An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. JAKE POLLACK STRUCTURAL OPTION AE 897G – SENIOR THESIS NEW YORK POLICE ACADEMY COLLEGE POINT, NEW YORK

  2. PRESENTATION OUTLINE INTRODUCTION NEW YORK POLICE ACADEMY COLLEGE POINT, NEW YORK INTRODUCTION EXISTING STRUCTURAL SYSTEM PROBLEM STATEMENT PROBLEM SOLUTION THESIS REDESIGN ARCHITECTURAL IMPACT COST AND SCHEDULE IMPACT CONCLUSION PURPOSE AND FEATURES FUNCTION: ACADEMY SCALE: 1,000,000 SF $656 MILLION CONSTRUCTION: DESIGN-BID-BUILD OCTOBER 2010 – DECEMBER 2013 150’ MAPS.GOOGLE.COM 536’ 95’

  3. PRESENTATION OUTLINE INTRODUCTION NEW YORK POLICE ACADEMY COLLEGE POINT, NEW YORK INTRODUCTION EXISTING STRUCTURAL SYSTEM PROBLEM STATEMENT PROBLEM SOLUTION THESIS REDESIGN ARCHITECTURAL IMPACT COST AND SCHEDULE IMPACT CONCLUSION PROJECT TEAM OWNER: NEW YORK DEPARTMENT OF CONSTRUCTION AND DESIGN CONSTRUCTION: TURNER CONSTRUCTION ARCHITECT: PERKINS + WILL STRUCTURAL ENGINEER: ROBERT SILMAN ASSOCIATES MEPF ENGINEER: WSP FLACK + KURTZ

  4. PRESENTATION OUTLINE THE EXISTING SYSTEM NEW YORK POLICE ACADEMY COLLEGE POINT, NEW YORK EXISTING FRAMING SYSTEM EXISTING FLOOR SYSTEM EXISTING FOUNDATION INTRODUCTION EXISTING STRUCTURAL SYSTEM PROBLEM STATEMENT PROBLEM SOLUTION THESIS REDESIGN ARCHITECTURAL IMPACT COST AND SCHEDULE IMPACT CONCLUSION 15’ 30’ 30’

  5. PRESENTATION OUTLINE THE EXISTING SYSTEM NEW YORK POLICE ACADEMY COLLEGE POINT, NEW YORK X-FRAME INTRODUCTION EXISTING STRUCTURAL SYSTEM PROBLEM STATEMENT PROBLEM SOLUTION THESIS REDESIGN ARCHITECTURAL IMPACT COST AND SCHEDULE IMPACT CONCLUSION

  6. PRESENTATION OUTLINE THE EXISTING SYSTEM NEW YORK POLICE ACADEMY COLLEGE POINT, NEW YORK Y-FRAME INTRODUCTION EXISTING STRUCTURAL SYSTEM PROBLEM STATEMENT PROBLEM SOLUTION THESIS REDESIGN ARCHITECTURAL IMPACT COST AND SCHEDULE IMPACT CONCLUSION

  7. PRESENTATION OUTLINE THE PROBLEM NEW YORK POLICE ACADEMY COLLEGE POINT, NEW YORK TYPICAL EXISTING MOMENT CONNECTION INTRODUCTION EXISTING STRUCTURAL SYSTEM PROBLEM STATEMENT PROBLEM SOLUTION THESIS REDESIGN ARCHITECTURAL IMPACT COST AND SCHEDULE IMPACT CONCLUSION TYPICAL EXISTING HSS CBF CONNECTION

  8. PRESENTATION OUTLINE THE PROBLEM NEW YORK POLICE ACADEMY COLLEGE POINT, NEW YORK TYPICAL EXISTING MOMENT CONNECTION INTRODUCTION EXISTING STRUCTURAL SYSTEM PROBLEM STATEMENT PROBLEM SOLUTION THESIS REDESIGN ARCHITECTURAL IMPACT COST AND SCHEDULE IMPACT CONCLUSION TYPICAL EXISTING HSS CBF CONNECTION

  9. PRESENTATION OUTLINE THE SOLUTION NEW YORK POLICE ACADEMY COLLEGE POINT, NEW YORK X-FRAME INTRODUCTION EXISTING STRUCTURAL SYSTEM PROBLEM STATEMENT PROBLEM SOLUTION THESIS REDESIGN ARCHITECTURAL IMPACT COST AND SCHEDULE IMPACT CONCLUSION

