1 / 24

The South Pacific Sea Level and Climate Monitoring Project (SPSLCMP) Developing into the future

The South Pacific Sea Level and Climate Monitoring Project (SPSLCMP) Developing into the future. Geoff Crane Australian Tsunami Warning System Development Team Bureau of Meteorology Melbourne/Brisbane. Geoff Crane Meteorologist Australian Bureau of Meteorology

sheba
Download Presentation

The South Pacific Sea Level and Climate Monitoring Project (SPSLCMP) Developing into the future

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The South Pacific Sea Level and Climate Monitoring Project (SPSLCMP) Developing into the future Geoff Crane Australian Tsunami Warning System Development Team Bureau of Meteorology Melbourne/Brisbane

  2. Geoff Crane Meteorologist Australian Bureau of Meteorology National Manager Tsunami Warning Services – now Ocean Services Section Weather and Ocean Services Branch Australian Bureau of Meteorology Warning Systems Specialist – ATWS Project 2005-2010 Regional Director NSW 2004-2005 Deputy Regional Director Qld 1989-2003 Head – Brisbane TCWC 1977-1989 WMO consultant – established RA V TCC SP 1984-1986

  3. Chair of WG 5 (Warning Systems) (2005-2010) UNESCO IOC ICG/IOTWS IOC Intergovernmental Oceanographic Commission ICG Intergovernmental Coordination Group IOTWS Indian Ocean Tsunami Warning and Mitigation System WG 1 Seismology WG 2 Sea level monitoring WG 3 Risk assessment WG 4 Tsunami scenario modelling WG 5 Tsunami Warning Systems WG 6 Outreach – public education and awareness

  4. SPSLCMP Australian Government intends to continue the SPSLCMP - details being discussed. Phase 4 formally ends 31 December 2010 but likely to be extended depending on progress on formulating Phase 5. Phase 5 is likely to resemble the sea level monitoring and related data/tidal services provided by Phase 4.

  5. It is expected that some synergies would be sought with other regional projects funded by AusAID, e.g. Pacific Island Climate Prediction Project (PI-CPP) but that would be unlikely to impact ongoing network operations and derived services. A regional stakeholders meeting, involving RMSDs and probably Lands & Survey people, will be held as part of the Phase 5 planning. Dates not certain although possibly 8-10 November.

  6. The refurbishment of the sea level observing network (12+1 stations) is committed and funded and is progressing. Will be implemented over the next 2 years. The additional station (Suva) is to be designated as a training site for the project and provide ongoing maintenance skill building in the region in the longer term. /\ / \ \ / \/

  7. T S U N A M I Development of Tsunami Warningsfor Australia and the Indian Ocean Geoff Crane National Manager Tsunami Warning Services Australian Bureau of Meteorology Melbourne / Brisbane

  8. Synergies between the ATWS Project and the SPSLCMP Replacement of some sea level monitoring stations and a few additional stations Installation of real time communications Further improvement to comms required within the next 12 months – change to frequencies Installation of tsunameter network

  9. Sea level monitoring stations – 42 operating, 1 not operating (Port Stanvac, SA)

  10. DEEP OCEAN TSUNAMETERS - 2 in IO, 2 in Coral Sea, 2 in Tasman Sea, 1 demo

  11. Tsunameters Leading edge technology. Very sensitive sensors – detect 2cm change in 5km depth. Operate in harsh environment. Extraordinary challenge to keep the network operating. Provide very good signal of the tsunami but require expert interpretation. They are part of an integrated system and augment info from other sources. Recent critical report in US press about unreliability.

  12. X X X X X X Non-op on 14-10-2010 Others - all unserviceable X

  13. Raleigh waves (seismic) Positive tsunami arrived maybe a few minutes before predicted arrival time 0.12 m crest to trough 0.06 m amplitude 0523 UTC

  14. 1km Transmitted energy Reflected energy 5km How to use Tsunameter information Cannot translate directly to a coastal amplitude Must compare with model scenario amplitude at the tsunameter site to determine tsunamigenic efficiency Then modify model scenario predictions along the coast Why can’t we simply use Green’s Law to determine coastal amplitude? Assumes uniform very gentle slope so no reflected energy. Need to consider effects of Continental Shelf.

  15. 2 The earthquakeIncreasing stress causes the plate boundary to rupture and the upper plate to rebound to its initial unflexed position, displacing the sea surface both up and down. 3 10 minutes afterthe earthquakeThe displaced sea surface propagates outward left as a positive tsunami (leading crest) and right as a negative tsunami (leading trough). +ve Leading crest - ve Leading trough 1 Prior to the earthquakeThe lower (subducting) plate drags down against the upper (over-riding) plate, causing it to bend down at the toe and to flex upwards further along. from: „Surviving a tsunami“,U.S. Geological Survey, 1999

  16. Sea way out The IOT Mag 9.2 Dec 2004

  17. The IOT Mag 9.2 Dec 2004 Sea right in

  18. Scenario for Macran Trench event Mw 9.0

  19. Scenario for Sumatra Trench event Mw 8.5

  20. The Chile Tsunami 27 Feb 2010 Mag 8.8 Main focus was to the NW

  21. Geoff Crane Bureau of Meteorology Melbourne/Brisbane

More Related