1 / 1

600

300. Powerpoint sequence of the construction of a traditional strip foundation Excavate trench Lay concrete foundation and leave to set Lay foundation blocks Lay brickwork to outer leaf upto dpc Lay blockwork inner leaf to dpc Backfill trench Lay dpc to both leaves

Download Presentation

600

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 300 • Powerpoint sequence of the construction of a • traditional strip foundation • Excavate trench • Lay concrete foundation and leave to set • Lay foundation blocks • Lay brickwork to outer leaf upto dpc • Lay blockwork inner leaf to dpc • Backfill trench • Lay dpc to both leaves • Continue brick/block walls 900 (Note that the internal ground floor has been removed for ease of understanding. Also note that each brick is 65mm high BUT it has a 10mm mortar joint so each course is 75mm in total. The bricks and blocks are each 100mm wide with a 100mm wide cavity. The foundation blocks are 215mm high excl a 10mm mortar joint.) 225 150 600

More Related