  10. PRESENTATION OUTLINE THE SOLUTION NEW YORK POLICE ACADEMY COLLEGE POINT, NEW YORK INTRODUCTION EXISTING STRUCTURAL SYSTEM PROBLEM STATEMENT PROBLEM SOLUTION THESIS REDESIGN ARCHITECTURAL IMPACT COST AND SCHEDULE IMPACT CONCLUSION Y-FRAME

  11. PRESENTATION OUTLINE THE SOLUTION NEW YORK POLICE ACADEMY COLLEGE POINT, NEW YORK ARCHITECTURE INTRODUCTION EXISTING STRUCTURAL SYSTEM PROBLEM STATEMENT PROBLEM SOLUTION THESIS REDESIGN ARCHITECTURAL IMPACT COST AND SCHEDULE IMPACT CONCLUSION CONSTRUCTABILITY • MATERIAL COST (SHAPES) • FABRICATION SCHEDULING AND COST • LABOR SCHEDULING AND COST

  12. PRESENTATION OUTLINE THE THESIS REDESIGN NEW YORK POLICE ACADEMY COLLEGE POINT, NEW YORK THESIS X-FRAME INTRODUCTION EXISTING STRUCTURAL SYSTEM PROBLEM STATEMENT PROBLEM SOLUTION THESIS REDESIGN ARCHITECTURAL IMPACT COST AND SCHEDULE IMPACT CONCLUSION THESIS X-FRAME DETAIL CONCENTRICALLY BRACED CONNECTIONS • INCLUDES: • BEAM: W30X99 • COLUMN: W14X370 • BRACE: 2L4X4X½” • GUSSET: ¾”

  13. PRESENTATION OUTLINE THE THESIS REDESIGN NEW YORK POLICE ACADEMY COLLEGE POINT, NEW YORK THESIS X-FRAME INTRODUCTION EXISTING STRUCTURAL SYSTEM PROBLEM STATEMENT PROBLEM SOLUTION THESIS REDESIGN ARCHITECTURAL IMPACT COST AND SCHEDULE IMPACT CONCLUSION THESIS X-FRAME LOAD PATH CONCENTRICALLY BRACED CONNECTIONS

  14. PRESENTATION OUTLINE THE THESIS REDESIGN NEW YORK POLICE ACADEMY COLLEGE POINT, NEW YORK THESIS Y-FRAME INTRODUCTION EXISTING STRUCTURAL SYSTEM PROBLEM STATEMENT PROBLEM SOLUTION THESIS REDESIGN ARCHITECTURAL IMPACT COST AND SCHEDULE IMPACT CONCLUSION THESIS Y-FRAME DETAIL CHEVRON BRACED CONNECTIONS • INCLUDES: • BEAM: W24X76 • STIFFENERS: ¾” • BRACE: W14X82” • GUSSET: ¾”

  15. PRESENTATION OUTLINE THE THESIS REDESIGN NEW YORK POLICE ACADEMY COLLEGE POINT, NEW YORK THESIS Y-FRAME INTRODUCTION EXISTING STRUCTURAL SYSTEM PROBLEM STATEMENT PROBLEM SOLUTION THESIS REDESIGN ARCHITECTURAL IMPACT COST AND SCHEDULE IMPACT CONCLUSION THESIS Y-FRAME DETAIL CHEVRON BRACED LOAD PATH

  16. PRESENTATION OUTLINE THE THESIS REDESIGN NEW YORK POLICE ACADEMY COLLEGE POINT, NEW YORK THESIS Y-FRAME INTRODUCTION EXISTING STRUCTURAL SYSTEM PROBLEM STATEMENT PROBLEM SOLUTION THESIS REDESIGN ARCHITECTURAL IMPACT COST AND SCHEDULE IMPACT CONCLUSION THESIS Y-FRAME DETAIL DIAGONAL BRACED CONNECTIONS • INCLUDES: • BEAM: W24X76 • COLUMN: W14X370 • BRACE: W14X82” • GUSSET: ¾”

