1 / 9

90 Signals Unit

90 Signals Unit. Well-motivated, air-minded personnel that are flexible, professionally competent, correctly equipped, appropriately trained and READY. delivering Expeditionary Information Services Whenever and Wherever they are required. Prepared by 90SU HQ – 7 Nov 07.

shelly
Download Presentation

90 Signals Unit

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 90 Signals Unit Well-motivated, air-minded personnel that are flexible, professionally competent, correctly equipped, appropriately trained and READY delivering Expeditionary Information Services Whenever and Wherever they are required Prepared by 90SU HQ – 7 Nov 07

  2. Formed Unit Movement & Assignment Families Move (Expected)

  3. Assignment Guide

  4. Qtr & Admin at LEEProcess • PStat 1-2 (Personnel entitled to SFA) who wish to be quartered and administered from LEE outwith Assignment or Phased Moves dates may apply using the attached process • Before applying personnel must ensure they are content with the implications wrt married unaccompanied eligibility criteria and allowances

  5. Tech Accommodation • Permanent: • 1 (ERA) and 5 (IS) Sqn in final locations in Bldg 153 and 269 • New Build (TCW and some FGW) - Completion Spring 09 • Eastern HAS Site (OEC Sqn) - Completion Oct 08 • Various minor Bldgs at LEE (GSE/MTMS etc) • Until new accn ready, the unit will use existing infrastructure at LEE: • The majority of the main force will temporarily occupy the Northern HAS (Buildings and HAS) site currently occupied by the departing XXV(F) Sqn.

  6. Eastern HAS Site (OEC Sqn) – Soft and HAS 2, 3, 8, 9, 10, 300, 317, 324, 325, 325a SLA SLAM Bld SFA New Build 1 (ERA) and 5 Sqn Northern HAS Site (2, 3,4 Sqn and ESS Plug Up Site) - HAS 15, 16, 17, 18, 19 MT Parking Temporary Permanent Storage

  7. Domestic Accommodation • Service Families Accommodation: • No predicted shortfall, so intent to house all 90SU personnel at RAF Leeming. • If overspill required DE will allocate SFA in the region South of LEE (e.g Linton On Ouse). • Single Living Accommodation: • Until SLAM delivers in Nov/Dec 08, SLA at LEE, Deverell Barracks (Ripon) and LIN will be used • Junior Rank SLAM Bldg works have started

  8. Next Steps • Accommodation choices and intentions: • Complete preferences • Allocation process (fair and equitable) • Moving my family, schooling, doctors, dentists etc • Moving my Kit • More information and where: • 90SU Web and FAQs (http://www.90su.raf.r.mil.uk/live/default.htm under Op Tab) • Noticeboards • Team Briefs – Every month from Jan 08 • Families/Welfare Internet Site (www.90SU.com) • Families Liaison Assistant

  9. 90 Signals Unit Well-motivated, air-minded personnel that are flexible, professionally competent, correctly equipped, appropriately trained and READY delivering Expeditionary Information Services Whenever and Wherever they are required

More Related