AGS Status and Plans RHIC Spin Collaboration Meeting 2 /11/ 11

AGS Status and Plans RHIC Spin Collaboration Meeting 2 /11/ 11. Update. Two major goals Put the jump quads into operation Minimize the emittances We have a timing setup that seems to reliably improve polarization

selima
Download Presentation

AGS Status and Plans RHIC Spin Collaboration Meeting 2 /11/ 11

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AGS Status and PlansRHIC Spin Collaboration Meeting2/11/11

  2. Update • Two major goals • Put the jump quads into operation • Minimize the emittances • We have a timing setup that seems to reliably improve polarization • There is ~5% intensity loss from jump quads, this cannot account for the improved polarization • Several cursory timing scans were performed, need to decide on ‘best’ times and do a thorough study (profiles, timing shifts with good statistics) • They increase the emittances enough to affect AtR efficiency, this has to be understood and improved. • Tuning the ‘no-jump-quad’ machine for optimal emittance and then turning on the jump quads does not work (snake BLM permit pulls). The quads are a significant constraint on the setup, we have to commit to running them operationally.