Robin Pfister Deputy Project Manager, GOES-R Ground Segment. GOES Users’ Conference Madison, Wisconsin Tuesday, November 3, 2009. GOES-R Series Operations Concept. GOES-R Series Program Concept of Operations (CONOP) drove high-level requirements development

tex
Download Presentation

Robin Pfister Deputy Project Manager, GOES-R Ground Segment

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Robin PfisterDeputy Project Manager, GOES-R Ground Segment GOES Users’ Conference Madison, Wisconsin Tuesday, November 3, 2009

  2. GOES-R Series Operations Concept • GOES-R Series Program Concept of Operations (CONOP) drove high-level requirements development • Maintain continuity with current GOES Series operations • Raw data receipt, processing to L1b, command and control at Wallops Command and Data Acquisition Station (WCDAS) • Mission operations, product processing and distribution at NOAA Satellite Operations Facility (NSOF) • Support continuity of operations via Remote backup (RBU) site • Provide L1b data to hemispheric users and NSOF via GOES Rebroadcast (GRB) • Support unique payload services (UPS) • High-Rate Information Transmission/Emergency Managers Weather Information Network (HRIT/EMWIN) • Data Collection System (DCS) • Search and Rescue (SARSAT) • Provide low-latency products to key National Weather Service (NWS) users via direct connection to Advanced Weather Information Processing System (AWIPS) • Provide access to all GOES-R Series products via GOES-R Access Subsystem (GAS) • Operational scenarios will be defined by Core Ground Segment (GS) contractor • Operational details will be refined during Mission Operations Support Team (MOST) and Data Operations Support Team (DOST) testing GOES Users' Conference - November 3, 2009

  3. Notional Functional Overview TLM, Raw Data TLM, Raw Data CMD, GRB CMD, GRB GRB: Re-broadcast for users AWIPS: Direct feed to NWS GRB GRB GAS: Terrestrial distribution CLASS: Long-term archive RBU Core Ground Segment Functions NSOF Core Ground Segment Functions WCDAS Core Ground Segment Functions DCS: Bent-pipe service HRIT/EMWIN: Bent-pipe service GAS (OSD) GOES-N/P (OSD) Product Users AWIPS (NWS) CLASS (OSD) GOES Users' Conference - November 3, 2009

  4. Functional Element Overview GOES Users' Conference - November 3, 2009

  5. Government Roles and Responsibilities GOES Users' Conference - November 3, 2009

  6. Contractor Roles and Responsibilities GOES Users' Conference - November 3, 2009

  7. Core GS Contract • Development of Core GS • Mission Management • Enterprise Management • Product Generation • Product Distribution • Internal (i.e., intra-site) telecommunications • Total GS integration and checkout • Integration of affiliated GS developments, including GAS and antennas • Interfaces to external systems, including CLASS and ADRS • Transition to NOAA Operations • DOES NOT include life-cycle operations and maintenance (i.e., FY19-FY29) • Core Contract Options • Option 1: Improved latency and refresh rates • Option 2: Additional Level 2+ Products GOES Users' Conference - November 3, 2009

  8. Core GS Contractor: Harris Corporation • Harris Corporation, Government Communications Systems Division (GCSD), Melbourne, FL was selected as the core (prime) GS contractor on May 27, 2009 • 10-year cost plus award fee contract • Subcontractors • Harris IT Services (HITS) • Boeing Mission Operations • Honeywell Technology Solutions Inc. • Atmospheric and Environmental Research Inc. • Carr Astronautics • Wyle Information Systems LLC • Applied Research and Engineering Sciences (ARES) GOES Users' Conference - November 3, 2009

  9. Core GS Contract Execution Status • The GSP and Harris have established: • Representation on each other’s Integrated Product Teams (IPT) • Bi-weekly executive review (GSP senior staff and Harris project management) • Bi-weekly Integrated Development Team (IDT) tagups for core functional elements • Working-level technical meetings • The GSP and Harris have conducted: • Post-Award Conference (PAC) • System Requirements Review (SRR) • Integrated Baseline Review (IBR) is planned for November 11-20 GOES Users' Conference - November 3, 2009

  10. Affiliated Development Status • Antenna System • RFP released and proposals have been received • ESPDS (impending procurement) • GAS • ADRS • HRIT/EMWIN “Domain-5” • DCS • Telecommunication services – future procurement • CLASS archive and access – Requirements development in progress GOES Users' Conference - November 3, 2009

  11. Project Schedule Schedules are notional until Integrated Baseline Reviews Release MM Prototype Release 1 Equipment Installed Requirements Complete RBU Site Selection RBU Lease PDR CDR IBR PDR IBR CA CDR CA CA PDR CDR SRR CA GRD Release MM Release 2 Install Complete Building Complete Deliverable Development Construction Integration & Test Milestone Completed Milestone Notional Milestone GOES Users' Conference - November 3, 2009

  12. Project Major Milestones GOES Users' Conference - November 3, 2009

  13. Questions?