An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. USM Hydrographic Science2004 Class Field Project Upper Pearl River Survey 15 June – 30 July 2004

  2. USM Faculty and Staff Prof David Wells Prof Stephan Howden “The Man” David Dodd “Tech Genius” Erik Quiroz CAPT Marshall Smith – NAVO Clay Whitaker - NAVO Art Najjar – NAVO George Oliver - NAVO NAVO Instructors and techs Roy Johnson – USGS Karl Rhymas - QTC Special Thanks USM 2004 Upper Pearl Survey

  3. Outline • Introduction – Todd • History - Todd • Preparation activities: Existing control - Todd • Preparation activities: HSS - Todd • Preparation activities: Tides - Jennifer • Preparation activities: Skiff Line building - Rafael • Preparation activities: Skiff Calibrations - Dan • Preparation activities: Data management - Chad • Preparation activities: Bertram Calibrations - Brad • Execution: Bertram General setup, Primary equip, Logistics – Brad • Execution: Skiff General setup, Primary equip, Logistics - Dan • Execution: Ancillary observations - James USM 2004 Upper Pearl Survey

  4. Outline (cont.) • Processing: GPS - Debbie • Processing: Multibeam – Katie • Processing: Single-beam and Side-Scan – Chris • Processing: Navaids positioning - Rafael • Processing: Vertical Uncertainty Management – Bugser • Processing: Horizontal Uncertainty Management - Debbie • Products: Digitize shoreline - Debbie • Products: Field Sheets – Katie • Products: Field Chart – Dan • Products: ENC - Debbie • Products: HPD – Rafael • Products: Fly Through - Chad • Products: ROS - Todd • Conclusion - Todd USM 2004 Upper Pearl Survey

  5. Purpose • Why conduct this particular survey? • Provide practical experience to cement theoretical knowledge • Extend USM’s dataset from the I-10 bridge northward • GET A DEGREE!!! USM 2004 Upper Pearl Survey

  6. History • Site Selection • Potential sites selected during Dave Dodd’s, Hydro Data Mngt Course • Upper Pearl (I-10 to SSC) • Lower Pearl (Hwy 90 to St. Joe’s Pass) • Bayou Caddy/St. Joe’s Pass • Upper Pearl selected for: • Complexity • Proximity to SSC • Data uses (USM, NAVO, SBT) USM 2004 Upper Pearl Survey

  7. Survey Area I-10 SSC USM 2004 Upper Pearl Survey

  8. Primary Survey Equipment • Equipment: • Bertram (EM3000 MB, Klein 3000 SSS, Seabird CTD, POS M/V) • USM Skiff (Knudsen 320MP single-beam, Marine Sonic SSS (150, 300 KHz), Digibar Pro (SVP), Trimble MS 860 (WAAS Enabled) • Positioning (Ashtech Z-Xtreme in PPK mode) • Tides (Sutron 8210 (2), OTT) • Ancillary (Bottom Grab, Secchi disk) USM 2004 Upper Pearl Survey

  9. Existing Data • Imagery (Louisiana Atlas, MARIS) • MARIS data (rivers, roads, etc) • Census Data • Chart (11367, 32nd Ed, July 2003) USM 2004 Upper Pearl Survey

  10. Preliminary Planning • Gathered existing data/Conducted interviews • Selected HIC, Party Chiefs and SME’s • Determined timelines and milestones • Two weeks of data collection, processing and presentation preps. • Determined data collection priorities • Soundings • ATONs • Contacts • Shoreline • Grabs and Secchi USM 2004 Upper Pearl Survey

  11. Existing Control • Geodetic: USM1, Dead End • Tidal: I-10 (1960-1978 EPOCH) USM 2004 Upper Pearl Survey

  12. Hydrographic Survey Specification USM2004-01 • Initially written during HYD608 • Group 2’s HSS selected as most complete, updated by group at the beginning of the survey. • Final HSS: USM2004-01 USM 2004 Upper Pearl Survey

  13. HSS: Major Sections • Append 2: Tidal Data • 3 Tide Gauges (SBT Quaywall, Hancock Pier, I-10) • 30 days of data collected • Weekly observations • Reduce soundings to MLLW • Append 3: Wreck List • No known wrecks USM 2004 Upper Pearl Survey

  14. HSS: Major Sections • Append 4: Geodetic Data • Data referred to NAD83 (equivalent to WGS84 for charting) • Landmarks referenced to NAVD88 • PPK positioning (Order 1 accuracy) • Append 8: Specific Charting Info. Requirements • All soundings, ATONS, and shoreline features will be delineated to Order 1 standards • All Landmarks within visual site of the river will be positioned • All Aids to Navigation will be located and described • Report discrepancies for Aids to Navigation to the local U.S. Coast Guard District (District 8) USM 2004 Upper Pearl Survey

  15. HSS: Major Sections • Append 9: Oceanography • Sound Speed • CTD casts will be taken 3 X daily aboard the Bertram • SVP casts will be taken 3 X daily aboard the Skiff • SVP corrections will be applied onboard for Bertram and within CARIS for the skiff • Multibeam • 10 % overlap required • Single-beam • 25 m line spacing for development lines and 250m line spacing for cross-check lines • Ancillary data: Secchi and bottom grab data will be collected daily USM 2004 Upper Pearl Survey

  16. Preparation Activities:Tides and Leveling Jennifer Wozencraft

  17. Report of Survey • Modeled after template provided by Lcdr. Don Ventura, Royal Navy. • ROS broken into many sections. Sections written by the SME’s. • Written during and after data collection and processing. USM 2004 Upper Pearl Survey

  18. ROS Format TABLE OF CONTENTS ChapterPage 1.Introduction - Todd 2.Geodetic Control - Debbie 3.Digital Surveying System - Dan 4.Sonar - Chris 5.Calibrations - Chad 6.Hydrography (Bathymetry) - Rafael 7.Oceanography - Dan 8.Geophysical - Brad 9.Sailing Directions and Nomenclature - Katie 10.Tides, Tide Gages and Sounding Datum - Jennifer 11.Tidal Streams and Currents - Jennifer 12.Seabed Topography and Texture - James 13.Charted and Uncharted Wrecks and Obstructions - Brad 14.Charted and Uncharted Lights, Navaids, Buoys and Piers - Rafael 15.Coastline, Topography, Measured Distances, Conspicuous Objects and Fixing Marks - Katie 16.Ancillary Observations - James 17.Accuracy of Soundings - Bugser 18.Positional Accuracy - Debbie 19.Summary/Closing Remarks - Todd 20.Accompanying Forms, Files and Documents - Chad

  19. Conclusion • Survey area was CHALLENGING • Next time we will take the harbor • Maximum Group Effort • Avoided the dangers • Snakes • Alligators • Poison Ivy USM 2004 Upper Pearl Survey