1. OPS Direct Assessment Workshop OPS Direct Assessment Research and Development Projects
James Merritt
R&D Program Manager,
Office of Pipeline Safety
james.merritt@RSPA.DOT.GOV
November 4, 2003 Good Morning
I plan on looking into the Crystal ball today and focus on IMP & OPS R&D role
Some of these slides were just added and are not in your handouts.
Good Morning
I plan on looking into the Crystal ball today and focus on IMP & OPS R&D role
Some of these slides were just added and are not in your handouts.
2. OPS GOAL OPS R&D effort stimulates economic activity, creates job opportunities and strengthens the industry’s competitive position in global markets.
OPS will match one-for-one industry’s R&D contribution to collaborative research. This will stretch industry’s research dollar and ensure OPS research priorities accurately reflect the sector’s real needs. Speed up the process of transferring new technology into the private sector.
The OPS R&D Goals are to fill the technical Gaps and insure safe and reliable delivery of the nations energy needs.The OPS R&D Goals are to fill the technical Gaps and insure safe and reliable delivery of the nations energy needs.
3. New Standards and RulesDriving Recognition of R&D Needs Need for Integrity Management Requirements Recognized
New Assessment Technologies Available
Ineffective Risk Data Integration Contributed to Major Incidents & Accidents
Development of Consensus Standards and Rules Highlighted Knowledge and Technology Gaps Standards & Rules are the drivers
New DA technologies are needed
OPS working with industry partners is planning to validate and showcase the new technologies though hosting workshops and public forumsStandards & Rules are the drivers
New DA technologies are needed
OPS working with industry partners is planning to validate and showcase the new technologies though hosting workshops and public forums
4. Examples of IdentifiedGaps Cost effective methods to Assess Pipes that cannot be Inspected using ILI
Improved Leak Detection over a wide range of Leak Rates
Ability to Real-Time Monitor Parameters affecting Pipe Integrity
Ability to Integrate Risk Factor Data OPS is investigating three different approaches using Ultrasonics to inspect un-piggable pipe
Shorter response time in control room operations is an area OPS has identified for future R&D activitiey
Using DA information along with historical data to better predict failure analysis is a cost effective & time saving toolOPS is investigating three different approaches using Ultrasonics to inspect un-piggable pipe
Shorter response time in control room operations is an area OPS has identified for future R&D activitiey
Using DA information along with historical data to better predict failure analysis is a cost effective & time saving tool
5. Continuing R&D Needsfor Direct Assessment Validate ECDA Techniques
Validate Confirmatory Direct Assessment
Validate Application of ECDA for Detection of Mechanical Damage
Verify ICDA Consensus Standard
Develop and Validate Wet-Gas ICDA Process
Develop and Validate SCC DA Process OPS is planning a workshop on DA with other government agencies and industry
We can research the heck out of something. New technologies also need to be validated in the field
In addition, new and or modified standards need to be put into placeOPS is planning a workshop on DA with other government agencies and industry
We can research the heck out of something. New technologies also need to be validated in the field
In addition, new and or modified standards need to be put into place
7. OPS co-funded DA R&Dactivities Remote-Field Eddy Current to Inspection of Unpiggable Pipelines ($87,500) – SwRI
Long-range Ultrasonic Method for Detection of Degradation in Buried, Unpiggable Pipelines ($500,000) –PetroChem Insp.
ICDA of Gas Transmission, Gathering & Storage Systems($260,165) -SwRI
Improvements to ECDA Assessment Methodology by Incorporating Soils Data & Managing the Integrity of Early Transmission Pipelines ($297K) –Battelle Corporation
Develop high-amplitude guided wave for long range pipeline inspection ($272,420) -SwRI The OPS R&D Goals are to fill the technical Gaps and insure safe and reliable delivery of the nations energy needs.The OPS R&D Goals are to fill the technical Gaps and insure safe and reliable delivery of the nations energy needs.
8. Remote-Field Eddy Current toInspection of Unpiggable Pipelines GOAL: Demonstrate a pipeline inspection method that:
Is sensitive to pipe wall thickness loss
Implemented into a ILI tool
Small enough or partially collapse to allow passage through internal restrictions
TASK:
Technology Assessment
RFEC coil design
Breadboard system
RFEC evaluation
The OPS R&D Goals are to fill the technical Gaps and insure safe and reliable delivery of the nations energy needs.The OPS R&D Goals are to fill the technical Gaps and insure safe and reliable delivery of the nations energy needs.
9. Remote-Field Eddy Current toInspection of UnpiggablePipelines The OPS R&D Goals are to fill the technical Gaps and insure safe and reliable delivery of the nations energy needs.The OPS R&D Goals are to fill the technical Gaps and insure safe and reliable delivery of the nations energy needs.
10. Remote-Field Eddy Current toInspection of UnpiggablePipelines The OPS R&D Goals are to fill the technical Gaps and insure safe and reliable delivery of the nations energy needs.The OPS R&D Goals are to fill the technical Gaps and insure safe and reliable delivery of the nations energy needs.