1 / 12

Glasgow TID irradiations experience

Glasgow TID irradiations experience. Dima Maneuski On behalf of many people who helped. Motivation. Motivation for the talk Some insights into the TID irradiation kitchen @ Glasgow Share experience: Setting up the facility TID Metrology Environment monitoring and automation

senta
Download Presentation

Glasgow TID irradiations experience

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Glasgow TID irradiations experience • Dima Maneuski • On behalf of many people who helped

  2. Motivation • Motivation for the talk • Some insights into the TID irradiation kitchen @ Glasgow • Share experience: • Setting up the facility • TID Metrology • Environment monitoring and automation • DUT monitoring • Organisational aspects • RD533A irradiation plans Dima Maneuski

  3. How its all started • How its all started • Bought AmptekMiniX X-ray tube for public engagement • Quickly realised that fluorescence is a very powerful tool for detector characterisation (e.g. 5min vs 20h for same Fe spectrum on a CMOS sensor) • Got to build setup inspired by one at DetDev group @ Diamond Light Source • Primarily for detector characterisation and related experiments: X-ray radiography, fluorescence, collimated beam, CT etc. • Got approached by LHCb for a possibility to irradiate VELOPix. And that’s when the TID irradiations started…. Dima Maneuski

  4. TID metrology • TID metrology • Most critical part of setup for TID • Two independent measurement approaches: • PIN diode for “digital” measurement (thanks to John Mathieson from RAL) • “Ultimate” measurement by film (thanks to Federico Ravotti from CERN) • And beam image with Medipix • Characterisation of the system: • Dose rate • Dose rate stability • Dose rate as function of distance • Beam profile Dima Maneuski 3

  5. TID metrology • TID metrology peculiarities Tube or PIN diode? Turned out -> PIN diode! @ a cost of burning permanent pattern into Medipix chip PIN diode has some sort of temperature threshold! Once above ~25C, current doubles Got air conditioning installed in the lab And verified / adjusted PIN diode calibration with the film Dima Maneuski

  6. Experimental setup 0.45 Mrad/h @ 40 cm • Metrology of beam size 1.3 Mrad/h @ 20 cm 3.1 Mrad/h @ 10 cm Dima Maneuski

  7. Monitoring and automation • Environment monitoring and automation (hardware) • Thorlabs mechanics (optical table, plates, breadboards, adapters, posts, etc, etc.) • Standa 3 axis linear stage, rotation stage, goniometer, rotation wheel • Owis 2 axis linear stage • Environment monitoring based on • Arduino plus various sensors • Pen laser for alignment • Amptek SDD for Xray tube spectrum • measurement Dima Maneuski

  8. Monitoring and automation • Environment monitoring and automation (software) • Most instrumentation control is Labview based • Templated VI into which one copy-pastes new hardware Settings tab Remote control log • Connect to VI via socket • Send control command • Receive response message • Script through language of your choice (as soon as its support sockets) • Combine instruments • Make coherent measurement Device Control Output monitoring Error reporting Dima Maneuski

  9. Monitoring and automation • Example of automation (RD53A powering + monitoring) • One VI to control VDDx and monitor current (TTI QL355TP) • Two instances of VI to monitor LDOs for VDDx (two Keithley 2700) • Three python scripts: • Set VDDx/measure current on TTI • Measure two LDOs with K2700 • Plot results as function of time Dima Maneuski

  10. Future plans • Future plans • RD53A: • Make RD53A specific cold box: • Simplify DUT monitoring inside the box • Simplify device exchange • Improve DUT mounting with respect to beam • Improve cold temperature (now -12 degrees, hopefully -20 to -30) • Use same box for in situ post irradiation characterisation, ToT calibration with fluorescence (for RD53+Si) • Improve laser alignment • Improve cold box mounting • Near future irradiation plans: 200 Mrad (possibly week 14th May), 200 Mrad (possibly week 21st May), 100 Mrad (possibly week 4th June). Dima Maneuski

  11. Experimental setup • Setup overview • Gulmay3.2kW HV generator • Thales 100 kVp tungsten X-Ray tube • 120 um Al film filter • GulmayMP1 integrated controller • 150x120x120 cm lead lined box • Laser sample alignment system • 35x25x6 cm cold sample box (down to -25 °C with Peltier cooling) • Dry air supply • Automated X-Y stages • Automated ambient temperature and humidity logging, DUT temperature logging Dima Maneuski

  12. TID irradiations • Experiments • Conducted four experiments starting from December 2016 • VELOPix irradiations for LHCb 13/12/16 – 22/12/16 • Delivered 400 MRad of SiO2 equivalent TID • AMS350 basic transistors 31/01/17 – 15/02/17 • Delivered 100 MRad of SiO2 equivalent TID • SALT128 ASIC for LHCb 24/04/17 – 28/04/17 • Delivered 20 MRad of SiO2 equivalent TID • RD53A chip for RD53 collaboration 15/04/18 – 19/04/18 • Delivered 110 MRad of SiO2 equivalent TID Dima Maneuski

More Related