Personal Rapid Transit Impact on Intermodality and Safety at Heathrow and Masdar Dr Chris Elliott FREng Pitchill C

Personal Rapid Transit Impact on Intermodality and Safety at Heathrow and Masdar Dr Chris Elliott FREng Pitchill Consulting Ltd . Structure. Reminder – what is PRT and where is it in operation? Safety – principles, practices, evidence Future – what might PRT do for urban transport?.

sema
Download Presentation

Personal Rapid Transit Impact on Intermodality and Safety at Heathrow and Masdar Dr Chris Elliott FREng Pitchill C

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Personal Rapid TransitImpact on Intermodality and Safety at Heathrow and Masdar Dr Chris Elliott FREngPitchill Consulting Ltd

  2. Structure • Reminder – what is PRT and where is it in operation? • Safety – principles, practices, evidence • Future – what might PRT do for urban transport?

  3. Data from UK Transport 2010 Passenger transport by mode Rush hour: that hour when traffic is almost at a standstill. J.B. Morton. "the bus system may be regarded as a welfare service for the underprivileged minority". Thomson

  4. PRT overview • Pods: Small, fully automated, battery-powered electric vehicles, with zero on-site emissions. • Infrastructure: Light, flexible & aesthetic guideways and stations are lower cost & can be routed where needed • Control system: You don’t wait for vehicles – vehicles wait for you. No transfers, no routes to memorize.

  5. Trevithick Daimler 1 0.9 0.8 ? Trunk road/ Route Nationale 0.7 0.6 ? Motorway/Autoroute Build Rate re Max 0.5 0.4 0.3 CANAL RAIL 0.2 0.1 0 1840 1860 1880 1900 1920 1940 1960 2000 2020 2040 1760 1780 1800 1820 1980 Transport history PRT? ROAD

  6. Existing PRT systems • Two systems in operation – both are first phase of larger system • Heathrow Airport – Pod between Terminal 5 and Business Car Park – video1 • Abu Dhabi – MASDAR Institute of Science & Technology – video2

  7. Ease of installation • Patented small scale infrastructure optimised for PRT • Modular design • Small radii (5m) and high grades (>10%) permitted • Installation of 3-bay elevated section completed in 4 hours

  8. 2.0 1.5 1.0 MJoule per Passenger km 0.5 0.0 Rail PRT Urban bus Urban Car Energy use

  9. 1.2 1.0 0.8 Tonnes/Seat 0.6 0.4 0.2 Average Person 0.0 Cycle Motor PRT Bus Typical Modern Local Eurostar 747 cycle car LRT train Empty weight per seat

  10. Structure • Reminder – what is PRT and where is it in operation? • Safety – principles, practices, evidence • Future – what might PRT do for urban transport?

  11. Safety • High level of intrinsic safety • < 40 kph • Dedicated guideway, no at-grade crossings • Fixed block or sensors – video 3 • No driver! • Systematic process • Safety policy – clear allocation of duties • Safety targets – what is acceptable • Hazard ident. => Risk assessment => Mitigation => Acceptance • Independent verification • No significant incidents in 3 years’ operations

  12. Structure • Reminder – what is PRT and where is it in operation? • Safety – principles, practices, evidence • Future – what might PRT do for urban transport?

  13. Costs • Toronto International Airport light rail • Cost $58M per km • PRT would have cost $15M per km (2010 figures) • Birmingham AirRailLink • cost $20M per km to refurbish • New PRT would have cost under $15M per km • Montpellier light rail • cost €21.8M per km • PRT system would have cost between <€9M per km (EDICT 2004 figures) • Oakland Airport • costedat $48M per km • PRT would cost $9-12M per km All figures provided by ULTraPRT

  14. Urban integration Amritsar Golden temple – video 4 Office campus – video 5 Personal public transport that fits within existing urban structures – part of an integrated transport infrastructure

  15. Integrating PRT into an urban renewal scheme