EMCal – France. Status CERN-020707. Since the Scientific Council. 1. Christelle Roy - Subatech. EMCal design participation. Mechanics : Mechanical architecture of StripModules and SuperModules : completed SuperModules Crates : completed ( pict.) StrongBacks : in progress

scout
Download Presentation

Christelle Roy - Subatech

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EMCal – France Status CERN-020707 Since the Scientific Council 1 Christelle Roy - Subatech

  2. EMCal design participation Mechanics : • Mechanical architecture of StripModules and SuperModules : completed • SuperModules Crates : completed(pict.) • StrongBacks : in progress • Interfaces SuperModules – CalFrame (rails + crates) : completed • Insertion Tooling : completed • StripModules handling and tooling : completed • Electronics/mechanics interfaces : completed Electronics : • T-cards + IPCB + GTL bus : in progress Request from Electronics/Daq pool of Subatech

  3. SuperModule Crate As designed As machined

  4. EMCal realization participation Mechanics : • SuperModules – CalFrame interfaces (rails and crates) :completed • StrongBacks manufacturer consulting : in progress • Insertion tooling : order ready to be sent • Installation of the rails on the CalFrame : completed …last week • Load test • Writing of EMCal 3D-Model : completed + constant upgrade …coming soon… • Tests at CERN in October : 4/5 persons available • Module assembly (288) • StripModules assembly (24)

  5. Calframe : Preparation of load test Load test finished week 22, deflections conform to FEA calculations

  6. CalFrame Installation of cables trays in SXL2 (on the way)

  7. LPSC activities 1/ Supermodule assembly (see J.F. Muraz's talk)    - Hall removal    - Assembly tools 2/ EMCal Global trigger (see O. Bourrion's talk)   - STU design   - Test TRU/STU link 3/ Simulation for cosmics calibration (see C. Furget's talk)