1 / 48

TOPOFF-2

T2 CENTRAL STAFF. TOPOFF-2. INTEGRATED PLANNING. CITY OF SEATTLE. TOPOFF-2 INTEGRATED PLANNING Presented by. Sergeant Debra Jelcick Jim Papineau AMTI. Battalion Chief Randy Hansen D’Arcy Morgan DHS / ODP. Everyone’s Input is Necessary. Private Public Local Regional State

sherwood
Download Presentation

TOPOFF-2

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. T2 CENTRAL STAFF TOPOFF-2 INTEGRATED PLANNING City of Seattle TOPOFF-2 Central Planning Staff

  2. CITY OF SEATTLE TOPOFF-2 INTEGRATED PLANNING Presented by Sergeant Debra Jelcick Jim Papineau AMTI Battalion Chief Randy Hansen D’Arcy Morgan DHS / ODP City of Seattle TOPOFF-2 Central Planning Staff

  3. Everyone’s Input is Necessary • Private • Public • Local • Regional • State • Contractor • Federal City of Seattle TOPOFF-2 Central Planning Staff

  4. Proportionate Preparation Time • TableTop – TTX • CommandPost – CPX • FullScale – FSE City of Seattle TOPOFF-2 Central Planning Staff

  5. Determine the Exercise Type • No – Notice • Focus on a few simple objectives • Limited – Knowledge • Simple objectives with some specific complexities • Open Book • Complexity enhanced yet manageable City of Seattle TOPOFF-2 Central Planning Staff

  6. Experience Dictates Outcome • Exercise Planners MUST have: • Subject matter knowledge • Exercise design experience • Exercise production experience • If not – outside Contractor must be: • Experienced • Trustworthy • Reliable City of Seattle TOPOFF-2 Central Planning Staff

  7. Establish Responsibilities Early • “Planning Team” aka Production • Everything necessary to “produce” the play • “Trusted Agents” and Lead Planners • Core Planning Team • Before ~ During ~ After the event • Continuity is critical for key positions City of Seattle TOPOFF-2 Central Planning Staff

  8. Establish Responsibilities Early • “Participants” aka Responders • All the response elements to the event • Drives the Logistics side of Planning • Must be involved early on to be proactive for specific logistics needs • Should use this process to identify current SOP gaps and do real-world plan revisions City of Seattle TOPOFF-2 Central Planning Staff

  9. Remember... " The value is not the plan ... but the planning itself " City of Seattle TOPOFF-2 Central Planning Staff

  10. To Maximize Your Outcome • Maximize venue input and collaboration • Determine objectives that drive strategies • Identify key players / planners early • Ensure continuity with planning partners • Establish cornerstone items early • Don’t be afraid to be Lee Iococca • If necessary, remember “NFW” City of Seattle TOPOFF-2 Central Planning Staff

  11. To Maximize Your Outcome • Establish the exercise timeline • Adhere to deliverable dates • Collective engagement and agreement by numerous agencies ~ herding cats • Set ground rules at the beginning • Solicit buy-in from participating agencies City of Seattle TOPOFF-2 Central Planning Staff

  12. Site Layout Issues – The Basics • Physical size requirements • Complexity / scope of the FSE • Objectives of the FSE • Realism versus real-world safety and security constraints • On-site / Off-site integration & logistics City of Seattle TOPOFF-2 Central Planning Staff

  13. Site Layout Issues – The Basics • Traffic considerations • Neighboring business impacts • Public anxiety • Crowd control • VIP’s and Observers • Media considerations City of Seattle TOPOFF-2 Central Planning Staff

  14. Site Overview Production Hinds Horton Airport Way Hanford 8th Ave Media City of Seattle TOPOFF-2 Central Planning Staff

  15. City of Seattle TOPOFF-2 Central Planning Staff

  16. City of Seattle TOPOFF-2 Central Planning Staff

  17. City of Seattle TOPOFF-2 Central Planning Staff

  18. City of Seattle TOPOFF-2 Central Planning Staff

  19. City of Seattle TOPOFF-2 Central Planning Staff

  20. City of Seattle TOPOFF-2 Central Planning Staff

  21. Security Issues – On / Off Site • Participant security inside the site (absolutely no weapons) • Roving internal security teams (armed) • Perimeter security (armed) • Visual identification • Personal (photo ID with Security Decal) • Weapons-free indication (wrist bands) • Vehicular clearance (grill bands) City of Seattle TOPOFF-2 Central Planning Staff

  22. Security Issues – On / Off Site • Pre-Credentialing wherever possible • Security Enhancement Decal • Criminal background checks (for non-government employees) • Responder “pre-staging” off-site • “Bubble-to-bubble” security process • Mobile credentialing process City of Seattle TOPOFF-2 Central Planning Staff

