1 / 14

CIVA Status

Philae Science Team Meeting. CIVA Status. Venezia, Palazzo Cavalli Franchetti March 31, 2009. Civa overall status. Overall good health

shiela
Download Presentation

CIVA Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Philae Science Team Meeting CIVA Status Venezia, Palazzo Cavalli Franchetti March 31, 2009

  2. Civa overall status • Overall good health • For what could be tested (all but the IR detectors), all systems work nominally: the 7 CIVA-P cameras, CIVA-M/V in three colours, CIVA-M/I Infrared spectral-imager.

  3. CIVA-P CAM 1 01:53:21 LOBT

  4. Cratères with a pretty good image quality: resolution, focus

  5. calibration oven

  6. empty oven (# 7)

  7. empty oven (# 7) empty oven (# 7) 10 µm spot

  8. Civa status • Overall good health • For what could be tested (all but the IR detectors), all systems work nominally: the 7 CIVA-P cameras, CIVA-M/V in three colors. • Demonstrated by MSB CIVA-P images and by imaging ovens • ESB1 + MSB provided an accurate photometric calibration • SONC processing of data is perfect • But 2 concerns remained before PC8 • Data transfer quality and rate from and to CDMS (before CDMS SW upload) • Need to have access to lower integration times for CIVA/P in case of bright areas on the comet (and for ESB3) to avoid saturation.

  9. CIVA-P CAM 1 01:53:21 LOBT

  10. CIVA Status: PC8 results • Extensive verification of the data transmission integrity between CIVA and CDMS in both ways, after upload of a new CDMS software. • Quality of the link has been greatly improved after the CDMS upload. • Tested with CIVA but valid for the whole payload. • Measurements of the data transmission speed is mainly unchanged with respect to previous version (up to 11 kbits/sec in direct, and 8 kbits/sec to EEPROM)

  11. CIVA Status: PC8 results • New CIVA Software 7.8 gives access to integration times down to 4 msec. • After that upload, the instrument generated repeatedly simulated images instead of real images (both with panoramic cameras and with M/V microscope). • Simulated images are generated autonomously by the CIVA DPU instead of real images incase of detection of a transmission anomaly from the camera (interrupt counter) • The transition from nominal to degraded behavior seems related to the time of the upload. • Behavior never experienced on any ground reference model (IAS or DLR). • Need for a contingency activity slot • Request of specific activities for the PC8 contingency slot

  12. CIVA Status: PC8 contingency activities • First activity was to repeat the PC8 panorama image acquisition : • All images were nominal !!! • the problem experienced during PC8 seems not directly related to software upgrade, but to change in the instrument environment. • Another repeat of CIVA/P and CIVA/MV acquisitions was performed, again with all data fully nominal. • The downgrade back to previous Software version has been canceled • Request of detailed analysis of the configuration of the system: • Philae configuration (use of redundant systems ?), • Temperatures, • Power supply voltage and currents, • Other ongoing activities in Philae (instruments and systems) and Rosetta Orbiter • No concluding evidences have been found yet.

  13. CIVA : Plan / rationale for PC10 • Plan / rationale for PC10 • Standard instrument check-out. • Upload of a more robust Software in order to avoid generation of simulated images in case of partial failure of data transmission between the CIVA camera and DPU. • Software still under development and test at IAS. • Participation in integrated test sequences representative of the Comet phase: • SD2/COSAC/CIVA-M combined operations • CIVA-P participation in ROLIS SDL test with data transfer in CDMS Mass Memory • CIVA-P participation in CONSERT Interference test

  14. CIVA : other future activities • Plan / rationale for PC 12 • Health check & Participation in integrated test sequences representative of the Comet phase, including CDMS and Lander system status. • Plan / rationale for ESB3 & Lutetia • No participation foreseen if Philae workload too heavy. • Plan / rationale for SDL • Imaging of the Lander soon after release (distance of less than 100 m) with later transfer of the data during descent if possible. • First priority remains panoramic imaging just after Landing, and quick transfer of those data to Earth (landing validation and characterization.