Training on CDM Operations Plans and Sub-ERPA Contracting presented by Dr. Balasankari 01 April 2014
Training on CDM Operations Plans and Sub-ERPA Contracting General PoA process
Training on CDM Operations Plans and Sub-ERPA Contracting Bangladesh PoA Programs Installation of Solar Home System (SHS) in Bangladesh Efficient Lighting Initiative of Bangladesh (ELIB)
Training on CDM Operations Plans and Sub-ERPA Contracting Installation of SHSs in Bangladesh A. GENERAL PROGRAMME DESIGN • Program objective is to install 20 - 200 Wp SHSs to off grid rural households and businesses for lighting, operating TV, charging mobiles, etc. (around 65,000 per month) • IDCOL (state development bank) is the CME and manages the program • IDCOL admits eligible Partner Organizations into the program, extends finance to POs and ensures overall program quality • POs in turn extend credit to households, install and service the SHS • Households pay the cost of SHS through a deposit and monthly installments
Training on CDM Operations Plans and Sub-ERPA Contracting Installation of SHSs in Bangladesh B. POA PROGRAMME STRUCTURE FOR CDM PURPOSES CME (IDCOL) CPA Implementer 1 (IDCOL POs ) CPA Implementer 2 (GrameenShakti) CPA 1 CPA 2 CPA 3 CPA 1 CPA 2 CPA 3
Training on CDM Operations Plans and Sub-ERPA Contracting Installation of SHSs in Bangladesh C. DESIGN OF CPAs • CPAs defined based on year of installation of SHS • Total installed capacity per CPA kept within 15 MW limitas per small scale CDM project criteria • Additionality, stakeholder consultation, environmental impact assessment of CPAs defined at PoA level • CPA 1 (Jun 2007 - Dec 2009) was included along with PoA DD during registration
Training on CDM Operations Plans and Sub-ERPA Contracting Installation of SHSs in Bangladesh D. CPAs - PREPARATION & INCLUSION • First set of 7 CPA inclusions made on 28 Jun 2013
Training on CDM Operations Plans and Sub-ERPA Contracting Installation of SHSs in Bangladesh D. CPAs - PREPARATION & INCLUSION • Second set of 5 CPA inclusions made on 30 Aug 2013
Training on CDM Operations Plans and Sub-ERPA Contracting Installation of SHSs in Bangladesh D. CPAs - PREPARATION & INCLUSION
Training on CDM Operations Plans and Sub-ERPA Contracting Installation of SHSs in Bangladesh D. CPAs - PREPARATION & INCLUSION
Training on CDM Operations Plans and Sub-ERPA Contracting Installation of SHSs in Bangladesh D. CPAs - PREPARATION & INCLUSION
Training on CDM Operations Plans and Sub-ERPA Contracting Installation of SHSs in Bangladesh E. ISSUES FACED • Need for Post Registration Change (PRC) due to changes in monitoring plan • Solution: First all inclusions were completed and then PRC was done to avoid loss of crediting period • Ensuring that an already strong and very large data base would stand up to CDM requirements • Solution: Careful analysis of database to remove 100% of any duplicate / discrepant installations.
Training on CDM Operations Plans and Sub-ERPA Contracting Installation of SHSs in Bangladesh E. ISSUES FACED contd….. • Estimation of installations for future CPAs • Solution: Projections for SHS installations for 2013-14 made based on installations in 2012 • Co-ordinate and collect data from 45+ POs • Solution: Effective inspection team was deployed by CME to collect documents, reports on monthly basis
Training on CDM Operations Plans and Sub-ERPA Contracting Installation of SHSs in Bangladesh F. DEVIATIONS FROM REGISTERED PoA DD “ Biggest issue in PoAprogramme implementations” Modest Post Registration Changes (PRC) were required and made to the Program and CPA DDs to simplify monitoring and eradicate the need to account for leakage
Training on CDM Operations Plans and Sub-ERPA Contracting Installation of SHSs in Bangladesh • Maintain up to date and accurate electronic database • Reduce deviations from monitoring plan as much as possible ahead of issuance • Provide proper training to project staff before DOE site visit • Archive, list and provide all documents for validation in advance of site visits by DOE • Include future CPAs to avoid loss in crediting period G. LESSONS LEARNT
Training on CDM Operations Plans and Sub-ERPA Contracting Efficient Lighting Initiative of Bangladesh (ELIB) A. GENERAL PROGRAMME DESIGN • Distribution of 14 - 24 W energy efficient Compact Fluorescent Lamps (CFLs) in place of incandescent lamps (ICLs) to households in Bangladesh • Maximum of 6 lamps were provided free of cost to households in exchange of old ICLs • 4 power distribution utilities implemented Phase 1
