30 likes | 177 Views
ARA Weekly Status (May 11-May 17) Jiwoo Nam. H- pol simulation results from Peter (ARA Weekly meeting, May 12) NTU-UW Production Meeting (May 16) Part P urchasing @ UMD Going smoothly (optical RX/TX ordered yesterday) Fiber Bulkhead will be added
E N D
ARA Weekly Status (May 11-May 17)Jiwoo Nam • H-pol simulation results from Peter (ARA Weekly meeting, May 12) • NTU-UW Production Meeting (May 16) Part Purchasing@ UMD Going smoothly (optical RX/TX ordered yesterday) Fiber Bulkhead will be added Optical Module Housing Delivery RX Box: Early June, TX Housing: July Need to rearrange of Chiba folks visit Filter PIN Model Number: Compac-RF 100-100x PW distribution board (Optical Module RX/TX) PCB: to be discussed after designed fixed (UH) • Surface Receiver Parts Issue German collaborators stop ARA surface antenna system KU will produce surface antennas Responsibility of other parts: TBD
Surface Team Mechanical Drawing on going Prototyping / Design fix to be done by End of May • Downhole Team Test of Optical Modules LNA Box?
Anechoic chamber relocation (B2) Done Need to Turn on dehumidifier • Move in (Refrigerator/Desk/Mechanical Tools) • Telephone • Lab 913 Some Parts arrangement done Please continue (Devices/Tools/Parts) Lab Cleaning Rule Suggestion - Daily: desk/trash can - Once a week: Vacuum/mop - Once a ¼ year (Full house wiping)