Contents • Opening • Approval of the agenda • Minutes of the last meeting • Summary of fulfilled work amounts and costs • Revision of the research plan • Contract status • Summary of CWC’s new UWB activities • Other business • Next meeting • Closing CUBS, the 2nd steering group meeting
Minutes of the last meeting • Kick-off: January 27, 2004, 9.15-12.00 • Open items: • update to research plan • done • PHY-simulator has been offered to IEEE802.15 • no interests anymore • biased to multiband approach • no expected simulator release CUBS, the 2nd steering group meeting
Summary of fulfilled work amounts and costs • Work amount from April (4.53 mm) CUBS, the 2nd steering group meeting
Work: 1.1. – 30.4.2004 CUBS, the 2nd steering group meeting
Cum. work: 1.1. – 30.4.2004 CUBS, the 2nd steering group meeting
Results from the first third • WP1: Multiband UWB • literature survey has been started • WP2: Singleband UWB • office (Tietotalo) • channel models ready • outdoors (Riihimäki) • channel models ready • link level simulations almost ready • industry (Stora Enso) • data analysis has not been started yet • multiband interference + MAI simulations in SV-channel • first results available CUBS, the 2nd steering group meeting
WP3: Sensor networks • Niina’s work gives the first estimates for PHY to be used • Energy efficient channel codes for sensor networks • WP4: Co-existence • UWB impact on WCDMA and GSM have been measured in co-operation with PULSERS-project • UMTS • GSM900, GSM1800 • WP5: Capacity • work has been started • analytical work will be done in Finnish Academy project (CASWI) • results will be reported to CUBS CUBS, the 2nd steering group meeting
WP6: Channel measurements • summer trainee has joined the project • modification to the measurement system • VNA -> SPA in long range freq. domain sounder • proposal to Oulu University Hospital has been sent • first response was optimistic • on May 25, JI and MH will visit the hospital presenting our ideas and sounding systems • outdoors • first discussions with Heikki CUBS, the 2nd steering group meeting
Costs from 1.1. – 30.4.2004 CUBS, the 2nd steering group meeting
Outputs • Licentiate thesis accepted May 5, 2004 (Raffaello) • two M.Sc. thesis will be finished at June 2004 (Lassi, Niina) • one paper accepted to IWWAN • H. Karvonen, Z. Shelby ja C. Pomalaza-Raez: Coding for Energy Efficient Wireless Embedded Networks • three papers have been submitted to NRS • H. Karvonen, C. Pomalaza-Raez: Coding for Energy Efficient Multihop Wireless Sensor Networks • N. Laine, M. Hämäläinen, L. Hentilä, J. Iinatti, M. Nenonen, S. Karhu: Outdoor Ultra wideband radio channel modeling at VHF/UHF band • L. Hentilä, V. Hovinen, M. Hämäläinen: Sub-band analysis in UWB channel modeling • two papers will be presented in IWUWBS&UWBST next week (from FUBS) • M. Hämäläinen, R. Tesi, J. Iinatti: UWB Co-Existence with IEEE802.11a and UMTS in Modified Saleh-Valenzuela Channel • R. Tesi, M. Hämäläinen, J. Iinatti, I. Oppermann, V. Hovinen: On the Multi-User Interference Study for Ultra Wideband Communication Systems in AWGN and Modified Saleh-Valenzuela Channel CUBS, the 2nd steering group meeting
Work deviation • Work amount in WP2 has been exceeded • analysis of industrial channel data not started • PHY simulations using own channel models are needed • Reaction: • WP1: MB-OFDM (13) • 3 mm -> WP2 • WP4: co-existence (7) • measurement work with EU-projects • 1 mm -> WP2 • WP5: capacity (5) • analytical work to be done in CASWI • 2 mm -> WP2 Increase 6 mm to WP2: 11 -> 17 mm CUBS, the 2nd steering group meeting
Revision of the research plan • Updated plan • has been accepted via email discussion • commenting time ends at Feb 11, 2004 • no arguments against the updates were presented • has been available at CUBS web-page since Feb 11, 2004 • WP6: Channel modelling added to the plan, amount 6 mm. • hospital • request to hospital has been sent • supplementary outdoor measurements. • discussion started with Heikki • summer trainee available (May – Aug) CUBS, the 2nd steering group meeting
Contract status • Comments from Elektrobit has been taken into account • UO has reviewed the comments • contract draft is updated and it is available at the CUBS web-page CUBS, the 2nd steering group meeting
Summary of CWC’s new UWB activities • UWB-hospital (UHo) – application submitted • Tekes FINWELL-program • feasibility study: UWB in hospital • sponsor: Innocas Medical • WIreLess Technology in Hospital Operation management (WILHO) – application submitted • Tekes FINWELL-program • UWB in hospital • sponsors: Innocas Medical, Oulun diakonissalaitos, Ekahau, Yomi, Pfizer • Multi Mode Match Analysis (M3A) – application submitted • Tekes Phoenix-program • sponsors: Nokia, Polar Elektro • co-operation: Media Team, Kilpa- ja huippu-urheilun keskus CUBS, the 2nd steering group meeting
Other business • Next meeting • TSG: June 9 • SGM: CUBS, the 2nd steering group meeting