RPCs for CMS – Phase I Status report L. M. Pant BARC-NPD

RPCs for CMS – Phase I Status report L. M. Pant BARC-NPD. L.M.Pant India-CMS Meet, PU, Chandigarh 05 th April, 2007. Indents Status (12 sets) : Three RE*/3 & Nine RE*/2).

Download Presentation

RPCs for CMS – Phase I Status report L. M. Pant BARC-NPD

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RPCs for CMS – Phase I Status report L. M. Pant BARC-NPD L.M.Pant India-CMS Meet, PU, Chandigarh 05th April, 2007

  2. Indents Status (12 sets) : Three RE*/3 & Nine RE*/2) L.M.Pant India-CMS Meet, PU, Chandigarh 05th April, 2007

  3. Signal cable preparation (Draka cable : ~ 3 mm OD) : RE*/2 & RE*/3 pre-assembly job # 1 460 mm; 740 mm A R Adaptor side Read out side L.M.Pant India-CMS Meet, PU, Chandigarh 05th April, 2007

  4. L1 insulator sheath L2 Copper braid core L3 Signal cable preparation (Draka cable : ~ 3 mm OD) : RE*/2 & RE*/3 pre-assembly job # 1 460 mm; 740 mm A R Adaptor side Read out side A R L1 L1 L2 L2 dimensions in mm dimensions in mm L3 L3 L.M.Pant India-CMS Meet, PU, Chandigarh 05th April, 2007

  5. Supreet from PU Abhinav from DU Signal cable preparation for RE*/2 pre-assembly job # 1 460 mm of signal cable being marked Signal cables being cut Top sleeve removed Cu braid being adjusted Cu braid being cut at 5 mm L.M.Pant India-CMS Meet, PU, Chandigarh 05th April, 2007

  6. Signal cable preparation for RE*/2 pre-assembly job # 1 Soldering on the core wire Read out -end Adaptor-end 460 mm of signal cable 96 signal cables (3 x 32) for one RPC ready L.M.Pant India-CMS Meet, PU, Chandigarh 05th April, 2007

  7. Teflon gas pipes : OD = 6 mm; Wall thickness = 1 mm pre-assembly job # 2 L.M.Pant India-CMS Meet, PU, Chandigarh 05th April, 2007

  8. B A C D Teflon gas pipes : OD = 6 mm; Wall thickness = 1 mm pre-assembly job # 2 L.M.Pant India-CMS Meet, PU, Chandigarh 05th April, 2007

  9. 1 8 12 mm 8 mm  C RE*/2 B 15.2 mm = X 15.2 mm x 8 = 121.6 mm = Y A Perspex spacers : 8 clear holes on 5 mm thick perspex pre-assembly job # 3 L.M.Pant India-CMS Meet, PU, Chandigarh 05th April, 2007

  10. Parallel sets of MFCs being attatched for large sized gaps for CMS-RPCs Gas Purifiers Gas cylinders inside the cabinet 4 channel gas mixing unit Iso- B U T A N E A R G O N Flow divider with safety bubblers R E 1 3 4 A S F 6 L.M.Pant India-CMS Meet, PU, Chandigarh 05th April, 2007

  11. Top view Bottom view Top and bottom overlapped Adaptor card design : Prashant Patale, NPD-BARC L.M.Pant India-CMS Meet, PU, Chandigarh 05th April, 2007

  12. FRC connector Top view Bottom view Adaptor samples for FEBs L.M.Pant India-CMS Meet, PU, Chandigarh 05th April, 2007

  13. Signal cables soldered to Adaptors ferrule FRC connector L.M.Pant India-CMS Meet, PU, Chandigarh 05th April, 2007

  14. 16 Signal cables soldered to Adaptors 72 + sets required for 12 chambers L.M.Pant India-CMS Meet, PU, Chandigarh 05th April, 2007

  15. Cosmic stand for CMS RPCs 2000 mm x 1600 mm L.M.Pant India-CMS Meet, PU, Chandigarh 05th April, 2007

  16. Vibration free assembly table for RPCs Full gap of RE*/3 L.M.Pant India-CMS Meet, PU, Chandigarh 05th April, 2007

  17. Safety bubbler with Si oil 18 cm 101.0 kPa Manometer with safety bubbler for leak tests L.M.Pant India-CMS Meet, PU, Chandigarh 05th April, 2007

  18. ? pin-drop silence Samples of following are urgently required in a second box to be shipped to India, immediately - 3rd Mar., 07 L.M.Pant India-CMS Meet, PU, Chandigarh 05th April, 2007

  19. Outlook 1 (March – April 2007) the pre-assembly jobs • Work schedule floated on 15 Feb. to collaborators • First job is to prepare about 1200 signal cables (960 +) • Procurement of materials from local market • (gas pipes, Cu tubes, Cu plates for cooling etc.) • Prepare the gas pipes according to the particular • shape requirements in the jigs • Fabrication of adaptor cards (100 cards by 15 April) • Leak and HV tests of the 9 gaps being sent from CMS L.M.Pant India-CMS Meet, PU, Chandigarh 05th April, 2007

  20. Outlook 2 (June – August 2007) the final assembly • The HCP, Cu Read outs, FEBs etc. expected by May 2007 • After the above equipments arrive – More hands are needed • Assembly of ten chambers : June 2007 • Someone from CMS (Cai) could be around in August/Sept. • (invitation should go in time) • Testing of ten chambers : August 2007 • Support for Cosmic tests from CMS (August 2007) • Scintillators, electronics etc. (to be DISCUSSED) • The ten chambers can be despatched by Sept., 2007 • AS SCHEDULED L.M.Pant India-CMS Meet, PU, Chandigarh 05th April, 2007

  21. Mechanical Design & Prototype Devp. Section, BARC All the collaborators HECR Group TIFR EHEP Group TIFR Nuclear Physics Division, BARC Acknowledgements L.M.Pant India-CMS Meet, PU, Chandigarh 05th April, 2007