  23. Safety Plans • Responder Safety Officer(s) – in play • Exercise Safety Officers – Production • Role Player Safety Officers – Production • Integrated with real-world 9-11 system City of Seattle TOPOFF-2 Central Planning Staff

  24. Media Site City of Seattle TOPOFF-2 Central Planning Staff

  25. Ensure PIO / PAO’s are Involved • Proportionate to the profile of the event • Provide adequate time to address issues • Ensure that Subject Matter Experts (SME’s) and First Responders are involved in their planning meetings City of Seattle TOPOFF-2 Central Planning Staff

  26. Communications Plans • Responder’s internal plans • Production crews (on/off site) • Multiple venues • Responder Staging areas • Master Control Center • Traffic units • Cannot overload real-world systems • Combination of radio, cell, Nextels, video City of Seattle TOPOFF-2 Central Planning Staff

  27. Executive or Command Level • Ensure real-world political perspective • Early involvement • Confirm objectives match the Planning Team’s • Provide SME’s / First Responders at their planning meetings City of Seattle TOPOFF-2 Central Planning Staff

  28. VIP / Observer Stands City of Seattle TOPOFF-2 Central Planning Staff

  29. VIP’s, Observers • Get control from the beginning • Establish written ground rules • Distribute the rules far and wide • Stick to your rules, but determine exceptions ahead of time City of Seattle TOPOFF-2 Central Planning Staff

  30. Blast area aerial view City of Seattle TOPOFF-2 Central Planning Staff

  31. Blast props City of Seattle TOPOFF-2 Central Planning Staff

  32. Blast props City of Seattle TOPOFF-2 Central Planning Staff

  33. Blast props City of Seattle TOPOFF-2 Central Planning Staff

  34. Vehicle blast pattern City of Seattle TOPOFF-2 Central Planning Staff

  35. Vehicle tire City of Seattle TOPOFF-2 Central Planning Staff

  36. HazMat and too many others City of Seattle TOPOFF-2 Central Planning Staff

  37. Grey helmets & Safety City of Seattle TOPOFF-2 Central Planning Staff

  38. Treatment areas City of Seattle TOPOFF-2 Central Planning Staff

  39. Logistics Plans • Feeding and hydration • Port-a-lets • Shelters for weather issues • Power • Night operations considerations • Personnel parking / transportation • Responder requests – anticipated gaps City of Seattle TOPOFF-2 Central Planning Staff

  40. Evaluation and Controller Process • They must have experience in their respective disciplines • Exercise complexity and Evaluator experience should be commensurate • Start this process early to meet needs • No 20-something poli-sci grads (remember the warehouse inventory) City of Seattle TOPOFF-2 Central Planning Staff

  41. Evaluation and Controller Process • Must have exercise experience • “Exercise Command” structure should be as tight as your IC structure • Requires integrated “Trusted Agents” from key host agencies • Continuity is essential City of Seattle TOPOFF-2 Central Planning Staff

  42. Data Collection and Documentation • Establish the Process • Central collection POC and oversightis critical • On-field hotwash process is difficult,but worthwhile • Too much info isn’t possible • Collection delays cause data loss City of Seattle TOPOFF-2 Central Planning Staff

  43. Methods of Data Collection • Handwritten notebooks, pre-formatted • Consider pocket tape recorders (date/time stamp is helpful) • Disposable cameras with CD processing • Documentary crew for video and stills(including ‘The Creation of XXX”) City of Seattle TOPOFF-2 Central Planning Staff

  44. TOPOFF-2 “Data Collector Log” City of Seattle TOPOFF-2 Central Planning Staff

  45. Lessons Learned and the AAR • Applies to everyone involved • Planners • Production personnel • Controllers & Evaluators • Responders • Victims (role players) City of Seattle TOPOFF-2 Central Planning Staff

  46. The After-Action-Report/Review • Timely • Accurate • Complete • Minimally sanitized • Widely distributed • Readily available on-line(unless sensitive ~ FOUO) City of Seattle TOPOFF-2 Central Planning Staff

  47. KEY ISSUES FOR PLANNING • Exercise Planners MUST have: • Subject matter knowledge • Exercise design experience • Exercise production experience City of Seattle TOPOFF-2 Central Planning Staff

  48. Questions ? • D’Arcy Morgandarcy.morgan@dhs.gov(202) 305-3307 • Sergeant Debra Jelcickdebbie.jelcick@seattle.gov(206) 684-0469 • Battalion Chief Randy Hansenrandy.hansen@seattle.gov(206) 465-3643 • Jim Papineaupapineau@amti.net City of Seattle TOPOFF-2 Central Planning Staff

More Related