230 likes | 408 Views
IDS PLX Solution & ADQ. Simone Gabriele Air Navigation Division, Static and Dynamic Data Management - Product Manager V ia Flaminia, 1068 - 00189 Rome, Italy Phone: +39 06 33217 468 E-mail: s.gabriele@idscorporation.com. ADQ IMPLEMENTATION WORKSHOP EUROCONTROL HQ
E N D
IDS PLX Solution & ADQ Simone Gabriele Air Navigation Division, Static and Dynamic Data Management - Product Manager Via Flaminia, 1068 - 00189 Rome, Italy Phone: +39 06 33217 468 E-mail: s.gabriele@idscorporation.com ADQ IMPLEMENTATION WORKSHOP EUROCONTROL HQ 28-29 May -2013, Brussels
Outline • AIS Data Process and ADQ: Workflow Traceability • IDS AIS/AIM PLX: Overview • Case history: PLX at ENAV and AUSTROCONTROL • IDS PLX solution for ADQ compliancy AeroSig 2012: AIS/AIM Breakout session
AIS DATA PROCESS AND ADQ: WORKFLOW TRACEABILITY • IDS AIS/AIM PLX: Overview • Case history: PLX at ENAV and AUSTROCONTROL • IDS PLX solution for ADQ compliancy AeroSig 2012: AIS/AIM Breakout session
AIS / AIM Process and ADQ: Quality, Workflow Traceability Aeronautical Data Quality (ADQ): domain example AeroSig 2012: AIS/AIM Breakout session
AIS / AIM process implementation at an ANSP: ADQ requirements AeroSig 2012: AIS/AIM Breakout session
AIS Data Process and ADQ: Workflow Traceability • IDS AIS/AIM PLX: OVERVIEW • Case history: PLX at ENAV and AUSTROCONTROL • IDS PLX solution for ADQ compliancy AeroSig 2012: AIS/AIM Breakout session
IDS Solution Digital Data Translators ICE Charting Design Dept. Aerocatalog AeroDB Originators AeroPub Publishing NOTAM GFeaman Aeronautical Database Validation Rejected Approved Aeronautical Catalog CRONOS Collection Analysis Validation Publication PLX ICE - Demo
IDS Solution to the AIS Data Process Management The system tracks all the operations performed by the actors, including comments , remarks and messages. Search interfaces are provided for analysis and reporting. AeroSig 2012: AIS/AIM Breakout session
AIS Data Process and ADQ: Workflow Traceability • IDS AIS/AIM PLX: Overview • CASE HISTORY: PLX AT ENAV AND AUSTROCONTROL • IDS PLX solution for ADQ compliancy AeroSig 2012: AIS/AIM Breakout session
PLX IMPLEMENTATION PROJECTS: CASE HISTORY – PLX AT ENAV • Case History: PLX AT ENAV • Reference / Point of Contact: • Giulio Melilli • Aeronautical Information Service • Head of Aeronautical Data Management/Quality and Production Unit • EnavS.p.A. • Via Salaria, 716 - 00138 Roma - Italia • Tel. +39 06 81662051 • Cell. +39 331 6231490 • giulio.melilli@enav.it • www.enav.it AeroSig 2012: AIS/AIM Breakout session
ENAV CASE HISTORY: Implementation Timeline (1 of 3)
ENAV CASE HISTORY: Operations (2 of 3)
ENAV CASE HISTORY: PLX configuration (3 of 3)
PLX IMPLEMENTATION PROJECTS: CASE HISTORY – PLX AT AUSTROCONTROL • Case History: PLX AT AUSTROCONTROL • Reference / Point of Contact: • Robert WehoferAeronautical Information Management (AIM)Manager Static Data Management (SDM)Austro Control GmbHTowerstrasse, Objekt 120A-1300 Flughafen Wienwww.austrocontrol.atTelefon: +43(0) 51703 3281Mobil: +43(0)664 964 8601Fax: +43(0) 51703 2036E-Mail: robert.wehofer@austrocontrol.at AeroSig 2012: AIS/AIM Breakout session
AUSTROCONTROL CASE HISTORY: Implementation Timeline (1 of 3) More and more originators will be integrated !
AUSTROCONTROL CASE HISTORY: Operations (2 of 3)
AUSTROCONTROL CASE HISTORY: PLX configuration (3 of 3)
PLX IMPLEMENTATION PROJECTS: BENEFITS & ADQ SUPPORT AeroSig 2012: AIS/AIM Breakout session
PLX IMPLEMENTATION PROJECTS: OPEN POINTS, ACTIONS AeroSig 2012: AIS/AIM Breakout session
CONCLUSIONS • PLX has been adopted for the Workflow Management and Traceability of the AIS process at two major european ANSPs • Full configurability allowed to match the AIS goals by tailoring the system to local AIS needs • dedicated web forms have been designed to simplify the Data Collection / Origination • dedicated Workflows could be deployed to make more efficient the processing of any data • The capability to store any action performed at workflow level (processing history) and at system level (transactions) supports the implementation of the ADQ requirements • THE SYSTEM WILL BE FURTHER DEVELOPED TO IMPROVE ORIGINATION AND AUTOMATION
Questions? AeroSig 2012: AIS/AIM Breakout session