Muuga Seawater-Pumped Hydro Accumulation Power Plant

Muuga Seawater-Pumped Hydro Accumulation Power Plant. Lembit Vali Energiasalv OÜ Member of Board www.energiasalv.ee. Preliminary researches. Preliminary Research of the Pumped Hydro Accumulation Power Plant . AF Estivo 2009

seth
Download Presentation

Muuga Seawater-Pumped Hydro Accumulation Power Plant

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Muuga Seawater-Pumped Hydro Accumulation Power Plant Lembit Vali Energiasalv OÜ Member of Board www.energiasalv.ee

  2. Preliminary researches • Preliminary Research of the Pumped Hydro Accumulation Power Plant. AF Estivo 2009 • Brief Description of the Muuga Seawater-Pumped Hydro Accumulation Power Plant. AF Estivo 2010

  3. Geological surveys • Geological and Hydrogeological surveys of the Maardu Granite Massif. USSR, Ministry of Geology 1979 • Additional Geological and Hydrogeological surveys of the Maardu Granite Massif. Geological Survey of Estonia 2010

  4. What we already have • Letter of intent with AS Tallinna Sadam • Confidentiality and non-competition agreement with Ministry of Economic Affairs and Communications • Preliminary design of the water intake • Preliminary design of the railway • Budgetary Enquiry Pre-Engineering services 5 Budgetary offers:Pöyry,Vattenfall,Sweco,Ramboll, AF Colenco • Proposal for Tecnical Consultancy Services. AF Colenco • Pump Turbine Preliminary Technical Note. Alstom

  5. Ongoing activities • The Detail Planning. Linnaruumi OÜ • Strategic Environmental Assessment. • Environmental Impact Assessment for a) Water use permit, Ramboll Finland OY b) Building permit. Ramboll Eesti AS • Main Aspects of assessment: • Impact on graund water • Impact on marine life • Impact on shoreline erosion • Impact on the living: noise, dust, real estate price