POWER PLANT AND LABORATORY INTERFACE AND DATA MANAGEMENT IN THE ELECTRONIC WORLD. Rebecca Charles – TBE Lynne Perry – TBE Doug Wahl – Exelon. Introduction. Power Plant Perspective – Doug Wahl Laboratory Interface – Rebecca Charles REMP Report Preparation – Lynne Perry.
E N D
POWER PLANT AND LABORATORY INTERFACE AND DATA MANAGEMENT IN THE ELECTRONIC WORLD Rebecca Charles – TBE Lynne Perry – TBE Doug Wahl – Exelon
Introduction • Power Plant Perspective – Doug Wahl • Laboratory Interface – Rebecca Charles • REMP Report Preparation – Lynne Perry
Power Plant Perspective Doug Wahl
REMP Management – PB & LGS • Stations Own their Program • One Individual Responsible for Implementing Both Programs • Administration and Oversight of Vendors • Perform Required Surveillances • Preparation of Annual Report for Station • POC for NRC Inspections and Issues
REMP Management • The Programs Contracted Out • Normandeau Associates, Inc. • Sample Collection • Land Use Census • Teledyne Brown Engineering • Radiological Analyses • Interlaboratory Comparison Program
Program Implementation Goals • 0% Errors • Standardization • Cost Effective
Common Goals • Eliminate Transcription Errors • Eliminate Calculation Errors • Standardize Paperwork • Electronic Transfer of Data
EXELON • Corporation Formed Merger of PECO and CECO • Included the Three AmerGen Plants • TMI, Oyster Creek and Clinton • Standardization of Programs and Processes • Common Procedure Development
LGS, OC, PB & TMI REMPs • Share Expertise Between Sites • Standardization • Similar Sampling Equipment • Common Vendors • Sample Collection • Analytical Services • Issued New REMP Contracts to Vendors
Laboratory Interface Rebecca Charles
Electronic Transfer of Data • New contract required electronic data deliverable • Exelon defined fields and format • Some data was not part of current login • Decision made to transfer all of field data electronically to Teledyne
Developing the Forms • Process took cooperation • Began with Exelon/Normadeau sample collection sheet • Some modifications required • Rules and training for samplers • Data can be updated • Layout cannot be changed • Must use valid values
ELECTRONIC RECEIPT OF DATA • THE PROCESS
DeliverySample Collection/Receipt Sheets • Forms completed by samplers – Excel files • Emailed to Teledyne email – knoxlab@tbe.com or • Posted on password protected ftp site. • Hardcopy sent with samples • Print area only • Serves as chain-of-custody
Loading data to Laboratory Information Management System (LIMS) • Data is parsed • Data can be viewed before loading • Checker program verifies data • Corrections can be made • Loaded to data base
Advantages of Electronic Transfer of Data • No hand entry at login • No transfer errors • Review time reduced at Teledyne laboratory • Time reduced for Exelon review of acknowledgement • Field data included in Electronic Data Deliverable
REMP Report Preparation Lynne Perry
PAST REMP REPORTS • Individual files faxed, mailed or emailed for review • Complete report put together manually • Sent over night for review
THE FIX • Adobe Acrobat • Combined Word, Excel, bitmap images and Power Point files
REMP REPORTS FOR THE 21ST CENTURY • Complete report for 1st draft • Standardized REMP report for Exelon-East
THE REMP REPORT • Lims query to populate tables • Automatic calculation • Elimination of data entry errors
BENEFITS AND SAVINGS • Normandeau • Elimination of calculation errors • Elimination of data entry errors • Reduction of paperwork • Ease of record retention • 50% MAN-HOURS SAVED PER PLANT
EXELON • Complete Report Data Package • Lab Report, COC, TBE Acknowledgement Sheet, Data Calculation Sheets • Immediate Notification Of Missed Limits • Immediate Receipt Of Reports Or Analysis • Standardized REMP Reports • Standardized Data Base • 108 MAN-HOURS SAVED PER PLANT
TELEDYNE BROWN ENGINEERING • 75% time reduction at login • Elimination of login error • 95% time reduction of login review • Immediate delivery of ROAs • 95% reduction of data entry errors in REMP tables • 50% time reduction reviewing REMP tables • Complete REMP draft available in february • 145 MAN-HOURS SAVED PER PLANT