered] 1 Hour 400 200 95% 99% 99.8% 99.9% 99.99% 99.994% 99.999% 0 Security level

  14. Capacitypriceswiththebalancecontrolmechanism– German poolof wind farms Capacity Prices under the schedule proof mechanism (German Pool) 80 70 60 50 24 Hours • Capacity Prices [€/MW/h] 4 Hours Capacity costs of control reserve under the available active power mechanism is 0 €/MW/h 1 Hour 40 30 20 10 0 95% 99% 99.8% 99.9% 99.99% 99.994% 99.999% Security level

  15. Comparison of costsavingpotentialsat the tertiary control reserve market • 1h Product length x 106 16 • Cost-saving potential: • Availableactive power • Increasedcostefficiencycomparedtobalancecontrol • Costreduction • +212% @ 95% • +404% @ 99.999% • Higher marketshareof wind farms Available active power Balance control 14 12 10 Cost Reduction [€] 8 6 4 2 0 95% 99% 99.8% 99.9% 99.99% 99.994% 99.999% Security Level

  16. Potentials

  17. Potentials (I) – Potentials under different parameters • Variation ofinputparameters • Security level • Block length • Biddingstrategy • Trade-off • System security • Economicefficiency Power (normalized) 0.3 0.25 0.2 00:00 04:00 08:00 12:00 16:00 20:00 0.15 Time 0.1 0.05 Actualfeed-in Secure day-aheadforecast Secure intradayforecast Offercontrolreserve

  18. Potentials (II) – German pool of wind farms, Day-Ahead Tendering (1st July 2010 – 31st Dec 2010) x 106 14 95% 99% 12 99,8% 99,9% 10 99,99% 99,994% 99,999% 8 Potential [MWh] 6 4 2 0 1h 4h 24h Product length

  19. Potentials (III) – Ecomonicimpact on thetertiarycontrolmarketofthe German wind farmpool (1st July – 31st Dec 2010) Resultsforteriarysecondaryreservebids / availableactive power proofmethod x 106 16 • 24 hour product length • 4 hour product length 12 • 1 hour product length Maximum – No additional income for wind farms Cost Reduction [€] 8 4 • Minimum – Maximum additional income for wind farms 0 95 % 99 % 99.8 % 99.9 % 99.99 % 99.994 % 99.999 % Security Level

  20. Outlook

  21. Field test Secondary control Tertiary control 1 Positivecontrol reserve 0.5 Energyfrom Unit [MW / Mwoffered] 0 • 45 • 40 • 15 • 10 • 5 • 50 • 20 • 25 • 60 • 35 • 30 • 55 -0.5 Negative control reserve -1 Pro-tocol Real Signal Protocol Real Signal

  22. Conclusions • Wind Farm participation in control reserve markets … • is economically feasible • can substitute fossil fuel fired power plants • will increase competition in the market • can generate additional revenue for the wind farm operators • Balance control proof mechanism is unfavourable • In economic terms • In terms of curtailed energy Balance control proof mechanism is favourable • In terms of control reserve demand for the TSO

  23. Malte Jansen malte.jansen@iwes.fraunhofer.de ThankyouforYourAttention!Visitusat Booth b-B77