An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MGNREGA WORKSHOP ON 100% MIS PRESENTED BY: MGNREGA CELL, HOOGHLY

  2. TARGET OF 2011-2012 • 100% MIS achievement. • No manual report return from GP level. MPR will be prepared from the GP database at block level / online MIS reflection on 7th of each month at district level. • Fund allocation on the basis of online expenditure reflection only. • 100% photo uploading of job card holders. • 100% BPL integration. • 100% execution of SMS based monitoring system.

  3. MIS INFRASTRUCTURE AT GP LEVEL • One dedicated computer for MGNREGA. • Computer should be attached to UPS. • One printer, scanner, fax. • One digital camera. • Original antivirus software. • Internet connection (BSNL broadband / wireless internet connectivity). • MGNREGA computer should remain isolated from internet / LAN connectivity.

  4. FLOW OF WORK AT GP LEVEL • Each scheme should be divided into non-overlapped working period. • Supervisor should submit muster roll immediately after completion of each work period. • VLDEE should immediately enter the muster roll after getting it from the supervisor. • Payment advice should be generated from MGNREGA / MIS software only. • No manual advice will be entertained.

  5. FLOW OF WORK AT GP LEVEL • Take incremental backup once in a week and either upload it or send the backup to block immediately without fail. • Don’t forget to take full backup after data entry (but do not upload the full backup, upload incremental backup only). • All incremental and full backup should be archived in a CD / DVD / external HDD to handle all types of database related problems / issue. • Maintain backup register properly. • Released fund from DPC should not be entered at GP level.

  6. Upload Incremental Backup / Send it to Block for Uploading, Preserve the sent copy in a CD Obtain Muster Roll from Supervisor MIS WORK FLOW Enter Muster Rolls in MIS Take Incremental Backup Generate Advice from MIS Cash Book Entry as required

  7. FAQ

  8. FAQ

  9. FAQ

  10. THANK YOU