Energizing West Michigan with Offshore Wind Power. West Michigan’s greatest assets. Access to the world via cheap transportation via the water An unmatched manufacturing base with a world class quality control standard honed by the auto industry Innovation Entrepreneurial DNA.
E N D
West Michigan’s greatest assets Access to the world via cheap transportation via the water An unmatched manufacturing base with a world class quality control standard honed by the auto industry Innovation Entrepreneurial DNA
Critical factors to establish a turbine manufacturing base “In order to stimulate manufacturing there is need for a sizeable local market, with a competitively priced power purchase agreement and a strong grid connection available to service the expansion of a large offshore project”” A major US Original Equipment Manufacturer (OEM) of wind turbines • Stable regional energy market • Suitable sites for wind farms • Test facilities for new turbine design • Incentives to establish manufacturing facilities • Support for training new employees • Strong supply chain potential within reasonable distance Scandia Wind intends to share its broad network and experience to enhance the current work underway to diversify Michigan into the wind industry.
The Aegir project -- a catalyst to attract an OEM? • Make the project large – offer unit volume to the turbine manufacturer willing to build manufacturing facilities in the region: • an onshore wind farm of 150 MW • two offshore facilities (2x500 MW) • one test site • Facilitate an in-house test facility connected to the BC Cobb plant or former waste water treatment site on Muskegon Lake • Make a public/private partnership between the manufacturer and the State, enhancing public economic support for the test turbine and test program • Work with the state to get a permanent support scheme in place to establish a permanent market for offshore wind power in the Great Lakes
Why Now? Michigan needs to be first in the lakes Whoever is first has the manufacturing and infrastructure head start • The Competition is leading: • Ohio • New York • East Coast • Ontario
Scandia Wind Offshore A proposal West Michigan Make the West Michigan lakeshore region an offshore wind energy hub with the goal to generate 3,000 new jobs in the renewable energy industrial sector
What is important for siting offshore wind farms? • Better wind conditions than onshore. 10% change in mean wind is 30% change of mean power production (rule of thumb) • Transmission capacity in existing power lines. • Proximity to major consumption areas • Ability to build bigger than onshore
Wind Quality and LoadCenters in the U.S. Michigan is situated near three large load centers • Blue - high wind potential • Brown - large demand centers • Green - little wind and smaller demand centers.
The Aegir project sketch, approximately 1,150 MW • 150 MW at Muskegon Wastewater Treatment Plant • Two off-shore sites: 500 MW each • 5 – 10 MW wind turbines • 100 – 200 turbines • 300 – 450 feet high towers • $3-$4 billion investment • 3.7 billion kWh per year based on 9 m/s • average wind speed • Powering over 300,000 US households Ludington Aegir I Aegir III Muskegon Grand Haven Aegir II
Placing the Wind Turbine – Concrete Foundations • Potential Additional Manufacturing Opportunity. • A 1,000 Megawatt wind farm would require (approximately): • 1 million tons of concrete • 200,000 tons of steel • 2 million man-hours of labor for foundations • Foundation Production Cost: $500 million - $1 billion
Aviation lighting and watercraft navigation • No operationalaviationlightingon a daily basis: • Radar system to detectaircraft • Activatestheaviationlighting system when • aircraftcomewithin a certaindistance • Activates radio message to the pilot if • entering an innercircleofthewind farm • FAA approved • Fog horns and navalnavigationlighting: • Fog horns and navalnavigationlighting must • be heard from at least 2 mile distance from • theouterboundariesofthewind farm • Will in normal circumstances never be heard from theshore. Only under veryspecificweatherconditionswillthe fog horns be heard
Goals for the Aegir Project • Successfully develop, build and operate: • 150 MW onshore wind farm • 1,000 MW offshore wind power in Lake Michigan • Develop the offshore wind industry using the Aegir project as a stepping stone: • Attract a turbine manufacturer to the region • Develop the supply chain connected to the manufacturing facilities • Develop the port of Muskegon as center for offshore renewable activities • Establish O&M facilities in Mason County and Muskegon
Additional Goals Link with university research and technology development efforts • Increase the offshore wind knowledge base of universities and research facilities in Muskegon area • Turbine research facility connected to MAREC • Technicians for O & M -- trained at local community colleges
Renew(able) Muskegon Aegir 2 grid interconnection Test turbine site MAREC,R&D O&M Site Current SAPPI site, potential manufacturing site
10 MW 100 meter hub height B.C. Cobb plant in Muskegon 198 meters
Turbine manufacturing and supply chain “ripple effect” In creating an industry epicenter in Muskegon, many job opportunities will be generated. By succeeding attracting an OEM to Muskegon, approximately 3,000 jobs could be created. Most jobs would be in the supply chain -- creating opportunities for existing and new businesses in the region.