Training on CDM Operations Plans and Sub-ERPA Contracting Efficient Lighting Initiative of Bangladesh (ELIB) A. GENERAL PROGRAMME DESIGN • Phase 1 • Around 10.5 millions lamps were distributed for free to households across Bangladesh • Covered 27 districts in Bangladesh, through over 1,400 distribution centres
Training on CDM Operations Plans and Sub-ERPA Contracting Efficient Lighting Initiative of Bangladesh (ELIB) A. GENERAL PROGRAMME DESIGN • Phase 1 • Issues faced in programme implementations • High delay from household baseline survey to start of distribution • CFLs failed despite receipt of an independent lab test report • Utilities did not properly capture and maintain data • Having 2 different wattage CFLs led to incorrect lumen lamps being exchanged and data capture errors
Training on CDM Operations Plans and Sub-ERPA Contracting Efficient Lighting Initiative of Bangladesh (ELIB) A. GENERAL PROGRAMME DESIGN • Phase 2 • Around 7.25 million planned to be installed in households • Key changes done in program design based on phase 1 experience • Stringent supervision of CFL procurement and standards to improve CFL quality • Direct door-to door CFL installation – baseline survey done same time • Only 1 utility involved and 1 wattage CFL • CME instead of REB takes on overall data base role
Training on CDM Operations Plans and Sub-ERPA Contracting Efficient Lighting Initiative of Bangladesh (ELIB) B. POA PROGRAMME STRUCTURE National Steering Committee (NSC) Rural Electrification Board (REB) - Project Management IDCOL -CME Power distributing utilities
Training on CDM Operations Plans and Sub-ERPA Contracting Efficient Lighting Initiative of Bangladesh (ELIB) C. DESIGN OF CPAs • CPAs based on electricity distribution regions • CPA implementers are the individual power distribution companies • Additionality: Cost of CFL requires CDM revenue • Environmental impact was assessed at PoA level • CPAs responsible for capturing household baseline and project data and providing to REB
Training on CDM Operations Plans and Sub-ERPA Contracting Efficient Lighting Initiative of Bangladesh (ELIB) D. CPAs - PREPARATION & INCLUSION • Further CPAs prepared for phase 2 of ELIB • Set of 8 CPA inclusions made on 30 Nov 2013
Training on CDM Operations Plans and Sub-ERPA Contracting Efficient Lighting Initiative of Bangladesh (ELIB) D. CPAs - PREPARATION & INCLUSION
Training on CDM Operations Plans and Sub-ERPA Contracting Efficient Lighting Initiative of Bangladesh (ELIB) D. CPAs - PREPARATION & INCLUSION
Training on CDM Operations Plans and Sub-ERPA Contracting Efficient Lighting Initiative of Bangladesh (ELIB) D. CPAs - PREPARATION & INCLUSION
Training on CDM Operations Plans and Sub-ERPA Contracting Efficient Lighting Initiative of Bangladesh (ELIB) E. ISSUES FACED • Co-ordination and data collection from various utilities • Solution: Several meetings carried out with utilities to collect data required for CPA preparation • Segregation of CPAs based on distribution regions • Solution: Distribution regions for phase 2 identified after detailed study to avoid duplications in CPAs, potential consumers available in the region, etc.
Training on CDM Operations Plans and Sub-ERPA Contracting Efficient Lighting Initiative of Bangladesh (ELIB) E. ISSUES FACED….contd…. • Change in programme management system • Solution: All proposed changes in phase 2 were studied and included in CPA preparations without major deviations from registered PoA DD • CFL delivery through “distribution centres” changed to “door-to-door direct installation” • Solution: Impact on programme implementation, monitoring plan, etc. were studied and changes done in CPA DD
Training on CDM Operations Plans and Sub-ERPA Contracting Efficient Lighting Initiative of Bangladesh (ELIB) F. HANDLING CHANGES IN PROGRAMME • Many moderate changes in programme plan from phase 1 to phase 2 implementation such as: • CFL specifications • Distribution method • Data management system • Responsibilities of various entities • Changes were incorporated in inclusion CPAs without deviating from registered PoA DD • Hence, no Post Registration Change (PRC) was needed
Training on CDM Operations Plans and Sub-ERPA Contracting Efficient Lighting Initiative of Bangladesh (ELIB) • Provide flexibility in monitoring plan for minor corrections • Maintain a central database with strong quality control • Minimize changes during programme implementation • Incorporate changes in CPAs without deviating from registered PoA DD G. LESSONS LEARNT
Training on CDM Operations Plans and Sub-ERPA Contracting Questions & Discussions