IEEE DASC Co-Sponsorship of UPF Working Group

IEEE DASC Co-Sponsorship of UPF Working Group. Proposal prepared by: Stephen Bailey Chair, Accellera UPF Technical Subcommittee. Agenda. Request for DASC co-sponsorship of WG Background of UPF-TSC UPF from start to finish IEEE and Accellera relationship Working group IEEE Timeline.

Download Presentation

IEEE DASC Co-Sponsorship of UPF Working Group

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IEEE DASC Co-Sponsorshipof UPF Working Group Proposal prepared by: Stephen Bailey Chair, Accellera UPF Technical Subcommittee

  2. Agenda • Request for DASC co-sponsorship of WG • Background of UPF-TSC • UPF from start to finish • IEEE and Accellera relationship • Working group • IEEE Timeline

  3. Background for UPF-TSC

  4. Industry Need • Power has become the dominate factor in the design of today’s electronic systems • Explosion in battery operated systems • Many (most) non-portable designs are also constrained by power consumption requirements • Heat generation and dissipation • Practical power supply & management • Current state is a hodge-podge of commercial and ad hoc solutions • SAIF, GAF, etc. • Specification of power aware design characteristics • Often done late at gate-level and ad hoc • Need to verify correctness of power-aware functionality • Done sooner and with higher correlation to design intent

  5. Demonstrated Need • DAC 2006: • TI and Nokia organized a meeting on the topic of an open standard for low power design flows • The 4 top EDA vendors attended • Plus Atrenta • Broad, significant user representation including • TI • Nokia • ARM • ST • Philips • Sun • Shrenik Mehta represented Accellera • Demand for Open, Fast, Inclusive standard

  6. Mission of Accellera Low Power Flow TSC • The accelerated development of an open, comprehensive standard for the specification of power-aware requirements, design intent and implementation, verification and analysis across all design abstraction levels.

  7. Proposed Timeline

  8. UPF from Start to Finish August 28, 2006 – January 23, 2007

  9. Actual Timeline

  10. Actual Timeline P = planned

  11. Highlights • Openness demonstrated throughout • Everyone invited and allowed to participate in TSC • Accellera membership not required to join • Documents available to all TSC members • Fast • Merely 5 months from start to finish • Inclusive • Unprecedented donations from 8 companies • EDA suppliers and users donated • Members and non-members of Accellera

  12. IEEE and Accellera Relationship

  13. Accellera and IEEE • Accellera has long-standing relationship with IEEE • Accellera Technical Committee Policies, Procedures, & Guidelines: • All established Accellera standards are eventually planned for IEEE standardization to speed worldwide acceptance of such standards. • Specification format, strawman donation and any other ownership documents follow or exceed IEEE rules and guidelines. • Plan of record is to transfer UPF to IEEE when complete • Since inception of IEEE Corporate Standards Program, Accellera Board recommends all standards be entity-based • SystemVerilog, PSL, OCI, UPF

  14. CAG/DASC UPF Working Group

  15. UPF Working Group • Submit draft PAR to DASC Chair for SC review and comment NLT 31 Jan 07 • Sponsor PAR jointly with CAG • Draft PAR presented to CAG ~6 Feb 07 • Entity-based • Open to everyone • Initial WG chair: Stephen Bailey • Conduct elections within DASC required 6 month period for all WG officers • Follow prior precedent of operating procedures for jointly sponsored WGs

  16. IEEE Timeline

  17. IEEE Timeline

  18. Request approval of DASC-SC for UPF Working Group Co-Sponsorship Thank you!

  19. On Convergence • The UPF WG is willing: • To accept more than one technology donation • Provide the forum for converging multiple industry formats into a single standard • Change the name of the resulting standard • Conditions: • Only one: All donations for consideration must be submitted quickly