Estimated total job creation to construct the Aegir project Aggregated results from the Siragrunnen (S) and Mariah (M) projects: • Approximately 3,500 man-years in the construction phase (S) • Approximately 100 direct permanent jobs in the operational phase (S) • Approximately 200 to 300 indirect jobs in the operational phase (rule of thumb) • Potentially approximately 3,000 jobs in turbine supply chain activities that can become permanent jobs (M) Separate analysis will be performed for the Aegir project
Going Forward – Estimated Timetable • Local advice • Define layout • Comp model • MISO application • Lease application • Environmental studies • Non environmental studies • Permits applications • Wind measurements Grid access approvals Lease approval Counties, Twps, and Munis advice 2011-2013 2009 - 2010 2011-2012 2013-2015 2015-2020 • Financing • Commercial agreements Financial closure • Construction Commissioning All permits issued
Sample of Permits Needed Federal US Army Corps Of Engineers National Environmental Policy Act US Coast Guard Costal Zone Management Act Fish and Wildlife Service Eagles Protection Act Migratory Bird Treaty Act National Historic Pres Act Federal Aviation Agency State MI Public Service Comission Department of Environmental Quality Great Lakes Submerged Lands MI Endangered Species Law Water Quality Certification
Studies to be Performed (for approvals by State and Federal agencies) Over 20 studies to be performed, including (among others): • Habitat/Biological (above water, below water) • Cultural Heritage • Native Tribes fishing impacts • Private Industry • Transportation/Navigation
Summary: Why is the Aegir Project being considered in Michigan? • Excellent wind conditions • Feasible water depths • Excellent grid capacity • The Ludington pump storage facility, potentially working as a “battery” for the wind farm • The B.C. Cobb plant in Muskegon will likely be closed, providing approximately 500 MW of grid capacity • Close to major load centers reducing transfer losses • Strong political drivers towards offshore • Reduces CO2 emissions by 2.2 million tons yearly • The Aegir project will reproduce all energy used to put it into operation appr 42 times • The Aegir project will be carbon neutral after appr 7 months in operation
Next steps as we see it (subject to local authorities input) Discuss the options with the local authorities: • Gauge interest in moving forward • Modifications of the project • Fixed distance from the shore • Overall shape and size • Compensation model • Presentations to the local boards • Counties’ advice on stopping the project or moving it into the further studies, preferably by September 1
Compensation Model Scandia Wind Offshore proposes the following compensation model for the Aegir Project: • $2,000 per megawatt (“Fixed”) annual compensation paid to Muskegon County and Ottawa County Or • A “revenue-share” model (“Variable”): a percentage (to be determined) of gross revenue produced by the proposed wind farm Or • A mutually-agreed upon combination of the Fixed and Variable compensation models A Public/Private Partnership whereby Muskegon County and Ottawa County receive a profit-share in the project
Request of the Counties Approval of the project is not requested at this point, merely advice as to whether the View change is acceptable in order to move forward with environmental, socioeconomic and technical studies
The Aegir project: Energy Clean Jobs www.theaegirproject.com