Assumptions for 2005/2006 Objective Capability Determination NEPOOL PSPC Dec. 20, 2004
Needs PSPC Discussion Covered in Presentation Assumptions List Power Supply Planning Committee
Objective Capability Assumptions • Capacity • Existing capacity will be equal to those assets and ratings noted in 2005 CELT Report • Capacity additions based on ISO-NE recommended units and PSPC discussions • Ridgewood Generation (8.4 MW) • Berkshire Wind (15 MW) – For PSPC discussion • Kendall ST 3 and CT Reactivation – For PSPC discussion • Capacity attrition to include those with RC approved 18.4 applications for deactivation or retirement Power Supply Planning Committee
Objective Capability Assumptions • OP-4 Actions 9 and 10 • Total of 45 MW • Verified with Operations that capacity is not enrolled in ISO-NE Demand Response Program Power Supply Planning Committee
Objective Capability Assumptions • Minimum Operating Reserve • OP-4 Action 12 • Modeled in Westinghouse as –200 MW • Verified with Operations (???) Power Supply Planning Committee
Objective Capability Assumptions • Load Forecast • 2005/2006 load forecast input into the Reliability Model will be consistent with the 2005 CELT Forecast Power Supply Planning Committee
Objective Capability Assumptions • Unit Availability Options • 5-year Average Using EFOR • Using EFORd values • “Adjusted” EFOR values for months with missing data • NERC Class Average EFORd values for months with missing data Power Supply Planning Committee
Objective Capability Assumptions • Preliminary Data (Jan-00 through Oct-04) • Pre-SMD EFORd data assumes NERC class average • Summer MW per Dec-04 SCC Report Power Supply Planning Committee
Objective Capability Assumptions • ISO-NE Demand Response Program - Recommended Assumptions • Only reliability programs used in determination • Real-Time 30-Minute Demand Response • Real-Time 2-Hour Demand Response • Real-Time Profiled Response • Assets enrolled and ready to respond as of Jan. 1, 2005 will be included Power Supply Planning Committee
Objective Capability Assumptions • ISO-NE Demand Response Program • EFOR modeling of assets based on results of August 20, 2004 performance audit • EFOR = 1 – (Interruption MW / Total Enrolled MW) Power Supply Planning Committee
Objective Capability Assumptions • ISO-NE Demand Response Program Power Supply Planning Committee
Demand Response(as of November 30, 2004) * SWCT assets are included in CT values and are not included in Total Power Supply Planning Committee
Objective Capability Assumptions • 5% Voltage Reduction amount to be used in OC determination • For further PSPC discussion Power Supply Planning Committee
Objective Capability Assumptions • Tie Benefits • For further PSPC discussion Power Supply Planning Committee