1 / 18

Integrated Development of Tribal Families

THROUGH Wadi – Project ( Agri - Horti based Livelihood) Block – Bangra , District – Jhansi(U.P). Integrated Development of Tribal Families. Supported by-: NABARD & Implemented by. Haritika

shino
Download Presentation

Integrated Development of Tribal Families

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. THROUGH Wadi– Project (Agri- Horti based Livelihood) Block –Bangra , District – Jhansi(U.P) Integrated Development of Tribal Families Supported by-: NABARD & Implemented by Haritika Gwalior Road,BehindGovt.Girls Polytechnic MahendraPuri,Jhansi,UP,India Cell: 09450041708,09425894727

  2. About the project • Villages in the project- 24 • Proposed Families- 1000 • Proposed Scheduled Tribe Families to be benefitted-3152

  3. Component of project • Wadi Establishment • Soil & Water Conservation Measures • Water Resource Management • Health/Education Component • Women Development • Micro-finance Initiatives • Capacity Building Training • Operation & Maintainance

  4. Major Problems & Need of Interventions in Mahoba District The major problems in Mahoba District reflected inthe Human Development and Gender Development Indices are-: • Lack of drinking water accessibility • Negative impacts on livestock population. • Extreme shortage of water, this is an addition to the loss of agriculture, the major source of livelihood. • It has bearing on the health of the people i.e. causing malnutrition, diarrhea etc. • Disturbed the socio-economic fabric results in large scale migration of people. • Depletion in ground water table due to over dependence for domestic, industrial and irrigation purpose.

  5. A glimpse of problem

  6. TARGET V/S ACHIEVEMENT

  7. TARGET V/S ACHIEVEMENT

  8. TARGET V/S ACHIEVEMENT

  9. TARGET V/S ACHIEVEMENT

  10. Details about receipt & expenditure • Amount received up to 30/06/2012-1,60,95,000 • Grant Component • Cumulative expenditure up to 30/06/2012-1,01,02,589 • Loan Component-8,57,260 • Total cumulative expenditure up to 30/06/2012-1,09,59,849

  11. Meetings with community

  12. Water Conservation Initiatives

  13. Soil Conservation Initiatives

  14. Core wadi component

  15. Livelihood component

  16. Women development initiative

  17. WHAT ELSE IS NEEDED ? • Tar fencing in the project area. • For recharging of wells, 20 check-dams is needed. • 30 diesel pumps for irrigation purpose. • 50 dug-wells for irrigation purpose. • 2 drinking water supply schemes in village Moryana & Kuinya.

  18. There are millions of such faces that are waiting for millions of years for smile on their faces. Those faces make us realize-: “This is not the End. Sky is the Limit.” THANKS

More Related