AB-PO-PH ( P ulsed and H igh voltage converters ) Le point sur les activités de la section. AB-PO-PH – 30.05.2006. J.P. Royer AB-PO-PH. AB-PO-PH ( P ulsed and H igh voltage converters ) Team 2006. 1 January 2006. 1 June 2006. CRAVERO Jean-Marc DAVID Nicolas
E N D
AB-PO-PH (Pulsed and High voltage converters )Le point sur les activités de la section AB-PO-PH – 30.05.2006 J.P. Royer AB-PO-PH
AB-PO-PH (Pulsed and High voltage converters )Team 2006 1 January 2006 1 June 2006 • CRAVERO Jean-Marc • DAVID Nicolas • De ALMEIDA MARTINS Carlos • JOFFE Stéphane • LAHAYE Joël • MATHIEU David • PARRA-LOPEZ Julien • SIMONET Gilles • ROYER Jean-Pierre Section Leader • CRAVERO Jean-Marc • DAVID Nicolas • JOFFE Stéphane • LAHAYE Joël • MATHIEU David • PARRA-LOPEZ Julien • ROYER Jean-Pierre • SIMONET Gilles • De ALMEIDA MARTINS Carlos Section Leader “transition douce” : For Carlos knowledge different equipments, team and start-up converters in the complex PS under responsibility PO-PH. AB-PO-PH - 12.01.2006 J.P. Royer AB-PO-PH
AB-PO-PH 2006-2008Pulsed and High voltage converters • PS complex exploitation: active maintenance (documentation, improvement, spare), follow-up operation, physicist requirements • I-LHC project: Pulsed, high voltage and commercial converters e-cooling, PS installation, commissioning, physicist requirements. • ISOLDE: New installation and follow-up the requirements • REX-ISOLDE: Power converters integration, interface PO/CO. • CNGS: Power converters (horn and reflector), commissioning. • CONSOLIDATION: power converters: PS (gamma-transition), Linac (dipoles, quadripoles , HT RF), PSB dipoles transfer • Stand test 3MeV( Linac 4): Follow-up requirement, CAT collaboration, installation stand test 3MeV. • Multiturn ejection: new lay-out bump 16 • Dump PS: section 47, 48. CTF3: power converter source laser. Responsibilities: AB-PO-PH - 12.01.2006 J.P. Royer AB-PO-PH
AB-PO-PH (Pulsed and High voltage converters )Team June 2006 • CRAVERO Jean-Marc • DAVID Nicolas • JOFFE Stéphane • LAHAYE Joël • MATHIEU David • PARRA-LOPEZ Julien • ROYER Jean-Pierre • SIMONET Gilles • De ALMEIDA MARTINS Carlos Section Leader “transition douce” : knowledge different equipments, team and start-up converters in the complex PS under responsibility PO-PH. Necessity to see all the different equipments AB-PO-PH – 30.05.2006 J.P. Royer AB-PO-PH
AB-PO-PH 2006-2008Pulsed and High voltage converters • Exploitation, Operation, active maintenance (documentation, improvement, spare), follow-up operation, physicians requirements. • 2006: Linac2 ( protons), PSB (Booster), PS, ISOLDE, REX-ISOLDE, AD, LEIR, CTF3. (New start for PS and AD) • 2006: I-LHC commissioning • 2006: CNGS commissioning (horn and reflector) AB-PO-PH – 30.05.2006 J.P. Royer AB-PO-PH
AB-PO-PH 2006-2008Pulsed and High voltage converters • Exploitation, Operation, follow-up operation, physicians requirements. • Piquet follow-up, 3 persons PO-PH in the piquet team N. David, S. Joffe, J. Parra-Lopez • Coordinator machine, 5 persons PO-PH J.M Cravero LEAR N. David REX-ISOLDE S. Joffe LINAC 2, 3 J. Parra-Lopez ISOLDE G. Simonet AD AB-PO-PH – 30.05.2006 J.P. Royer AB-PO-PH
