STADIUL DERUL ĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ – REABILITARE STRAZI la data de 15.09.2007. S tr ă zi î n Execuţie 2007. 89 străzi şi tronsoane de străzi în execuţie în anul 2007 din care: a. 51 str ă zi cu sistem rutier finalizat b. 30 străzi în execuţie

sheryl
Download Presentation

S tr ă zi î n Execuţie 2007

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ – REABILITARE STRAZI la data de 15.09.2007

  2. Străzi în Execuţie 2007 • 89 străzi şi tronsoane de străzi în execuţie în anul 2007 din care: • a. 51 străzi cu sistem rutier finalizat • b. 30 străzi în execuţie • c. 8 străzi în pregatire pentru începerea execuţiei STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  3. Pachet IV(lucrari in continuare din anul 2005, cu finantare din credit BEI) Bd. T. Vladimirescu – in executie Termen contractual de finalizare: 31.12.2007 Stadiul lucrarii la 15.09.2007: - sens I - Calea Rahovei - Calea 13 Septembrie - finalizat - sens II - in executie STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  4. Artera de strapungere Str. D-na Ghica – Bd. Chisinau + pasaj suprateran peste CF (Heliade intre Vii – Sos. Pantelimon) - in executie Termen contractual de finalizare: 15.10.2008 Stadiul lucrarii la 15.09.2007: - tronson I(Heliade intre Vii - CF) - balast stabilizat - tronson II - balast de fundatie STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  5. Modernizare Piata Eroii Revolutiei + Pasaj pietonal subteran - in executie Termen contractual de finalizare: 04.05.2008 Stadiul lucrarii la 15.09.2007: - carosabil - strat binder - pasaj pietonal - in executie STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  6. Imbunatatire conditii de circulatie Piata Muncii Termen contractual de finalizare: 03.04.2010 Stadiul lucrarii la 15.09.2007: in pregatire pentru inceperea executiei STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  7. Imbunatatire conditii de circulatie Piata Obor in executie Termen contractual de finalizare: 03.11.2009 Stadiul lucrarii la 15.09.2007: - cale rulare tramvai - in executie STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  8. Reabilitare Str. I.Ionescu de la Brad - Supralargire Str. Gh. Ionescu - Sisesti Termen contractual de finalizare: 15.11.2007 Stadiul lucrarii la 15.09.2007: Reabilitare Str. IonIonescu de la Brad - sistem rutier finalizatSupralargire Str. Gh. Ionescu - Sisesti - in executie STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  9. Bd. 1 Decembrie 1918 (Bd. Th. Pallady - B.dul Basarabia) Termen contractual de finalizare: 01.03.2008 Stadiul lucrarii la 15.09.2007: sistem rutier finalizat STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  10. Reabilitare Sos.Colentina(Pod Voluntari – Sos. Mihai Bravu) • Termen contractual de finalizare: 01.04.2008 • Stadiul lucrarii la 15.09.2007: • tronson - Pod Voluntari - Depou Colentina – finalizat • - tronson - Obor - str. Turmelor – finalizat • - tronson - D.na Ghica - Fundeni - in executie • - tronson - Fundeni - Depou Colentina - in executie STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  11. Calea Mosilor (Sos.Mihai Bravu - Piata Unirii) Termen contractual de finalizare: 02.04.2008 Stadiul lucrarii la 15.09.2007: - tronson - Obor-Paleologu(sistem rutier) - finalizat - tronson - Paleologu - Sf.Gheorghe - in executie STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  12. Sos. Oltenitei (Pta. Eroii Revolutiei - Pta. Sudului – ROMPRIM) Termen contractual de finalizare: 02.11.2007 Stadiul lucrarii la 15.09.2007: - tronson Piata Eroii Revolutiei - Piata Sudului - in executie - tronson Piata Sudului - ROMPRIM - cale rulare tramvai - in executie STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  13. Bd.Iancu de Hunedoara (Piata Victoriei - Calea Dorobanti) Termen contractual de finalizare: 03.12.2007 Stadiul lucrarii la 15.09.2007: cale rulare tramvai si sistem rutier - in executie STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  14. Sos.Stefan cel Mare (Calea Dorobanti – Bucur Obor) Termen contractual de finalizare: 03.07.2008 Stadiul lucrarii la 15.09.2007: cale rulare tramvai si sistem rutier - in executie STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  15. Pachet XIX sistem rutier finalizat Calea Giulesti Drumul Sabarenilor Bd. Laminorului Str. Polona STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  16. Pachet XIX sistem rutier finalizat Soseaua Giurgiului Calea Serban Voda Soseaua Bucuresti-Magurele STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  17. Pachet XX Termen contractual de finalizare: 19.10.2007 Stadiul lucrarii la 15.09.2007: Str. Caraiman – in executie Bd. Ficusului –sistem rutier finalizat Str. Barajul Dunarii –in pregatire pentru inceperea executiei STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  18. Pachet XX Termen contractual de finalizare: 19.10.2007 Stadiul lucrarii la 15.09.2007: Str. Caraiman – in executie Bd. Ficusului –sistem rutier finalizat Str. Barajul Dunarii –in pregatire pentru inceperea executiei STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  19. Pachet XX Termen contractual de finalizare: 19.10.2007 Stadiul lucrarii la 15.09.2007: Str. Caraiman – in executie Bd. Ficusului –sistem rutier finalizat Str. Barajul Dunarii –in pregatire pentru inceperea executiei STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  20. Pachet XXII Termen contractual de finalizare: 18.10.2007 Stadiul lucrarii la 15.09.2007: B-dul Dinicu Golescu -sistem rutier finalizat Str. Vasile Parvan -sistem rutier finalizat Str. Av. Popisteanu -sistem rutier finalizat Aleea Privighetorilor -sistem rutier finalizat STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  21. Pachet XXII Termen contractual de finalizare: 18.10.2007 Stadiul lucrarii la 15.09.2007: B-dul Dinicu Golescu -sistem rutier finalizat Str. Vasile Parvan -sistem rutier finalizat Str. Av. Popisteanu -sistem rutier finalizat Aleea Privighetorilor -sistem rutier finalizat STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  22. Pachet XXII Termen contractual de finalizare: 18.10.2007 Stadiul lucrarii la 15.09.2007: B-dul Dinicu Golescu -sistem rutier finalizat Str. Vasile Parvan -sistem rutier finalizat Str. Av. Popisteanu -sistem rutier finalizat Aleea Privighetorilor -sistem rutier finalizat STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  23. Pachet XXIII Termen contractual de finalizare: 18.10.2007 Stadiul lucrarii la 15.09.2007: Str. Pajurei - in pregatire pentru inceperea executiei Str. Delea Veche - in executie Str. Dianei - in executie Str. Iancu Cavaler de Flondor - carosabil finalizat Str. Cornisei – sistem rutier finalizat Str. Dimitrie Grozdea – sistem rutier finalizat Str. Ionescu Grigore arh.- sistem rutier finalizat STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  24. Pachet XXIII Termen contractual de finalizare: 18.10.2007 Stadiul lucrarii la 15.09.2007: Str. Pajurei - in pregatire pentru inceperea executiei Str. Delea Veche - in executie Str. Dianei - in executie Str. Iancu Cavaler de Flondor - carosabil finalizat Str. Cornisei – sistem rutier finalizat Str. Dimitrie Grozdea – sistem rutier finalizat Str. Ionescu Grigore arh.- sistem rutier finalizat STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  25. Pachet XXIII Termen contractual de finalizare: 18.10.2007 Stadiul lucrarii la 15.09.2007: Str. Pajurei - in pregatire pentru inceperea executiei Str. Delea Veche - in executie Str. Dianei - in executie Str. Iancu Cavaler de Flondor - carosabil finalizat Str. Cornisei – sistem rutier finalizat Str. Dimitrie Grozdea – sistem rutier finalizat Str. Ionescu Grigore arh.- sistem rutier finalizat STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  26. Pachet XXIII Termen contractual de finalizare: 18.10.2007 Stadiul lucrarii la 15.09.2007: Str. Pajurei - in pregatire pentru inceperea executiei Str. Delea Veche - in executie Str. Dianei - in executie Str. Iancu Cavaler de Flondor - carosabil finalizat Str. Cornisei – sistem rutier finalizat Str. Dimitrie Grozdea – sistem rutier finalizat Str. Ionescu Grigore arh.