A hybrid-expert-system based tool for scheduling and decision support

A hybrid-expert-system based tool for scheduling and decision support. F.Franek, McMaster University+Terren Corp., Canada V.L.Rosicky, Terren Corp., Canada I.Bruha, McMaster University.

saskia
Download Presentation

A hybrid-expert-system based tool for scheduling and decision support

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A hybrid-expert-system based tool for scheduling and decision support F.Franek, McMaster University+Terren Corp., Canada V.L.Rosicky, Terren Corp., Canada I.Bruha, McMaster University Presenting TESS (Terren Expert System Shell), tightly coupled with the relational database back-end, used for scheduling of booking actions and decision support of marketing activities in GREENWICHTM software system for tour operators. Slide 1

  2. Need: most of tour operators in North America operate in similar manner and very slim profit margin. Hence need for some “standard” software for tour operators. Problem: despite similarities, certain differences in the sequence of booking actions across the whole business. Not only different actions are taken, but there timing and sequencing may be different. Solution: kind of “standard” software that may be easily tailored to the individual needs of each operator and that can produce action plans based on the booking data accordingly. Abstract problem: easy reconfiguration based on some rules, action scheduling (planning) based on some rules. Implementation: Rule-based expert system TESS! Slide 2

  3. Why TESS: Very flexible, very expressive r1: (0.3*P(x,”abc”) [>=.3] & ~Q(x,y)) | R(2,3.4,y) ==and:f1,or:f2=> 0.7*~S(y,x) [>.6] Why not TESS: Too flexible, too expressive, no “native” database access. Could not let users (of all people!!) to do it on their own, needed to provide natural and integral access to database. Solution: Design a language that limits the expressiveness and flexibility, but allows “natural” expressions concerning database access!! SQL!!! Slide 3

  4. SELECT DepositWarning FROM Tess WHERE AND booking_number=@bkg_number AND agency_office=@ao_id AND trip_id=@ts_id AND trip_departure_date=@departute_date AND BookingCompleted AND ConfirmationLetterSent AND (SELECT deposit FROM booking WHERE booking_number=@bkg_number) = 0 AND (SELECT deposit_date FROM booking WHERE booking_number=@bkg_number) >= @today Slide 4

  5. Data Data compiled TESS rule base TESS native rules TESS1 TESS2 temporary TESS Rules temporary Relational Database ACTIVITY ENGINE TESS INFERENCE ENG. Data Data Actions + Activities Schedule (Plan) of Actions+Activities Slide 5

  6. Additional Advantage SQL QUERY BUILDER TESS Rules Rule Editor Relational Database How is the scheduling done? Day-to-day simulation of actions to produce the plan of actions. The reason: the combinatorics of mutual interactions is not conducive to analytical solution. Despite of this, the natural constraints limit the combinatorial explosion to tractable level. Slide 6

  7. CONCLUSION For booking actions two-valued (1,0) logic suffices. Not so for marketing activities, fuzzy-logic or other uncertainty-handling approach necessary. TESS natural for fuzzy-logic implemented through Certainty Value Propagation Functions and and or. In the setting of marketing activities we ran into the usual problem - where do the numbers come from? - so we are experimenting with neural nets in the place of CVPF’s and their training. Slide 7