AB-PO-PH 2006-2008Pulsed and High voltage converters • I-LHC ( linac3, LEIR,PS): Pulsed, high voltage and commercial power converters. 2006 installation and commissioning. • Pulsed dipoles5 HZ (14) , commissioning now (linac 3) • Pulsed quadripoles 5HZ (11), commissioning now (linac 3) • HV electron cooling and RF (19) -IT 3225 AB-LHC- (FUG) • HV RF power converters LEIR (2)- IT 3257 AB-LHC- (OCEM) • Commercial power converters 1Q (30) -PE 21785/AB- (Delta) • Commercial power converters 4Q (90)-IT 3262 AB- (Danfysik) • 2006:Pulsed septum ejection power converter (~ 40 kA, 2kV) • 2006:Pulsed septum injection PS, septum 26 (~20 kA, 2kV) • 2006:Power converter bump 26 PS (30A, 500V, 5msec) AB-PO-PH – 30.05.2006 J.P. Royer AB-PO-PH
AB-PO-PH 2006-2008Pulsed and High voltage converters • I-LHC ( linac3, LEIR,PS): Pulsed, high voltage and commercial power converters. 2006 installation and commissioning. • 2006:Pulsed septum injection PS, septum 26 (~20 kA, 2kV) • 2006:Power converter bump 26 PS (30A, 500V, 5msec) • Problems transformer HT on the RF (7,5 kV, 25A) ?? • Test electronic spare SMH 40 • In general, documentation AB-PO-PH – 30.05.2006 J.P. Royer AB-PO-PH
AB-PO-PH 2006-2008Pulsed and High voltage converters I-LHC project AB-PO-PH - 12.01.2006 J.P. Royer AB-PO-PH
AB-PO-PH 2006-2008Pulsed and High voltage converters Injection PS SMH 26 Ejection LEIR SMH 40 Septa Strip-line (LEIR, PS, PSB) spare, documentation AB-PO-PH – 30.05.2006 J.P. Royer AB-PO-PH
AB-PO-PH 2006-2008 Pulsed and High voltage converters ISOLDE: New installation in Isolde class A Lab (bat.179), Balzers Lab. (bat.26), RFQc (bat 275) 2006 : Installation before mars 2006 (see functional specification EDMS 585297) installation Balzers lab, pumpstand 3 Station Degazage OFF line separator foreseen PLC AB-CO AB-PO RFQc in line (2007) AB-PO-PH – 30.05.2006 J.P. Royer AB-PO-PH
AB-PO-PH 2006Pulsed and High voltage converters • REX-ISOLDE integration AB • ~ 146 power converters, 34 different types. • Rationalisation control-interface CO-PO, (first part Nov 2005-Mars 2006) • Regroupement et augmentation de la charge des faisceaux d’ions radioactifs en combinant TRAP et EBIS afin d’obtenir des faisceaux plus lourds (n+ q) AB-PO-PH - 12.01.2006 J.P. Royer AB-PO-PH
AB-PO-PH 2006-2008Pulsed and High voltage converters PARTIAL LAY-OUT REX-ISOLDE ( 2006 ) AB-PO-PH - 12.01.2006 J.P. Royer AB-PO-PH
AB-PO-PH 2006Pulsed and High voltage converters • REX-ISOLDE integration AB • Operation Fully support by PO-PH ( no piquet) • New lay-out control in progress ( with PLC Simatic, but responsibility samplers problem) • Studies isolating transformer to replace rotative machine • Physicist requirements (platform EBIS, Bouhnik etc..) • Project HIE functional specification AB-PO-PH – 30.05.2006 J.P. Royer AB-PO-PH
AB-PO-PH 2006-2008Pulsed and High voltage converters • CNGS: power converters (horn and reflector); collaboration department PH. • 2006 Full operation and exploitation responsibility after commissioning • Electronic PO for the pulsed power converters horn and reflector. • Control interface 1553 and timing TG8 (CO). • Adaptation timing, internal software. • Adaptation hardware • Power converters BA4, dry run and commissioning in progress • Power converter test in BA7 • 2007-2008 Full responsibility of the 2 power converters. AB-PO-PH – 30.05.2006 J.P. Royer AB-PO-PH
