BEISEL ROAD

BEISEL ROAD. 8/10 mile . SCOPE. SURVEYING ENGINEERING WITH FOCUS ON ENVIRONMENTAL ISSUES AND IMPROVING DRAINAGE IMPROVED DRAINAGE WITH UNIFORMLY SIZED CONCRETE PIPE AND DEFINED DITCHES ROADBED FORTIFIED WITH CONCRETE BASE ASPHALT PAVING. IMPROVED DRAINAGE. FUNDING.

shaun
Download Presentation

BEISEL ROAD

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BEISEL ROAD

  2. 8/10 mile

  3. SCOPE SURVEYING ENGINEERING WITH FOCUS ON ENVIRONMENTAL ISSUES AND IMPROVING DRAINAGE IMPROVED DRAINAGE WITH UNIFORMLY SIZED CONCRETE PIPE AND DEFINED DITCHES ROADBED FORTIFIED WITH CONCRETE BASE ASPHALT PAVING

  4. IMPROVED DRAINAGE

  5. FUNDING • $85,000. – TITLE II FUNDS • $199,000. COUNTY TRANSPORTATION COMMITTEE (CTC) FUNDS • TOTAL PROJECT EXPENDITURES: $212,066.91

  6. Road Marking • 4 inch double yellow line: $1,689.6 • Bi-directional raised pavement markers: $1,100. • Total amount requested: $2789.6

  7. THANK YOU!