- sistem rutier finalizat STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  27. Pachet XXIV Termen contractual de finalizare: 15.11.2007 Stadiul lucrarii la 15.09.2007: Str. Reinvierii - sistem rutier finalizat Str. Ziduri Mosi - sistem rutier finalizat Str. Matei Basarab - sistem rutier finalizat Str. Delea Noua - sistem rutier finalizat Str. Vulturilor – in executie Str. Postavarului - sistem rutier finalizat STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  28. Pachet XXIV Termen contractual de finalizare: 15.11.2007 Stadiul lucrarii la 15.09.2007: Str. Reinvierii - sistem rutier finalizat Str. Ziduri Mosi - sistem rutier finalizat Str. Matei Basarab - sistem rutier finalizat Str. Delea Noua - sistem rutier finalizat Str. Vulturilor – in executie Str. Postavarului - sistem rutier finalizat STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  29. Pachet XXIV Termen contractual de finalizare: 15.11.2007 Stadiul lucrarii la 15.09.2007: Str. Reinvierii - sistem rutier finalizat Str. Ziduri Mosi - sistem rutier finalizat Str. Matei Basarab - sistem rutier finalizat Str. Delea Noua - sistem rutier finalizat Str. Vulturilor – in executie Str. Postavarului - sistem rutier finalizat STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  30. Pachet XXV Termen contractual de finalizare: 18.10.2007 Stadiul lucrarii la 15.09.2007: Str. Izvorul Rece – carosabil finalizat Str. Emil Racovita– carosabil finalizat Str. Popa Nan– carosabil finalizat Str. Turnu Magurele– carosabil finalizat Str. Croitoru V. sold. – carosabil finalizat STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  31. Pachet XXV Termen contractual de finalizare: 18.10.2007 Stadiul lucrarii la 15.09.2007: Str. Izvorul Rece – carosabil finalizat Str. Emil Racovita– carosabil finalizat Str. Popa Nan– carosabil finalizat Str. Turnu Magurele– carosabil finalizat Str. Croitoru V. sold. – carosabil finalizat STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  32. Pachet XXV Termen contractual de finalizare: 18.10.2007 Stadiul lucrarii la 15.09.2007: Str. Izvorul Rece – carosabil finalizat Str. Emil Racovita– carosabil finalizat Str. Popa Nan– carosabil finalizat Str. Turnu Magurele– carosabil finalizat Str. Croitoru V. sold. – carosabil finalizat STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  33. Pachet XXVI Termen contractual de finalizare: 18.10.2007 Stadiul lucrarii la 15.09.2007: Str. Luica – carosabil finalizat Str. Anghel Alexandru– carosabil finalizat Str. Dr. Bagdasar – carosabil finalizat Str. Carlibaba – in executie Drumul Sarii- in pregatire pentru inceperea executiei Str. Caporal Preda – carosabil finalizat STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  34. Pachet XXVI Termen contractual de finalizare: 18.10.2007 Stadiul lucrarii la 15.09.2007: Str. Luica – carosabil finalizat Str. Anghel Alexandru– carosabil finalizat Str. Dr. Bagdasar – carosabil finalizat Str. Carlibaba – in executie Drumul Sarii- in pregatire pentru inceperea executiei Str. Caporal Preda – carosabil finalizat STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  35. Pachet XXVI Termen contractual de finalizare: 18.10.2007 Stadiul lucrarii la 15.09.2007: Str. Luica – carosabil finalizat Str. Anghel Alexandru– carosabil finalizat Str. Dr. Bagdasar – carosabil finalizat Str. Carlibaba – in executie Drumul Sarii- in pregatire pentru inceperea executiei Str. Caporal Preda – carosabil finalizat STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  36. Pachet XXVII Termen contractual de finalizare: 18.10.2007 Stadiul lucrarii la 15.09.2007: Str. Calea Ferentari - carosabil finalizat Str. Prelungirea Ferentari - carosabil finalizat Str. Gh. Marinescu- sistem rutier finalizat STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  37. Pachet XXVII Termen contractual de finalizare: 18.10.2007 Stadiul lucrarii la 15.09.2007: Str. Calea Ferentari - carosabil finalizat Str. Prelungirea Ferentari - carosabil finalizat Str. Gh. Marinescu- sistem rutier finalizat STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  38. Pachet XXVIII Termen contractual de finalizare: 20.10.2007 Stadiul lucrarii la 15.09.2007: Str. Dr. Rainer - sistem rutier finalizat Str. Petre Ispirescu – in pregatire pentru inceperea executiei Str. Fabrica de Chibrituri –in executie Str. Sebastian- in executie Str. Buzoieni - sistem rutier finalizat STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  39. Pachet XXIX Termen contractual de finalizare: 13.10.2007 Stadiul lucrarii la 15.09.2007: Str. Toporasi - carosabil finalizat Str. Zetarilor- sistem rutier finalizat Str. Apusului- in executie Str.Ciurel - sistem rutier finalizat Str. Lujerului - carosabil finalizat Str. Moinesti -sistem rutier finalizat Str. Petre Popovat- sistem rutier finalizat Str. Piatra Craiului - sistem rutier