EPSCoR/NSHE C2 Grant Wrap UP

EPSCoR/NSHE C2 Grant Wrap UP. Las Vegas Metro Fiber Ring Upgrade Project Presented By: Ed Anderson and Stanton Gurr. Purpose of Project. To upgrade the existing southern metro fiber ring capacity from 1 Gbps to 10 Gbps in order to enhance backbone network capability for :

sela
Download Presentation

EPSCoR/NSHE C2 Grant Wrap UP

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EPSCoR/NSHE C2 Grant Wrap UP Las Vegas Metro Fiber Ring Upgrade Project Presented By: Ed Anderson and Stanton Gurr

  2. Purpose of Project To upgrade the existing southern metro fiber ring capacity from 1 Gbps to 10 Gbps in order to enhance backbone network capability for : • K-12 and Higher Education Distance Learning • Research • Medical School Training and clinical programs • Cooperative Extension programs • State and Local Gov’t./Public Safety Applications

  3. C2 Project Implementation • Implementation Plan • Unanticipated Challenges • Lessons Learned • Current Overall Status • Optical upgrades complete • Router upgrades due to be complete by 8/15/12

  4. Benefits Gained • Increased network capacity to support EHR mandate and rural health clinical programs • Full 10 Gbps backbone capacity to the commodity and I2 Internet to support the NSHE research community • Added support for K-12 and Higher ed. Internet access and Internet based distance learning capabilities • Provides needed backbone capacity to support growing high bandwidth video application and collaboration requirements

  5. How C2 Grant Fits Into An Overall Strategy • I2/Commodity Internet Upgrades • North/South Tie Line Upgrades – leased and dark fiber • North/South Metro Ring Upgrades • Joint Infrastructure Collaborative Network Development Agreement with NDOT/ITS • I-80, I-580, US 395, Reno Metro Fiber – TMCC/DRI, LV Fiber/Conduit Availability • Digital 395 • Fiber in Carson City Area • Nevada Hospital Association • Rural last mile broadband enhancements in support of EHR mandates

  6. Unfinished Business/Future Opportunities • Still only 1 PoP input to southern ring • Institution LANS need to be upgraded to take advantage of 10 Gbps backbone • NDOT Fiber/conduit availability in LV • NDOT/ITS phase 2 and beyond • Create a next generation video plan to integrate both traditional video room and mobile video functionality

  7. Conclusions • NSHE would like to thank EPSCoR for its support to date • The current C2 project will be completed on time and on budget • Many other collaborative opportunities still exist and NSHE will be looking to EPSCoR to again provide valuable support for some of these collaborative initiatives