1 / 8

AGS Status

AGS Status. Haixin Huang. RSC Meeting March 23, 2012. Status. Continued to provide pp beam for RHIC physics program.

marie
Download Presentation

AGS Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AGS Status Haixin Huang RSC Meeting March 23, 2012

  2. Status • Continued to provide pp beam for RHIC physics program. • Sweep polarization measurements have been taken in the AGS to derive the polarization profile information in both vertical and horizontal. Some preliminary results on horizontal profiles • Not strong intensity dependence on intensity up to 2*10^11. • Plan to reduce the AGS cycle time from 4 sec to 3 sec to reduce injection time (emittance growth issue). Haixin Huang

  3. AGS/RHIC Polarization for 255GeV Fills Haixin Huang

  4. AGS Polarization and Intensity for RHIC Fills 255GeV Haixin Huang

  5. AGS Polarization for RHIC Fills Haixin Huang

  6. AGS Horizontal Polarization Profile (Andrei) Preliminary (Jump Quads off) Haixin Huang

  7. AGS Horizontal Polarization Profile (Andrei) Preliminary (Jump Quads on) Haixin Huang

  8. AGS Simulation with ZGOUBI (YannDutheil and Francois Meot)

More Related