  17. PRESENTATION OUTLINE THE THESIS REDESIGN NEW YORK POLICE ACADEMY COLLEGE POINT, NEW YORK THESIS Y-FRAME INTRODUCTION EXISTING STRUCTURAL SYSTEM PROBLEM STATEMENT PROBLEM SOLUTION THESIS REDESIGN ARCHITECTURAL IMPACT COST AND SCHEDULE IMPACT CONCLUSION THESIS Y-FRAME DETAIL DIAGONAL BRACED LOAD PATH

  18. PRESENTATION OUTLINE ARCHITECTURE NEW YORK POLICE ACADEMY COLLEGE POINT, NEW YORK DESIGN INTEGRATION INTRODUCTION EXISTING STRUCTURAL SYSTEM PROBLEM STATEMENT PROBLEM SOLUTION THESIS REDESIGN ARCHITECTURAL IMPACT COST AND SCHEDULE IMPACT CONCLUSION

  19. PRESENTATION OUTLINE ARCHITECTURE NEW YORK POLICE ACADEMY COLLEGE POINT, NEW YORK ORIGINAL NORTH ELEVATION INTRODUCTION EXISTING STRUCTURAL SYSTEM PROBLEM STATEMENT PROBLEM SOLUTION THESIS REDESIGN ARCHITECTURAL IMPACT COST AND SCHEDULE IMPACT CONCLUSION THESIS NORTH ELEVATION

  20. PRESENTATION OUTLINE ARCHITECTURE NEW YORK POLICE ACADEMY COLLEGE POINT, NEW YORK ORIGINAL SOUTH ELEVATION INTRODUCTION EXISTING STRUCTURAL SYSTEM PROBLEM STATEMENT PROBLEM SOLUTION THESIS REDESIGN ARCHITECTURAL IMPACT COST AND SCHEDULE IMPACT CONCLUSION THESIS SOUTH ELEVATION

  21. PRESENTATION OUTLINE ARCHITECTURE NEW YORK POLICE ACADEMY COLLEGE POINT, NEW YORK 3D ELEVATION ORIGINAL DESIGN WINDOW ELEVATION INTRODUCTION EXISTING STRUCTURAL SYSTEM PROBLEM STATEMENT PROBLEM SOLUTION THESIS REDESIGN ARCHITECTURAL IMPACT COST AND SCHEDULE IMPACT CONCLUSION 15’ 30’ THESIS DESIGN WINDOW ELEVATION 15’

  22. PRESENTATION OUTLINE ARCHITECTURE NEW YORK POLICE ACADEMY COLLEGE POINT, NEW YORK 3D ELEVATION INTRODUCTION EXISTING STRUCTURAL SYSTEM PROBLEM STATEMENT PROBLEM SOLUTION THESIS REDESIGN ARCHITECTURAL IMPACT COST AND SCHEDULE IMPACT CONCLUSION

  23. PRESENTATION OUTLINE ARCHITECTURE NEW YORK POLICE ACADEMY COLLEGE POINT, NEW YORK 3D ELEVATION CONSTRUCTABILITY INTRODUCTION EXISTING STRUCTURAL SYSTEM PROBLEM STATEMENT PROBLEM SOLUTION THESIS REDESIGN ARCHITECTURAL IMPACT COST AND SCHEDULE IMPACT CONCLUSION

  24. PRESENTATION OUTLINE COST AND SCHEDULE NEW YORK POLICE ACADEMY COLLEGE POINT, NEW YORK FABRICATION, LABOR AND MATERIAL NEEDS INTRODUCTION EXISTING STRUCTURAL SYSTEM PROBLEM STATEMENT PROBLEM SOLUTION THESIS REDESIGN ARCHITECTURAL IMPACT COST AND SCHEDULE IMPACT CONCLUSION

  25. PRESENTATION OUTLINE COST AND SCHEDULE NEW YORK POLICE ACADEMY COLLEGE POINT, NEW YORK FABRICATION AND LABOR MAN-HOURS INTRODUCTION EXISTING STRUCTURAL SYSTEM PROBLEM STATEMENT PROBLEM SOLUTION THESIS REDESIGN ARCHITECTURAL IMPACT COST AND SCHEDULE IMPACT CONCLUSION

  26. PRESENTATION OUTLINE COST STUDY NEW YORK POLICE ACADEMY COLLEGE POINT, NEW YORK ORIGINAL COST THESIS COST INTRODUCTION EXISTING STRUCTURAL SYSTEM PROBLEM STATEMENT PROBLEM SOLUTION THESIS REDESIGN ARCHITECTURAL IMPACT COST AND SCHEDULE IMPACT CONCLUSION

