60 likes | 226 Views
Engineering & Part Quality Management. October 2011. Organization Chart. Technical & Engineering Deputy. Main Activities. Preparation Inspection Plans. Parts Inspection in Suppliers Site. Auditing the Suppliers’ Quality Grade Improve the Quality Grade of Suppliers.
E N D
Engineering & Part Quality Management October 2011
Organization Chart Technical & Engineering Deputy
Main Activities • Preparation Inspection • Plans. • Parts Inspection in • Suppliers Site. • Auditing the Suppliers’ • Quality Grade • Improve the Quality Grade • of Suppliers. • Processing on IKCO. • Production BOM. • Follow-up the Engineering • Changes. • Make the EPC(Electronic • Part Catalogue)Up-to-date. • Follow-up the new Car • Projects(e.g. Rana) • Creating Parts Test Plan. • Execution of Sample Parts Test. • Creating of ISACO Marking • on Parts. • Looking for New Test • Laboratories. • Quality Inspection at Isaco • Receiving area. • Preparing The QIR(Quality • incident report). • Pre-Distribution Inspection for • Export Parts. • Frequent auditing of ISACO • Warehouses. • Validation of Spare Part Claims. • Quality Control of Packing • Process.
Input Flow • Engineering & Part Quality Manager Product BOM + Engineering Changes + Assembly Man. IKCO Suppliers Ikco System Information of Parts + Tracking + Statistical Documents (PPAP ..) Spare Parts BOM+ Part’s Spec. + Suppliers Spec. + Inspection Plan + Quality Cert. SAPCO SAPCO System PEUGEOT / RENAULT / SUZUKI Spare Part Catalogue + the Result of QIR Related System DEALER Feed back of part qualities + Part’s Claim Dealer’s System
Output Flow • Engineering & Part Quality Manager Suppliers QIR Reports IKCO Dwg. + TP. & IP. + Corrective actions QIR Reports SAPCO QIR Reports Parts’ Spec. + Quality Grade of Supplier + Part’s Claim PEUGEOT Commercial Dept. EPC System+ Technical Flash Info. DEALER