1 / 9

Installation Restoration Program Status John Moran Teledyne Solutions, Inc

Installation Restoration Program Status John Moran Teledyne Solutions, Inc. Purpose. To Provide an update on the Ft. Greely Installation Restoration Program (IRP) since the September 2003 meeting to include: FY 2004 schedule Current Status FY 2004 restoration work completed and planned

shawn
Download Presentation

Installation Restoration Program Status John Moran Teledyne Solutions, Inc

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Installation Restoration Program Status John Moran Teledyne Solutions, Inc

  2. Purpose • To Provide an update on the Ft. Greely Installation Restoration Program (IRP) • since the September 2003 meeting to include: • FY 2004 schedule • Current Status • FY 2004 restoration work completed and planned • Introduction to the environmental Fact Sheets for 132 sites

  3. FY 2004 Schedule

  4. Breakdown of Environmental Sites

  5. 2003 Environmental Restoration Activities (Since September 2003 Meeting) • Installation Restoration Program (IRP) • Installed 2 new monitoring wells southeast of airfield • Site Investigation of South Tank Farm at the CONOL Pipeline Pump Station • Confirmation sampling performed for TCE in groundwater • Installation Compliance Program • Site Investigation of tank farm at BLDG 617; Investigation report not complete • Installed 2 new monitoring wells at tank farm

  6. 2004 Environmental Restoration Activities • Installation Restoration Program • Remedial Investigation/Feasibility Study (RI/FS) to be performed at 2 sites • RI/FS of Landfills 4 & 5 and Fire Training Areas (BRAC Parcel 85) • Confirmation sampling for new monitoring wells • Installation Compliance Program • Complete Site Investigation of tank farm at BLDG 617 • Monitor groundwater • Initiate preliminary investigations at 14 locations • Conduct inventory of dry (injection) wells and research closure requirements

  7. Environmental Fact Sheets • Background • AK District of Corps of Engineers developed 132 fact sheets from list of 148 sites • 8 sites transferred to Fort Wainwright • 8 sites were duplicate sites with different names • Current Status • Additional research conducted by SMDC and fact sheets were updated • Fact sheets sent to ADEC (Greg Light) for review 9 Jan 04 • Fact Sheets are posted on the RAB website(http://www.smdcen.us/rabfga) • Paper copy of the fact sheets available

  8. Sites Transferred to Fort Wainwright • Texas Complex • North Delta Tank Farm (possible transfer to FUDS) • Gerstle River Fueling Area • Gerstle River Test Site • Midas Site • Former Sewage Lagoon • PRTC Range 13 • IMPAC Range 3

  9. Duplicate Sites • UST #399 addressed under BRAC 118 (Undeveloped Area UST) • BLDG 640 Tank #445 addressed under BRAC 82 (Air Curtain Incinerator) • Hazardous Waste Accumulation Area addressed under BRAC 92 (BLDG 100 Drum Storage) • Concrete Herbicide Mixing Pad addressed under BRAC 63 (BLDG 348) • UST Containing Waste Oil addressed under BRAC 77 (BLDG 340 Used Oil Tank) • Dilution Well addressed under BRAC 90 (Nuclear Waste Pipeline, East) • “UST Sites” will be addressed in separate fact sheets • “Fort Greely, Alaska Environmental Sites” are addressed individually