  27. PRESENTATION OUTLINE COST STUDY NEW YORK POLICE ACADEMY COLLEGE POINT, NEW YORK ORIGINAL COST THESIS COST INTRODUCTION EXISTING STRUCTURAL SYSTEM PROBLEM STATEMENT PROBLEM SOLUTION THESIS REDESIGN ARCHITECTURAL IMPACT COST AND SCHEDULE IMPACT CONCLUSION

  28. PRESENTATION OUTLINE COST AND SCHEDULE NEW YORK POLICE ACADEMY COLLEGE POINT, NEW YORK THESIS REDESIGN TOTAL SYSTEM COST: $827,408.92 LABOR: 1,320 MAN HOURS INTRODUCTION EXISTING STRUCTURAL SYSTEM PROBLEM STATEMENT PROBLEM SOLUTION THESIS REDESIGN ARCHITECTURAL IMPACT COST AND SCHEDULE IMPACT CONCLUSION ORIGINAL DESIGN TOTAL SYSTEM COST: $1,606,325.97 LABOR: 4,116 MAN HOURS

  29. PRESENTATION OUTLINE COST AND SCHEDULE NEW YORK POLICE ACADEMY COLLEGE POINT, NEW YORK INTRODUCTION EXISTING STRUCTURAL SYSTEM PROBLEM STATEMENT PROBLEM SOLUTION THESIS REDESIGN ARCHITECTURAL IMPACT COST AND SCHEDULE IMPACT CONCLUSION THESIS REDESIGN PERCENTAGE OF TIME SAVED: 68% PERCENTAGE OF COST SAVINGS: 48% TOTAL TIME SAVED: 2,796 HOURS TOTAL COST SAVINGS: $778,917.05

  30. PRESENTATION OUTLINE CONCLUSION NEW YORK POLICE ACADEMY COLLEGE POINT, NEW YORK INTRODUCTION EXISTING STRUCTURAL SYSTEM PROBLEM STATEMENT PROBLEM SOLUTION THESIS REDESIGN ARCHITECTURAL IMPACT COST AND SCHEDULE IMPACT CONCLUSION X-FRAME MOMENT CONCENTRICALLY BRACED

  31. PRESENTATION OUTLINE CONCLUSION NEW YORK POLICE ACADEMY COLLEGE POINT, NEW YORK INTRODUCTION EXISTING STRUCTURAL SYSTEM PROBLEM STATEMENT PROBLEM SOLUTION THESIS REDESIGN ARCHITECTURAL IMPACT COST AND SCHEDULE IMPACT CONCLUSION Y-FRAME HSS CONCENTRICALLY BRACED W-SHAPED CHEVRON BRACED

  32. PRESENTATION OUTLINE CONCLUSION NEW YORK POLICE ACADEMY COLLEGE POINT, NEW YORK ORIGINAL NORTH ELEVATION INTRODUCTION EXISTING STRUCTURAL SYSTEM PROBLEM STATEMENT PROBLEM SOLUTION THESIS REDESIGN ARCHITECTURAL IMPACT COST AND SCHEDULE IMPACT CONCLUSION THESIS NORTH ELEVATION

  33. PRESENTATION OUTLINE CONCLUSION NEW YORK POLICE ACADEMY COLLEGE POINT, NEW YORK INTRODUCTION EXISTING STRUCTURAL SYSTEM PROBLEM STATEMENT PROBLEM SOLUTION THESIS REDESIGN ARCHITECTURAL IMPACT COST AND SCHEDULE IMPACT CONCLUSION THESIS REDESIGN TIME PERCENTAGE SAVINGS: 68% COST PERCENTAGE SAVINGS: 48% TIME TOTAL SAVINGS: 2,796 HOURS TOTAL COST SAVINGS: $778,917.05

  34. PRESENTATION OUTLINE NEW YORK POLICE ACADEMY COLLEGE POINT, NEW YORK INTRODUCTION EXISTING STRUCTURAL SYSTEM PROBLEM STATEMENT PROBLEM SOLUTION THESIS REDESIGN ARCHITECTURAL IMPACT COST AND SCHEDULE IMPACT CONCLUSION SPECIAL THANKS TO: QUESTIONS