1 / 10

Status report Slovakia

Status report Slovakia. Stefan Polhorsky, DISC 201 2 , Vukovar-HR, 12.12.2012. Agenda. Important projects by SVP Branch Bratislava DANUBE FLOODRISK CEFrame MORE Dispatching technology (SK-CZ) CBC with HU on Danube NEWADA duo National Flood Hazard and Risk maps production ENC AIS.

sharis
Download Presentation

Status report Slovakia

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status report Slovakia Stefan Polhorsky, DISC 2012, Vukovar-HR, 12.12.2012

  2. Agenda • Important projects by SVP Branch Bratislava • DANUBE FLOODRISK • CEFrame • MORE • Dispatching technology (SK-CZ) • CBC with HU on Danube • NEWADA duo • National Flood Hazard and Risk maps production • ENC • AIS

  3. DANUBE FLOODRISK • Current status: • Project finalized in 10/2012, now final „closing activities“ • SVP hazard and risk maps of Danube

  4. DANUBE FLOODRISK Danube Atlas of Hazard and Risk Maps ready in scale 1:100 000

  5. CEFrame • Mapping on Morava basin – flood extension in case of Q500 • Flood risk assessment and management issues • Project closed in 1Q/2013 • More info on www.ceframe.eu

  6. MORE Revitalization activities on Morava River Dispatching technology (SK-CZ) Implementation of CZ environment in SK (Morava river – pilot) CBC projects on SK-HU Danube DUREFLOOD Project related to the improvement of watergauge network on Danube and main tributaries

  7. NEWADA duo • 10/2012 – 9/2014 • Cooperation in field of: • Water level, shallow sections • ENC depth info • Atlas of berth • Paper charts • FIS portal • PR issues

  8. ENC • IE standard – version 2.1 ready – work on including of RIS-index into the maps (cooperation with SPS) • Availability on web portal D4D & SVP web page

  9. AIS – SK status • Responsibilities • SPS (KIOS – IT service), SVP support • Tracking and Tracing • Regulation harmonized with HU and AT (AIS transponders) • NtS • According to the latest standard • Connection with NEWADA FIS portal • Electronic reporting • WLAN access points

  10. Thank you for your kind attentionstefan.polhorsky@svp.sk

More Related