1 / 10

GOES-R Ground Segment Project Update

GOES-R Ground Segment Project Update. Vanessa Griffin Project Manager, GOES-R Ground Segment Project. American Meteorological Society Annual Meeting Atlanta, Georgia January 20, 2010. GOES-R Ground Segment Objectives.

sharis
Download Presentation

GOES-R Ground Segment Project Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GOES-R Ground Segment Project Update Vanessa Griffin Project Manager, GOES-R Ground Segment Project American Meteorological Society Annual Meeting Atlanta, Georgia January 20, 2010

  2. GOES-R Ground Segment Objectives • Support the primary mission operations goals to launch and operate the spacecraft • Design, develop, integrate and test the Ground Segment minimizing the GOES-R overall program costs • Minimize the impact to existing users during the transition to GOES-R • Provide cost-effective sustainment and maintenance once transitioned to Government operations • Provide cost-effective and timely solutions to meet evolving Ground Segment requirements • Open standards • Modular, scalable, flexible system design • Industry standard system and software engineering practices • Maintain compatibility with existing and enhanced versions of NOAA institutional systems required to support the GOES-R spacecraft 6.2 GOES-R Ground Segment Project Update American Meteorological Society Annual Meeting

  3. Notional Functional Overview TLM, Raw Data TLM, Raw Data CMD CMD GRB GRB GRB GRB RBU WCDAS NSOF Core Ground Segment Functions Core Ground Segment Functions Core Ground Segment Functions GAS (OSD) GOES-N/P (OSD) Product Users AWIPS (NWS) CLASS (OSD) 6.2 GOES-R Ground Segment Project Update American Meteorological Society Annual Meeting

  4. Core Ground Segment Functions Core Ground Segment Functions RBU WCDAS NSOF Enterprise Management Core Ground Segment Functions Core Ground Segment Functions Mission Management Core Ground Segment Functions Product Generation Product Distribution AWIPS (NWS) GAS (OSD) Product Users CLASS (OSD) 6.2 GOES-R Ground Segment Project Update American Meteorological Society Annual Meeting

  5. Ground Segment Contracts Antenna Contractor (TBD) Core Ground Segment Functions RBU WCDAS NSOF Enterprise Management Mission Management Core GS (Harris) Product Generation Product Distribution AWIPS (NWS) GAS (OSD) GAS (OSD) ESPDS (TBD) Product Users CLASS (OSD) 6.2 GOES-R Ground Segment Project Update American Meteorological Society Annual Meeting

  6. Core GS Contractor: Harris Corporation • Government Communications Systems Division (GCSD), Melbourne, FL • Awarded May 27, 2009 • 10-year, $736M (with options) cost plus award fee contract • Does not include life-cycle operations and maintenance costs occurring after May, 2019 • Optional priced CLINs: Improved latency and refresh rates (Option 1) and additional Level 2+ Products (Option 2) • Subcontractors • Harris IT Services (HITS) • Boeing Mission Operations • Honeywell Technology Solutions Inc. Atmospheric and Environmental Research Inc. (AER) • Applied Research and • Engineering Sciences (ARES) • Carr Astronautics • Wyle Information • Systems LLC 6.2 GOES-R Ground Segment Project Update American Meteorological Society Annual Meeting

  7. Core GS Execution Status • GOES-R and Harris have established a collaborative and effective working environment • Harris facility near GOES-R Program office opens next month Recent technical reviews: • System Requirements Review (SRR): Joint Harris/Government SRR passed with green rating (October 2009). • Integrated Baseline Review (IBR): Government review of Harris concluded proper integration of planned cost and schedule into the contract baseline (November 2009). 6.2 GOES-R Ground Segment Project Update American Meteorological Society Annual Meeting

  8. Affiliated Development Status • Remote Backup • Lease signed • Site preparation to begin June 2010 • Antenna System: • Source selection in progress • Contract award June 2010 Fairmont, WV Wallops, VA • ESPDS/GAS • RFP released • Proposals due 2/1 • Contract award June 2010 6.2 GOES-R Ground Segment Project Update American Meteorological Society Annual Meeting

  9. Project Schedule Upcoming Technical Reviews CA SRR/SDR 6/10 7/10 • User-Oriented Events • Proving Ground: Ongoing • Direct Readout Conference: Dec 2010 (tentative) • GOES Users’ Conference: 2011 • User System Readiness Testing: Planning in work • GRB Emulator: Launch-3 yrs • Data Operations Testing: Post-Release 1 6.2 GOES-R Ground Segment Project Update American Meteorological Society Annual Meeting

  10. Questions? Answers to questions submitted at the GOES Users’ Conference will posted online soon at www.goes-r.gov

More Related