1 / 12

Hounslow Highways PFI & Network 2020

Hounslow Highways PFI & Network 2020. Golden Mile Transport Group 24 October 2012. What transport outcomes do we want to achieve?.

Download Presentation

Hounslow Highways PFI & Network 2020

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Hounslow Highways PFI & Network 2020 Golden Mile Transport Group 24 October 2012

  2. What transport outcomes do we want to achieve? Our approved transport strategy (Local Implementation Plan for Transport 2011-2031) sets out our vision for the transport network over next 20yrs – in line with the Mayor of London’s Transport Strategy. In short.. • Targets for increasing walking, public transport and (particularly) cycling trips. • Targets for improving road safety for all users. • Better streetscapes, smoother traffic flow.

  3. Hounslow Highway’s PFI Programme • £100m investment in carriageway and footway over five years, with duty to maintain for a further 20. • Comprehensive renewal of the footway, carriageway and street lighting. • Opportunities to ‘automatically’ upgrade elements of the network that are non-compliant (e.g. drop kerbs, pinch points etc). • Further opportunity to dovetail asset renewal with more substantial improvement works funded by TfL/s106 etc – reducing disruption and saving money.

  4. Network 2020 Programme Resurfacing & Footway Reconstruction (Hounslow Highways PFI) Network 2020 Improvements/Changes to Street Alignments (LB Hounslow)

  5. Network 2020 – Year 1 (2013) First year will be particularly challenging: • Transition year – Hounslow Highways programme only provided mid-2012 – still subject to minor changes. • Little time to design and secure approval for improvements to streets due for renewal early 2013. • Some designs are already in process, or even approved, but this particular street may not be scheduled for asset renewal for some years.

  6. Current Programme (CW/FW) CW FW

  7. Network 2020 – Year 1 (2013) Consultation (commenced 2011)

  8. Network 2020 Consultation – In Figures 575 individual comments 245 individual sites 64 identified respondents (by email), many more not identified 35 on TfL roads (TLRN) (14%) 38 relating to off-road routes (Greenways) (16%) 37 relating to CSH9 (15%) 135 relating to other sites (55%)

  9. Thoughts on consultation process… • Far more successful than anticipated. • Good to be able to quantify (and portray) extent of feeling about an issue. • ‘Many eyes’ – helped unearth schemes and rationales for improvements which may not have occurred to officers. • Provides further contact with interested parties – not just ‘the usual suspects’. • BUT…Huge challenge to meet aspiration!

  10. 2013/14 Draft Network 2020 Programme (subject to change in line with PFI) Cycle Superhighway 9

  11. hounslownetwork2020.org Mark Frost Senior Transport Planner London Borough of Hounslow 020 8583 5037 mark.frost@hounslow.gov.uk

More Related