finalizat Str. Regiei -sistem rutier finalizat STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  40. Pachet XXIX Termen contractual de finalizare: 13.10.2007 Stadiul lucrarii la 15.09.2007: Str. Toporasi - carosabil finalizat Str. Zetarilor- sistem rutier finalizat Str. Apusului- in executie Str.Ciurel - sistem rutier finalizat Str. Lujerului - carosabil finalizat Str. Moinesti -sistem rutier finalizat Str. Petre Popovat- sistem rutier finalizat Str. Piatra Craiului - sistem rutier finalizat Str. Regiei -sistem rutier finalizat STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  41. Pachet XXIX Termen contractual de finalizare: 13.10.2007 Stadiul lucrarii la 15.09.2007: Str. Toporasi - carosabil finalizat Str. Zetarilor- sistem rutier finalizat Str. Apusului- in executie Str.Ciurel - sistem rutier finalizat Str. Lujerului - carosabil finalizat Str. Moinesti -sistem rutier finalizat Str. Petre Popovat- sistem rutier finalizat Str. Piatra Craiului - sistem rutier finalizat Str. Regiei -sistem rutier finalizat STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  42. Pachet XXX Termen contractual de finalizare: 18.10.2007 Stadiul lucrarii la 15.09.2007: Str. 1 Mai - in pregatire pentru inceperea executiei Str. George Enescu - in pregatire pentru inceperea executiei Str. Dr. Felix – in executie Str. Franklin - in pregatire pentru inceperea executiei Str. Tepes Voda –in executie Str. Coralilor – in executie Str. Popa Nicolae – carosabil finalizat STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  43. Pachet XXX Termen contractual de finalizare: 18.10.2007 Stadiul lucrarii la 15.09.2007: Str. 1 Mai - in pregatire pentru inceperea executiei Str. George Enescu - in pregatire pentru inceperea executiei Str. Dr. Felix – in executie Str. Franklin - in pregatire pentru inceperea executiei Str. Tepes Voda –in executie Str. Coralilor – in executie Str. Popa Nicolae – carosabil finalizat STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  44. Pachet XXX Termen contractual de finalizare: 18.10.2007 Stadiul lucrarii la 15.09.2007: Str. 1 Mai - in pregatire pentru inceperea executiei Str. George Enescu - in pregatire pentru inceperea executiei Str. Dr. Felix – in executie Str. Franklin - in pregatire pentru inceperea executiei Str. Tepes Voda –in executie Str. Coralilor – in executie Str. Popa Nicolae – carosabil finalizat STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  45. Pachet XXX Termen contractual de finalizare: 18.10.2007 Stadiul lucrarii la 15.09.2007: Str. 1 Mai - in pregatire pentru inceperea executiei Str. George Enescu - in pregatire pentru inceperea executiei Str. Dr. Felix – in executie Str. Franklin - in pregatire pentru inceperea executiei Str. Tepes Voda –in executie Str. Coralilor – in executie Str. Popa Nicolae – carosabil finalizat STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  46. Pachet XXXI Termen contractual de finalizare: 18.10.2007 Stadiul lucrarii la 15.09.2007: Calea Floreasca – in executie Str. Jandarmeriei – in executie Str. Oaspetilor – sistem rutier finalizat STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  47. Pachet XXXI Termen contractual de finalizare: 18.10.2007 Stadiul lucrarii la 15.09.2007: Calea Floreasca – in executie Str. Jandarmeriei – in executie Str. Oaspetilor – sistem rutier finalizat STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  48. Străzi preluate de la sectorul 5 Termen contractual Stadiul lucrarii la 15.09.2007 Str. Gheorghieni 15.10.2007sistem rutier finalizat Str. Popeia Corneliu 24.11.2007in executie Str. Anul 1821 15.10.2007in executie Str. Raditei 15.10.2007 sistem rutier finalizat STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  49. Străzi preluate de la sectorul 5 Termen contractual Stadiul lucrarii la 15.09.2007 Str. Lespezi 24.11.2007 in executie Str. Spatarul Preda 15.10.2007sistem rutier finalizat Str. Baiulescu Ion 24.11.2007in executie Str. Bratasanca 23.11.2007in executie Str. Bazaltului 15.10.2007sistem rutier finalizat STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ

  50. Străzi preluate de la sectorul 5 Termen contractual Stadiul lucrarii la 15.09.2007 Str. Politiei 23.11.2007in executie Str. Sapientei 24.11.2007in executie STADIUL DERULĂRII PROIECTELOR DE INVESTIŢII ÎN INFRASTRUCTURA URBANĂ