AB-PO-PH 2006-2008Pulsed and High voltage converters 4th NBI, 7 - 11 November 2003 courtesy Gilles MAIRE AB-PO-PH – 30.05.2006 J.P. Royer AB-PO-PH
AB-PO-PH 2006-2008Pulsed and High voltage converters • Consolidation: • Pulsed power converter for PS gamma-transition 3 power converters triplets in progress 1 prototype Doublets foreseen autumn 2006 decision after functional specification • Pulsed power converters for dipoles (15) Linac2(minidiscap) (15 linac2 et 10 PSB installed Jan.2006) material ordered • Pulsed power converters for quad new proto (2006) for large series (80) Linac 2 (2007-2008) (maxidiscap) prototype and market survey in progress AB-PO-PH – 30.05.2006 J.P. Royer AB-PO-PH
AB-PO-PH 2006-2008Pulsed and High voltage converters • Consolidation: PS gamma-transition Doublets: 1000A/-1000A in 0.7 ms, T pulse 60 ms Triplets: 500A in 54 ms linear part, T pulse 94 ms AB-PO-PH - 12.01.2006 J.P. Royer AB-PO-PH
AB-PO-PH 2006-2008Pulsed and High voltage converters • Stand test 3 MeV: follow-up Linac4 (approval end 2006?) • Beam test 3 MeV beginning 2007 ? • Quad power converters (11), dipole power converters (2) • High power converters HT RF (2) collaboration CAT (12 power converters for Linac 4.) New requirement Source H-: 2 solenoids 1200A pulsed flat-top 800 microsec., 6 powers converters dipoles 8A DC, 1 bending measure 50A 35V. ( not confirmed) AB-PO-PH – 30.05.2006 J.P. Royer AB-PO-PH
AB-PO-PH 2006-2008Pulsed and High voltage converters HT POWER CONVERTER KLYSTRON100kV-20A- 800mirosec. • Prototype at CERN (Budget available) Studies ( power, electronic) in progress Call for tender in progress for power converters Test area ? • CAT: Collaboration in discussion Technical point and legal aspect in discussion AB-PO-PH – 30.05.2006 J.P. Royer AB-PO-PH
AB-PO-PH 2006-2008Pulsed and High voltage converters • Multiturn Ejection: reorganisation of the pulsed power converters for ejection 16.(Bump 16, etc..) foreseen start 2007 Proposed converter layout: new layout of the PS slow bump 16 Power converters specifications for the new bump16 for multi-turn extraction Budget: 235 kCHF 1 man/year (if QKE 58 not used as spare) AB-PO-PH – 30.05.2006 J.P. Royer AB-PO-PH
AB-PO-PH 2006-2008Pulsed and High voltage converters • Dump PS section 47 and 48 Studies in progress (35V 45A), installation for star-up 2006 (bat 365). DONE • CTF3: power converter for laser system photo-injector 2007 ? 2008 ? NO WORK AB-PO-PH – 30.05.2006 J.P. Royer AB-PO-PH
AB-PO-PH 2006-2008Pulsed and High voltage converters CONCERNS: • PLC:ecooling LEIR, ISOLDE, REX-ISOLDE PO-CC team AB-COAB-PO • New responsibility ? Responsibility Converters HT RF LHC Responsibility Converters HT RF PS (inverpower) Analysis HT power converters RF (divers type) • Future (stand test 3MeV, Linac4) Power converter HT for modulator, collaboration CAT Test necessary for the future (Linac 4) activity HT to be developed 2006 post engineer HT board 2: 6 june • E-cooling de AD New responsibility, Material obsolete, proposals to be done AB-PO-PH - 12.01.2006 J.P. Royer AB-PO-PH
AB-PO-PH 2006-2008Pulsed and High voltage converters SECURITY Aspect important in this team: - Pulsed capacitors charged, high stored energy. - High Voltage absolute respect of security rules. - BT AB-PO Review 30.05.2006 J.P. Royer AB-PO-PH