1 / 18

Renewable Energy for Palestinian Villages

INGENI Ø RER UDEN GR Æ NSER. Renewable Energy for Palestinian Villages. EWB Denmark Team. Attila. Paw. Jules. Kristen. Katja. INGENI Ø RER UDEN GR Æ NSER. INGENI Ø RER UDEN GR Æ NSER. 1 st semester research report. Preparing implementation of PV and wind technologies. 4.

sera
Download Presentation

Renewable Energy for Palestinian Villages

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. INGENIØRER UDENGRÆNSER Renewable Energy for Palestinian Villages

  2. EWB Denmark Team Attila Paw Jules Kristen Katja

  3. INGENIØRER UDENGRÆNSER

  4. INGENIØRER UDENGRÆNSER 1st semester research report Preparing implementation of PV and wind technologies 4

  5. INGENIØRER UDENGRÆNSER 1st semester research report • How can renewable technologies satisfy the needs and improve the quality of lives for villagers of Haribat-an-Nabi and Qawawis in a sustainable way? • Goal: Electrification of remote Palestinian villages • Who are our primary stakeholders? • Possible challenges for collaboration? • What are the villager’s needs? • Long and short term • What are our technological options? • What is the availability of funding? • Allocation?

  6. INGENIØRER UDENGRÆNSER Original Project

  7. INGENIØRER UDENGRÆNSER

  8. INGENIØRER UDENGRÆNSER Gawawis Haribat an-Nabi • EWB Palestine + PPU or BZU Students • Central hybrid wind system for water pumping and electricity supply • 4 to 6 families • 47,000 DKK • Expansion of project activities for a Gawawis II project has been supported by a 150,000 DKK grant • Comet-ME + Technion students • Solar electrification system • 12 families • 244,000 DKK • EWB-Denmark - 131,000 DKK • Comet-ME -113,000 DKK

  9. INGENIØRER UDENGRÆNSER FIELD TRIP & OBSERVATIONS 9

  10. NO COMMENT

  11. 13

  12. INGENIØRER UDENGRÆNSER • Challenges Faced • Project reformation • Managing people and getting valid information • Understanding of a complex situation (history & culture) • Timeframe and $$$$$ • Lack of experience

  13. INGENIØRER UDENGRÆNSER What we expect in May? Pictures of a recently finished project

  14. INGENIØRER UDENGRÆNSER The Engineer's Society of Engineers in Northern Jutland is arranging an event on Do-It-Yourself Wind and Solar Energy Month:April , Day: ?? Where: Aalborg (TBA) If you are interested in attending this 2 hour seminar please emailkristenskelton@hotmail.com

  15. INGENIØRER UDENGRÆNSER “Never doubt that a small group of thoughtful, creative, committed citizens can change the world. Indeed, it is the only thing that ever has” Margaret Mead