Muuga Seawater-Pumped Hydro Accumulation Power Plant. Lembit Vali Energiasalv OÜ Member of Board www.energiasalv.ee. Preliminary researches. Preliminary Research of the Pumped Hydro Accumulation Power Plant . AF Estivo 2009
E N D
Muuga Seawater-Pumped Hydro Accumulation Power Plant Lembit Vali Energiasalv OÜ Member of Board www.energiasalv.ee
Preliminary researches • Preliminary Research of the Pumped Hydro Accumulation Power Plant. AF Estivo 2009 • Brief Description of the Muuga Seawater-Pumped Hydro Accumulation Power Plant. AF Estivo 2010
Geological surveys • Geological and Hydrogeological surveys of the Maardu Granite Massif. USSR, Ministry of Geology 1979 • Additional Geological and Hydrogeological surveys of the Maardu Granite Massif. Geological Survey of Estonia 2010
What we already have • Letter of intent with AS Tallinna Sadam • Confidentiality and non-competition agreement with Ministry of Economic Affairs and Communications • Preliminary design of the water intake • Preliminary design of the railway • Budgetary Enquiry Pre-Engineering services 5 Budgetary offers:Pöyry,Vattenfall,Sweco,Ramboll, AF Colenco • Proposal for Tecnical Consultancy Services. AF Colenco • Pump Turbine Preliminary Technical Note. Alstom
Ongoing activities • The Detail Planning. Linnaruumi OÜ • Strategic Environmental Assessment. • Environmental Impact Assessment for a) Water use permit, Ramboll Finland OY b) Building permit. Ramboll Eesti AS • Main Aspects of assessment: • Impact on graund water • Impact on marine life • Impact on shoreline erosion • Impact on the living: noise, dust, real estate price